| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/06/2013 |
420603797 |
02 |
A2 |
P APPROVED |
03/09/2013 |
|
PACIFICO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 07/10/2012 |
420603797 |
01 |
A2 |
X SIGNED OFF |
04/01/2013 |
0066182 PE |
PACIFICO |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR ENERGY SYSTEM ON ROOF. NO CHANGE OF USE, EGRESS, OR
|
|
Work on Floor(s): ROF
|
| 06/20/2008 |
410126858 |
01 |
A3 |
X SIGNED OFF |
11/01/2010 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
INSTALL PIPE SCAFFOLD 648 FT LONG BY 60 FT HIGH.DURING REMEDIAL REPAIRS. W
|
|
Work on Floor(s): OSP
|
| 12/18/2007 |
410036900 |
01 |
A2 |
R PERMIT-ENTIRE |
09/24/2009 |
0028785 RA |
ORLANDO |
|
NOT APPLICABLE
|
|
ROOF REPLACEMENT AND EXTERIOR FACADE REPAIRS AS SHOWN ON DRAWINGS. IF SI
|
|
Work on Floor(s): FAC,ROF
|
| 11/21/2007 |
410033770 |
01 |
A3 |
R PERMIT-ENTIRE |
01/07/2009 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SIDEWALK SHED TOTAL OF 1290 FT LONG AT 68-09 BURNS STRE
|
|
Work on Floor(s): 001
|