 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/26/2024 |
401510334 |
03 |
A3 |
P APPROVED |
03/01/2024 |
|
GOLDBERG |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 04/25/2024
|
|
Work on Floor(s): 001
|
| 01/03/2024 |
401510334 |
02 |
A3 |
P APPROVED |
02/02/2024 |
|
GOLDBERG |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 04/25/2024
|
|
Work on Floor(s): 001
|
| 01/11/2023 |
440764772 |
01 |
A3 |
R PERMIT-ENTIRE |
05/16/2024 |
0075694 PE |
SHEIKH |
|
NOT APPLICABLE
|
|
BPP IN CONJUNCTION WITH JOB #401466775.
|
|
Work on Floor(s): OSP
|
| 01/10/2023 |
440764763 |
01 |
A3 |
D A/P ENTIRE |
01/10/2023 |
0075694 PE |
SHEIKH |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/12/2023 BPP IN CONJUNCTION WITH JOB #401466775.
|
|
Work on Floor(s): OSP
|
| 01/10/2023 |
440764709 |
01 |
A3 |
D A/P ENTIRE |
01/10/2023 |
0075694 PE |
SHEIKH |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/10/2023 BPP IN CONJUNCTION WITH JOB #401466775.
|
|
Work on Floor(s): OSP
|
| 01/29/2021 |
401466775 |
08 |
NB |
P APPROVED |
01/14/2023 |
|
HAKEEM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 09/19/2019 |
401466775 |
07 |
NB |
J P/E DISAPPROVED |
10/15/2019 |
|
HAKEEM |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 10/15/2020 PRPOSED TO CHANGE FIRST FLOOR AS BOTH COMMERCIAL
|
|
Work on Floor(s): CEL 001 thru 004
|
| 11/14/2018 |
401466775 |
06 |
NB |
P APPROVED |
05/17/2019 |
0080511 PE |
HAKEEM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 11/22/2011 |
401466775 |
05 |
NB |
P APPROVED |
07/11/2012 |
0075694 PE |
SHEIKH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 07/21/2011 |
401466775 |
04 |
NB |
P APPROVED |
07/21/2011 |
|
SHEIKH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 04/17/2007 |
401466775 |
03 |
NB |
P APPROVED |
05/04/2007 |
0075694 RA |
SHEIKH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 04/30/2003 |
401579136 |
01 |
A3 |
X SIGNED OFF |
05/04/2005 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
Install scaffold 25ft long by 40ft high at 30-86 14th street inconjunctio
|
|
Work on Floor(s): 001
|
| 04/30/2003 |
401578869 |
01 |
A3 |
X SIGNED OFF |
05/04/2005 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
Installation of heavy duty sidewalk shed 25ft long at at 30-86 14th Stree
|
|
Work on Floor(s): 001
|
| 08/19/2002 |
401466775 |
02 |
NB |
R PERMIT-ENTIRE |
09/30/2003 |
0010059 RA |
GOLDBERG |
|
NOT APPLICABLE
|
|
FOUNDATION FOR NEW BUILDING EXCAVATION A ND PILINGS
|
|
Work on Floor(s): CEL 001 thru 004
|
| 08/13/2002 |
401510334 |
01 |
A3 |
R PERMIT-ENTIRE |
08/16/2002 |
0010059 RA |
GOLDBERG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/25/2024 BPP FILED IN CONJUNCTION WITH NB # 401466775
|
|
Work on Floor(s): 001
|
| 06/05/2002 |
401466775 |
01 |
NB |
R PERMIT-ENTIRE |
03/28/2025 |
0080511 PE |
HAKEEM |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL 001 thru 004
|