BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z117196
NO JOBS FOUND WITH YOUR CRITERIA
Premises: 118 VERMILYEA AVENUE MANHATTAN BIN: 1064919     Block: 2235   Lot: 29
   

Filed: 120 VERMILYEA AV Census Tract:   293 Health Area:  0110
SIDEWALK SHED Admin Area:   Z - UPPER MANHATTAN Inspection Area:   A
NEW YORK, NY 10034 Community Board:   112
DOB Cross Street(s):   WEST 204 STREET,    WEST 207 STREET
Status:   K - CLOSED/CANCELLED 09/10/2010
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  05/09/2008 1:33 AM
Application Entered:   05/09/2008 Job Start Date:   05/09/2008
Last Change:   09/10/2010 Job End Date:   05/09/2009
Appointment Status:   
Last Inspection By:   DORSAINVILLE, R       On     09/04/2010      
Field Disp:   K - OK TO CANCEL
Energize Recommendation:  
Objection Disposition:  

License #: 012063 Licensee Name: GREGORY BARTOCCI
Firm: 003754 Firm Name: CORE ELEC & COMMUNICATION
Firm Phone: 718-605-3597  Firm Address: 40 MARBLE LOOP SUITE G STATEN ISLAND NY 10309 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
2 - TEMPORARY CONSTRUCTION
6 - GENERAL WIRING
Total Fee:  $78.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   SIDEWALK SHED
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: ROCKLEDGE SCAFFOLD CORP
Authorized Representative:  JEREMIAH HARRINGTON
Relationship To Owner:   OWNER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  1  1 20-AMP
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  1  1 CONDUCTOR
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  1 1-PHASE
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                       
Total Units : 4 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  LIGHTS AND WIRING FOR A SIDEWALK SHED.

 
Inspection Details
 

*NO JOBS FOUND WITH YOUR CRITERIA
INSPECTION FOR APPLICATION #: Z117196
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 09/04/2010 09/10/2010 RID K (15) (0) Y
INSPECTION COMMENTS: INSTALLED & REMOVED TEMP WIRING