| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/15/2020 |
421961256 |
01 |
A2 |
R PERMIT-ENTIRE |
12/18/2025 |
0075384 PE |
TOMS |
|
NOT APPLICABLE
|
|
DECOMMISSION OF EXISTING NYCWIN TELECOM SITE. REMOVE ALL ANTENNAS AND EQUI
|
|
Work on Floor(s): PEN,RF
|
| 07/12/2016 |
421264848 |
03 |
A2 |
P APPROVED |
07/15/2016 |
|
ESTILOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 010
|
| 06/04/2016 |
421256198 |
02 |
A2 |
P APPROVED |
06/07/2016 |
|
BRYAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 04/26/2016 |
421318434 |
01 |
A3 |
R PERMIT-ENTIRE |
04/26/2016 |
0023945 RA |
MAHLER |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): GRD
|
| 02/10/2016 |
421264839 |
01 |
A2 |
X SIGNED OFF |
06/06/2018 |
0073954 PE |
ESTILOW |
|
NOT APPLICABLE
|
|
MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED. NO CHANGE
|
|
Work on Floor(s): 010
|
| 02/10/2016 |
421264811 |
01 |
A2 |
X SIGNED OFF |
09/16/2016 |
0073954 PE |
ESTILOW |
|
NOT APPLICABLE
|
|
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM, AS PER PLANS FILED HEREWITH.
|
|
Work on Floor(s): 010
|
| 02/10/2016 |
421264848 |
02 |
A2 |
X SIGNED OFF |
10/18/2016 |
0073954 PE |
ESTILOW |
|
NOT APPLICABLE
|
|
MODIFICATION TO THE EXISTING HVAC SYSTEM AND PLUMBING FIXTURES, AS PER PLA
|
|
Work on Floor(s): 010
|
| 02/10/2016 |
421264848 |
01 |
A2 |
X SIGNED OFF |
10/18/2016 |
0017735 RA |
RYAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATIONS TO THE EXISTING TENANT SPACE (WELLS FARGO). NO CHANGE
|
|
Work on Floor(s): 010
|
| 01/20/2016 |
421256198 |
01 |
A2 |
R PERMIT-ENTIRE |
01/22/2016 |
0033855 RA |
BRYAN |
|
NOT APPLICABLE
|
|
VARIOUS PARTITION, SUSPENDED CEILING, WALL AND FLOOR FINISH CHANGES ON PAR
|
|
Work on Floor(s): 006
|
| 11/10/2015 |
440266702 |
01 |
A3 |
R PERMIT-ENTIRE |
11/17/2015 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF HOIST AS PER PLANS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY.
|
|
Work on Floor(s): GRD
|
| 11/02/2015 |
421221555 |
02 |
A3 |
P APPROVED |
11/06/2015 |
|
MAHLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GRD
|
| 10/01/2015 |
421221555 |
01 |
A3 |
R PERMIT-ENTIRE |
10/01/2015 |
0023945 RA |
MAHLER |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): GRD
|
| 09/11/2015 |
440250675 |
01 |
A3 |
R PERMIT-ENTIRE |
09/20/2016 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, E
|
|
Work on Floor(s): GRD
|
| 04/14/2015 |
421149545 |
02 |
A2 |
X SIGNED OFF |
12/14/2016 |
0087111 PE |
LAUFS |
|
NOT APPLICABLE
|
|
RENOVATION OF EXTERIOR FACADE ON THE 001-010 FLOORS. STRUCTURAL WORK. NO C
|
|
Work on Floor(s): 001 thru 010
|
| 04/14/2015 |
421149545 |
01 |
A2 |
X SIGNED OFF |
12/14/2016 |
0034521 RA |
COMODROM |
|
NOT APPLICABLE
|
|
RENOVATION OF EXTERIOR FACADE ON THE 001-010 FLOORS. ARCHITECTURAL WORK. N
|
|
Work on Floor(s): 001 thru 010
|
| 06/12/2014 |
420997096 |
01 |
A2 |
R PERMIT-ENTIRE |
06/25/2014 |
0052439 PE |
CHETRIT |
|
NOT APPLICABLE
|
|
FILE FOR THE ADDITIONS AND MODIFICATIONS TO THE EXISTING CLASS 'E' FIRE AL
|
|
Work on Floor(s): 006
|
| 02/20/2014 |
420949031 |
01 |
A2 |
X SIGNED OFF |
03/03/2020 |
0052439 PE |
CHETRIT |
|
NOT APPLICABLE
|
|
REMOVAL OF EXISTING SPRINKLER SYSTEM (EXCEPT EXISTING MAIN AND SPRINKLER L
|
|
Work on Floor(s): 006
|
| 02/20/2014 |
420949040 |
01 |
A2 |
X SIGNED OFF |
09/23/2014 |
0018181 RA |
ELMAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF PARTITIONS, SUSPENDED CEILING AND FLOORING ON THE 6TH FLOO
|
|
Work on Floor(s): 006
|
| 02/20/2014 |
420949040 |
02 |
A2 |
X SIGNED OFF |
09/23/2014 |
0052439 PE |
CHETRIT |
|
NOT APPLICABLE
|
|
INSTALL AC UNITS, ASSOCIATED PIPING, DUCTWORK, PLUMBING FIXTURES & SPRINKL
|
|
Work on Floor(s): 006,005
|
| 10/18/2013 |
420909841 |
02 |
A2 |
X SIGNED OFF |
05/16/2014 |
0052439 PE |
CHETRIT |
|
NOT APPLICABLE
|
|
INSTALLATION OF HVAC EQUIPMENT AND ASSOCIATED PIPING AND VARIOUS DUCTWORK
|
|
Work on Floor(s): 002
|
| 10/18/2013 |
420909841 |
01 |
A2 |
X SIGNED OFF |
05/16/2014 |
0018181 RA |
ELMAN |
|
NOT APPLICABLE
|
|
VARIOUS PARTITION, SUSPENDED CEILING AND FLOORING CHANGES ON PART OF 2ND F
|
|
Work on Floor(s): 002
|
| 03/14/2013 |
420822916 |
01 |
A3 |
X SIGNED OFF |
08/09/2018 |
0089902 PE |
NINNISAI |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLAN. WORK SHALL COMPLY WITH 2008 BUI
|
|
Work on Floor(s): OSP
|
| 03/23/2012 |
420547652 |
01 |
A2 |
X SIGNED OFF |
05/02/2012 |
0018181 RA |
ELMAN |
|
NOT APPLICABLE
|
|
PARTITIONS DEMOLITION. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY
|
|
Work on Floor(s): 006
|
| 02/27/2012 |
420533382 |
01 |
A2 |
X SIGNED OFF |
05/21/2012 |
0061152 PE |
GEIGER |
|
NOT APPLICABLE
|
|
FILING FOR STRUCURAL SUPPORT FOR BOILER ROOM. ALL FEE PAID UNDER 420490052
|
|
Work on Floor(s): ROF 006 thru 010
|
| 12/01/2011 |
420490052 |
03 |
A2 |
X SIGNED OFF |
07/30/2012 |
0018181 RA |
ELMAN |
|
NOT APPLICABLE
|
|
SUBSEQUENT APPLICANT FILING FOR SHEETROCK FOR ENCLOSURE.
|
|
Work on Floor(s): ROF 006 thru 010
|
| 11/30/2011 |
420318409 |
02 |
A3 |
P APPROVED |
12/16/2011 |
|
BRAY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 10/20/2011 |
420490052 |
02 |
A2 |
P APPROVED |
12/05/2011 |
0055504 PE |
GEIGER |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/07/2011 FILING FOR STRUCTURAL SUPPORT FOR BOILER ROOM
|
|
Work on Floor(s): ROF 006 thru 010
|
| 10/20/2011 |
420490052 |
01 |
A2 |
X SIGNED OFF |
07/30/2012 |
0055504 PE |
DEPINTO |
|
NOT APPLICABLE
|
|
TO FILE FOR NEW BOILER ROO, WITH 4 NEW BOILERS & CHIMNEY ON 6HT FLOOR. RUN
|
|
Work on Floor(s): ROF 006 thru 010
|
| 01/28/2011 |
420318409 |
01 |
A3 |
X SIGNED OFF |
12/16/2011 |
0086064 PE |
BRAY |
|
NOT APPLICABLE
|
|
INSTALLING A HVAC UNIT ON THE ROOF. PROPOSED HVAC UNIT FILED IN CONJUNCTIO
|
|
Work on Floor(s): ROF
|
| 03/31/2010 |
420168348 |
02 |
A2 |
X SIGNED OFF |
09/23/2010 |
0083202 PE |
KANTERAK |
|
NOT APPLICABLE
|
|
VARIOUS AIR CONDITIONING DUCTWORK CHANGES ON PART OF THE 9TH FLOOR IN SPAC
|
|
Work on Floor(s): 009
|
| 03/31/2010 |
420168348 |
01 |
A2 |
X SIGNED OFF |
09/23/2010 |
0018181 RA |
ELMAN |
|
NOT APPLICABLE
|
|
VARIOUS PARTITION, SUSPENDED CEILING AND FLOORING CHANGES ON PART OF THE 9
|
|
Work on Floor(s): 009
|
| 08/20/2007 |
402652544 |
01 |
A3 |
X SIGNED OFF |
04/16/2009 |
0081318 PE |
LONGO |
|
NOT APPLICABLE
|
|
INSTALLING TELECOMMUNICATION CABINET ONNEW STEEL PLATFORM WITH ACCESS L
|
|
Work on Floor(s): ROF
|
| 01/17/2007 |
402515444 |
01 |
A2 |
X SIGNED OFF |
03/03/2009 |
0017642 RA |
LEE |
|
NOT APPLICABLE
|
|
RELOCATE EXISTING HEADS AND INSTALL NEWHEADS AS PER PLANS SUBMITTED
|
|
Work on Floor(s): 003 thru 005 007 thru 009
|
| 12/29/2006 |
402517308 |
01 |
A2 |
X SIGNED OFF |
06/04/2009 |
0030635 RA |
Huntsman |
|
NOT APPLICABLE
|
|
Interior renovation, partition and ceiling work as indicated on plans file
|
|
Work on Floor(s): 003,004,005,007,008,009
|
| 12/29/2006 |
402517308 |
02 |
A2 |
X SIGNED OFF |
06/04/2009 |
0054305 PE |
Ambrosin |
|
NOT APPLICABLE
|
|
Mechanical and plumbing modifications as indicated on plans filed herewith
|
|
Work on Floor(s): 003,004,005,007,008,009
|
| 12/26/2006 |
402516639 |
01 |
A2 |
R PERMIT-ENTIRE |
01/03/2007 |
0071502 PE |
FISHER |
|
NOT APPLICABLE
|
|
PROPOSED TO FILE FOR THE REPLACEMENT OFAND ADDITIONS TO THE EXISTING AP
|
|
Work on Floor(s): CEL,ROF 001 thru 010
|
| 01/16/2002 |
401120354 |
04 |
A2 |
P APPROVED |
01/16/2002 |
0017739 RA |
SCARANO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002
|
| 08/03/2001 |
401120354 |
03 |
A2 |
P APPROVED |
09/28/2001 |
0017739 RA |
SCARANO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002
|
| 07/13/2001 |
401120354 |
02 |
A2 |
P APPROVED |
09/28/2001 |
0017739 RA |
SCARANO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002
|
| 07/17/2000 |
401120354 |
01 |
A2 |
X SIGNED OFF |
04/02/2002 |
0017739 RA |
SCARANO |
|
NOT APPLICABLE
|
|
PROPOSED ALTERATION TO EXISTING OFFICE BLDG INCLUDING THE DEMOLITION &
|
|
Work on Floor(s): BAS,001,002
|