![]() |
|
|
| NYC Department of Buildings | ||
| Job Overview | ||
|
|||||
| ARA / LAA Job Overview |
| Page: 1 of 1 | ||
| Premises: 42-15 COLLEGE POINT BOULEVARD QUEENS | BIN: 4115048 Block: 5101 Lot: 1 | |
| FILE DATE | JOB # | JOB TYPE | JOB STATUS | STATUS DATE | LIC # | APPLICANT | ||
| 06/08/2015 | 440225043 | PR | I LAA SIGNED OFF | 02/04/2016 | MP 000772 | GLEIXNER | ||
| REPLACE BATHROOM FIXTURES ON EXISTING ROUGHING. RELOCATE KITCHEN SINK AND | ||||||||
|
Work on Floor(s): 025 | ||||||||
| 08/23/2013 | 420759209 | PR | I LAA SIGNED OFF | 07/10/2014 | OBI 002728 | LE DUC | ||
| REMOVAL OF ELECTRIC PRE HEATER AND SIDE ARM HEATER AND INSTALLATION OF ANT | ||||||||
|
Work on Floor(s): BAS | ||||||||
| 07/20/2001 | 401331750 | PR | I LAA SIGNED OFF | 08/15/2001 | MP 000772 | GLEIXNER | ||
| CON ED SHUT DOWN METER FEEDING APT 45C-STOVE ONLY FOR LEAK IN LINE. WE WI | ||||||||
|
Work on Floor(s): 004 | ||||||||