 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/03/2018 |
421618244 |
01 |
A2 |
X SIGNED OFF |
02/23/2019 |
0039858 RA |
ROYE |
|
NOT APPLICABLE
|
|
MASONRY FACADE WORK AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
|
|
Work on Floor(s): 001 thru 007
|
| 05/05/2016 |
421323115 |
01 |
A2 |
X SIGNED OFF |
02/21/2017 |
0021487 RA |
HADJIYAN |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO INCLUDE PARKING GARAGE ROOF REPLACEMENT AS PER PLA
|
|
Work on Floor(s): CEL
|
| 05/19/2007 |
402588892 |
01 |
A3 |
X SIGNED OFF |
03/27/2012 |
0010059 RA |
Goldberg |
|
NOT APPLICABLE
|
|
Rebuild 50 linear ft of parapet on side of building.
|
|
Work on Floor(s): 001 thru 006
|
| 04/23/2007 |
402579857 |
01 |
A3 |
X SIGNED OFF |
12/22/2011 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 40' DURING FACADE REPAIR. NO CH
|
|
Work on Floor(s): 001
|
| 01/31/2006 |
402282383 |
01 |
A2 |
X SIGNED OFF |
06/27/2013 |
0069428 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
BOILER AND BURNER REPLACEMENT AND CONVERSION FROM#2 OIL TO TO #6 OIL. EX
|
|
Work on Floor(s): GRD
|
| 07/17/1990 |
400109002 |
01 |
A2 |
Q PERMIT-PARTIAL |
08/07/1990 |
0047135 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
REPLACEMENT 1 NEW 3,000 GALLON OIL TANK IN NEW 8"CONCRETE_BLOCK VAULT
|
|
Work on Floor(s): BAS
|