| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/13/2018 |
421149956 |
02 |
A3 |
P APPROVED |
09/19/2018 |
|
ADELY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 06/29/2016 |
421224614 |
01 |
A2 |
X SIGNED OFF |
12/05/2018 |
0048838 PE |
MERRITT |
|
NOT APPLICABLE
|
|
MASONRY AND LINTEL REPLACEMENT ON ALL FLOORS OF THE FACADE PER PLANS SUBMI
|
|
Work on Floor(s): FAC 001 thru 006
|
| 04/21/2015 |
421149956 |
01 |
A3 |
X SIGNED OFF |
12/11/2018 |
0063658 PE |
ADELY |
|
NOT APPLICABLE
|
|
MODIFICATION OF EXISTING TELECOMMUNICATIONS FACILITY. INSTALLATION OF REMO
|
|
Work on Floor(s): ROF
|
| 01/16/2007 |
402525362 |
01 |
A3 |
R PERMIT-ENTIRE |
01/18/2007 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 120' DURING MASONRY
|
|
Work on Floor(s): 001
|
| 12/04/2006 |
402504287 |
01 |
A2 |
X SIGNED OFF |
02/06/2007 |
0048883 PE |
MERRITT |
|
NOT APPLICABLE
|
|
MASONRY REPAIRS AS PER PLANS. BUILDINGIS SET BACK, NO SIDEWALK SHED IS
|
|
Work on Floor(s): FAC
|
| 07/01/2005 |
402165090 |
01 |
A2 |
X SIGNED OFF |
06/16/2006 |
0766991 PE |
SCHEIDT |
|
NOT APPLICABLE
|
|
INSTALLIONG TELECOMMUNICATIONS CABINETS WITH RELATED DUNNAGE AND ANTENNA
|
|
Work on Floor(s): ROF
|
| 10/29/2001 |
401377933 |
01 |
A2 |
X SIGNED OFF |
09/10/2002 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
ABANDON BURIED 10000 GALLON FUEL OIL TANK AND FUEL OIL TANK ENCLOSURE
|
|
Work on Floor(s): CEL,OSP
|
| 06/15/2000 |
401109778 |
01 |
A2 |
R PERMIT-ENTIRE |
08/25/2000 |
0069428 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
CONVERSION FROM #4 OIL TO #2 OIL AND NAT URAL GAS.NO CHANGE IN USE EGRES
|
|
Work on Floor(s): CEL
|