 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/21/2017 |
421434594 |
01 |
A3 |
X SIGNED OFF |
06/12/2017 |
0086064 PE |
BRAY |
|
NOT APPLICABLE
|
|
INSTALLATION OF TELECOMMUNICATIONS EQUIPMENT CABINET ON STEEL PLATFORM AND
|
|
Work on Floor(s): ROF
|
| 08/15/2012 |
420585343 |
02 |
A3 |
P APPROVED |
08/16/2012 |
|
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF PIPE SCAFFOLD AS PER PLAN A
|
|
Work on Floor(s): OSP
|
| 06/25/2012 |
420585352 |
01 |
A3 |
X SIGNED OFF |
01/28/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BU
|
|
Work on Floor(s): OSP
|
| 06/22/2012 |
420585343 |
01 |
A3 |
X SIGNED OFF |
01/28/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLAN AT 21-06 LINDEN STREET. DURING R
|
|
Work on Floor(s): OSP
|
| 06/19/2012 |
420582890 |
01 |
A2 |
X SIGNED OFF |
12/10/2012 |
0074869 PE |
KHANZADA |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO REPAIR EXISTING FACADE OF BUILDING INCLUDING PARAPET
|
|
Work on Floor(s): 001 thru 004
|
| 12/15/2009 |
420104639 |
02 |
A3 |
D A/P ENTIRE |
12/16/2009 |
|
BRAY |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 09/18/2017
|
|
Work on Floor(s): ROF
|
| 11/12/2009 |
420104639 |
01 |
A3 |
X SIGNED OFF |
10/05/2017 |
0086064 PE |
BRAY |
|
NOT APPLICABLE
|
|
INSTALLATION OF TELECOMMUNICATIONS CABINETS, RELATED DUNNAGE, AND RELATED
|
|
Work on Floor(s): ROF
|
| 02/21/2002 |
401412226 |
01 |
A3 |
X SIGNED OFF |
05/11/2005 |
0023658 RA |
ALLEN |
|
NOT APPLICABLE
|
|
Work on Floor(s): GRD
|
| 02/17/1998 |
400819851 |
01 |
A2 |
R PERMIT-ENTIRE |
02/26/1998 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
REPLACE GAS BOILER
|
|
Work on Floor(s): CEL
|