 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/11/2020 |
421897825 |
02 |
A2 |
P APPROVED |
02/12/2020 |
0078515 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 12/19/2019 |
421890573 |
02 |
A2 |
P APPROVED |
01/14/2020 |
0078515 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 006
|
| 12/12/2019 |
440578251 |
01 |
A2 |
X SIGNED OFF |
01/11/2021 |
0091829 PE |
GARCIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW ADA RAMP
|
|
Work on Floor(s): GRD
|
| 03/20/2019 |
421890573 |
01 |
A2 |
X SIGNED OFF |
03/30/2021 |
0078515 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
FILING FOR REPIPE GAS DISTRIBUTION SYSTEM THROUGHOUT BUILDING AS PER PLANS
|
|
Work on Floor(s): CEL 001 thru 006
|
| 03/01/2019 |
421897825 |
01 |
A2 |
X SIGNED OFF |
11/04/2020 |
0078515 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
FILING FOR REGISTRATION OF LAUNDRY ROOM & EQUIPMENT AS PER PLANS.
|
|
Work on Floor(s): CEL
|
| 03/30/2018 |
440392031 |
02 |
A2 |
P APPROVED |
04/10/2018 |
|
GARCIA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 05/01/2017 |
421168284 |
07 |
A2 |
P APPROVED |
12/11/2017 |
0022382 RA |
TARTAGLI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 04/03/2017 |
440392031 |
01 |
A2 |
R PERMIT-ENTIRE |
03/23/2018 |
0091829 PE |
GARCIA |
|
NOT APPLICABLE
|
|
MINOR INTERIOR RENOVATION OF APT 6N.
|
| 03/02/2017 |
421168284 |
06 |
A2 |
P APPROVED |
03/08/2017 |
|
GUTHARTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 05/04/2016 |
440239564 |
02 |
A2 |
P APPROVED |
01/18/2017 |
|
GARCIA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,006
|
| 04/04/2016 |
421168284 |
05 |
A2 |
P APPROVED |
04/12/2016 |
|
GUTHARTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 02/17/2016 |
421168284 |
04 |
A2 |
P APPROVED |
03/04/2016 |
|
GUTHARTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 12/21/2015 |
440276979 |
01 |
A3 |
X SIGNED OFF |
10/06/2016 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 12/16/2015 |
421168284 |
03 |
A2 |
P APPROVED |
01/14/2016 |
|
GUTHARTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 11/07/2015 |
421030770 |
02 |
A2 |
P APPROVED |
11/10/2015 |
|
GUTHARTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 006
|
| 08/19/2015 |
440239564 |
01 |
A2 |
X SIGNED OFF |
01/20/2017 |
0091829 PE |
GARCIA |
|
NOT APPLICABLE
|
|
FACADE MASONRY REPAIRS
|
|
Work on Floor(s): 001,006
|
| 08/15/2015 |
421168284 |
02 |
A2 |
P APPROVED |
08/18/2015 |
|
GUTHARTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 06/15/2015 |
421168284 |
01 |
A2 |
R PERMIT-ENTIRE |
06/17/2015 |
0022382 RA |
TARTAGLI |
|
NOT APPLICABLE
|
|
RENOVATION OF APARTMENT 6E ON 6TH FLOOR
|
|
Work on Floor(s): 006
|
| 02/07/2015 |
440191999 |
03 |
A2 |
P APPROVED |
02/10/2015 |
|
BAZINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF
|
| 01/05/2015 |
440191999 |
02 |
A2 |
P APPROVED |
01/06/2015 |
|
BAZINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF
|
| 12/18/2014 |
440191999 |
01 |
A2 |
X SIGNED OFF |
05/02/2016 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE LOW PRESSURE BOILER AND GAS/OIL BURNER. INSTALL NEW METAL CHIMNEY
|
|
Work on Floor(s): CEL,ROF
|
| 09/17/2014 |
421030770 |
01 |
A2 |
R PERMIT-ENTIRE |
09/17/2014 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
REPLACE PLUMBING FIXTURES ON EXISTING ROUGHING IN ALL APTS.
|
|
Work on Floor(s): CEL 001 thru 006
|
| 07/20/2012 |
420596411 |
01 |
A2 |
X SIGNED OFF |
08/27/2014 |
0069428 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
CONVERSION TO #2 OIL AND NATURAL GAS .
|
|
Work on Floor(s): CEL
|
| 06/11/2009 |
420037695 |
02 |
A2 |
P APPROVED |
06/12/2009 |
|
ESTRELLA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 03/27/2009 |
420037695 |
01 |
A2 |
X SIGNED OFF |
08/07/2009 |
0020842 RA |
ESTRELLA |
|
NOT APPLICABLE
|
|
DEMOLITION OF NON BEARING PARTITIONS AND DOORS. CONSTRUCTION OF NEW NON BE
|
|
Work on Floor(s): CEL
|
| 10/12/2004 |
402020237 |
01 |
A3 |
R PERMIT-ENTIRE |
10/19/2004 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 263 LINEAR FT.DURING FACADE RE
|
|
Work on Floor(s): 001
|
| 03/28/2003 |
401628798 |
01 |
A3 |
X SIGNED OFF |
02/09/2004 |
0043105 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
INSTALL EXTERIOR ROLL UP SECURITY GATE PER PLAN FILED HEREWITH. NO CHANGE
|
|
Work on Floor(s): 001
|
| 07/28/1999 |
400995170 |
01 |
A2 |
X SIGNED OFF |
09/10/1999 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
REPLACE BOILER WITH A NEW LOCHINVAR CWN9 85 GAS BOILER 985,000 BTU MEA#
|
|
Work on Floor(s): CEL
|
| 11/01/1989 |
400036457 |
01 |
A2 |
X SIGNED OFF |
06/12/1990 |
0041242 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
TO REPLACE OIL BURNER. STRUCTURAL INTERGRITY TO REMAIN UNAFFECTED BY THIS
|
|
Work on Floor(s): GRD
|