 |  |  |  |  |  |  |  |  |  |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
10/23/2017 |
440433345 |
02 |
A2 |
P APPROVED |
11/29/2017 |
|
POMPEO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003,ROF
|
09/11/2017 |
440433345 |
01 |
A2 |
R PERMIT-ENTIRE |
02/21/2018 |
0028075 RA |
POMPEO |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR THE INTERIOR REPAIR / RENOVATION OF EXISTING 3RD FLO
|
|
Work on Floor(s): 003,ROF
|
07/10/2017 |
440418353 |
01 |
A3 |
X SIGNED OFF |
07/27/2018 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|