| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/30/2023 |
421482719 |
04 |
A1 |
P APPROVED |
12/20/2023 |
|
NG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 09/28/2020 |
421482719 |
03 |
A1 |
P APPROVED |
10/01/2020 |
|
NG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 03/17/2020 |
421482719 |
02 |
A1 |
P APPROVED |
04/13/2020 |
|
NG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 08/20/2019 |
440423052 |
02 |
A3 |
P APPROVED |
08/26/2019 |
|
BAILEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/18/2019 |
421209276 |
02 |
A2 |
P APPROVED |
07/17/2019 |
|
PERUMALA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,GND,OSP
|
| 11/08/2018 |
440521008 |
01 |
A2 |
X SIGNED OFF |
01/03/2020 |
0091829 PE |
GARCIA |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING 14L APT. ON 14TH FLOOR OF KYOTO BUILDING,
|
|
Work on Floor(s): 014
|
| 10/11/2018 |
440515701 |
01 |
A2 |
H P/E IN PROCESS |
10/11/2018 |
0091829 PE |
GARCIA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/09/2018 INTERIOR RENOVATION OF EXISTING 14L APT. ON 14TH
|
|
Work on Floor(s): 014
|
| 08/02/2017 |
440423052 |
01 |
A3 |
X SIGNED OFF |
09/09/2019 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 06/19/2017 |
421519798 |
01 |
A2 |
X SIGNED OFF |
07/09/2018 |
0086583 PE |
DEGUZMAN |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING WORK ON BASEMENT FOR ADULT DAY CARE CENTER AS PER
|
|
Work on Floor(s): BAS
|
| 05/11/2017 |
421482719 |
01 |
A1 |
X SIGNED OFF |
04/01/2024 |
0024574 RA |
NG |
|
NOT APPLICABLE
|
|
ALTERATION TYPE 1 APPLICATION WITH NO WORK TO BE DONE. PROPOSING A CHANGE
|
|
Work on Floor(s): BAS
|
| 05/04/2017 |
421476389 |
01 |
A2 |
X SIGNED OFF |
09/17/2018 |
0024574 RA |
NG |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION ON BASEMENT FOR ADULT DAY CARE CENTER AS PER PLANS FIL
|
|
Work on Floor(s): BAS
|
| 03/22/2017 |
420848140 |
04 |
A2 |
P APPROVED |
03/24/2017 |
|
PASECHNI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS
|
| 03/07/2017 |
421411181 |
03 |
A2 |
P APPROVED |
09/12/2017 |
|
DWYER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 01/25/2017 |
440376451 |
01 |
A2 |
X SIGNED OFF |
01/29/2018 |
0091829 PE |
GARCIA |
|
NOT APPLICABLE
|
|
INTERIOR AND BATHROOM RENOVATION AT APARTMENT 4M INCLUDING AND PLUMBING AS
|
| 12/23/2016 |
421412484 |
01 |
A2 |
X SIGNED OFF |
12/13/2017 |
0021487 RA |
HADJIYAN |
|
NOT APPLICABLE
|
|
MAIN ROOF RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRES
|
|
Work on Floor(s): ROF
|
| 12/14/2016 |
421411181 |
02 |
A2 |
X SIGNED OFF |
09/20/2017 |
0072039 PE |
DELPOZZO |
|
NOT APPLICABLE
|
|
SUBSEQUENT APPLICATION FOR MECHANICAL AND PLUMBING WORK AS PER PLANS FILED
|
|
Work on Floor(s): BAS
|
| 12/14/2016 |
421411181 |
01 |
A2 |
X SIGNED OFF |
09/20/2017 |
0022097 RA |
DWYER |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION ON COMMERCIAL SPACE INTO A WHITE-BOX AS PER PLANS FILE
|
|
Work on Floor(s): BAS
|
| 09/26/2016 |
421310183 |
02 |
A2 |
P APPROVED |
09/27/2016 |
|
JAMIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011
|
| 04/07/2016 |
421310183 |
01 |
A2 |
X SIGNED OFF |
03/22/2018 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATIONS TO INCLUDE BATHROOM CONVERSION AS PER PLANS FILED HER
|
|
Work on Floor(s): 011
|
| 01/26/2016 |
421259499 |
01 |
A2 |
P APPROVED |
01/26/2016 |
0091385 PE |
PASECHNI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/07/2018 ALTERATIONS TO EXISTING STANDPIPE SYSTEM TO A COM
|
|
Work on Floor(s): CEL
|
| 08/31/2015 |
421209276 |
01 |
A2 |
X SIGNED OFF |
07/31/2019 |
0073225 PE |
PERUMALA |
|
NOT APPLICABLE
|
|
RENOVATION OF PLAZA AND PARKING GARAGE #4 PARKING AREAS P & R WHICH INCLUD
|
|
Work on Floor(s): BAS,GND,OSP
|
| 07/04/2015 |
420848140 |
03 |
A2 |
P APPROVED |
07/09/2015 |
|
DERMEL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 02/03/2015 |
421078112 |
01 |
A2 |
X SIGNED OFF |
11/16/2016 |
0082001 PE |
ORLANDO |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK TO INCLUDE RECYCLABLE CONTAINER CONCRETE PADS 98-15 & 98-1
|
|
Work on Floor(s): 001,OSP
|
| 09/16/2014 |
440099377 |
03 |
A3 |
P APPROVED |
09/17/2014 |
|
WALSH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 05/02/2014 |
420583452 |
02 |
A2 |
P APPROVED |
05/07/2014 |
|
KRAMER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 016
|
| 04/29/2014 |
440099377 |
02 |
A3 |
P APPROVED |
05/01/2014 |
|
WALSH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/12/2013 |
440099377 |
01 |
A3 |
X SIGNED OFF |
08/04/2015 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT HEAVY DUTY SIDEWALK SHED PER DRAWINGS. INSTALLATION SHALL COMPLY WIT
|
|
Work on Floor(s): OSP
|
| 06/14/2013 |
420848140 |
02 |
A2 |
X SIGNED OFF |
12/06/2018 |
0091385 PE |
PASECHNI |
|
NOT APPLICABLE
|
|
98-15, 98-17, 98-23 & 98-25 HORACE HARDING EXPRESSWAY INTERIOR RENOVATIONS
|
|
Work on Floor(s): BAS
|
| 06/14/2013 |
420848140 |
01 |
A2 |
X SIGNED OFF |
12/06/2018 |
0023850 RA |
DERMEL |
|
NOT APPLICABLE
|
|
98-15, 98-17, 98-23 & 98-25 HORACE HARDING EXPRESSWAY. RENOVATIONS TO EXIS
|
|
Work on Floor(s): BAS
|
| 05/23/2013 |
420839472 |
01 |
A2 |
X SIGNED OFF |
11/01/2016 |
0025504 RA |
JOHNSON |
|
NOT APPLICABLE
|
|
98-15, 98-17, 98-23 & 98-25 HORACE HARDING EXPRESSWAY.REMOVAL AND INSTALLA
|
|
Work on Floor(s): 001
|
| 08/15/2012 |
420610486 |
01 |
PA |
P APPROVED |
09/05/2013 |
0023850 RA |
DERMEL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/28/2018
|
|
Work on Floor(s): BAS
|
| 08/15/2012 |
420610477 |
01 |
A1 |
Q PERMIT-PARTIAL |
08/08/2017 |
0023850 RA |
DERMEL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/26/2019 ALTERATION TYPE 1 APPLICATION TO CONSTRUCT AN ACC
|
|
Work on Floor(s): BAS
|
| 07/23/2012 |
420484158 |
02 |
A2 |
P APPROVED |
07/24/2012 |
|
GIANNOPO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 06/25/2012 |
420583452 |
01 |
A2 |
X SIGNED OFF |
07/18/2016 |
0020470 RA |
KRAMER |
|
NOT APPLICABLE
|
|
MASONRY FACADE WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): 001 thru 016
|
| 05/16/2012 |
420569520 |
01 |
PA |
J P/E DISAPPROVED |
05/21/2012 |
0023850 RA |
DERMEL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/20/2012
|
|
Work on Floor(s): BAS
|
| 01/24/2012 |
420526265 |
01 |
A1 |
J P/E DISAPPROVED |
02/06/2012 |
0023850 RA |
DERMEL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/20/2012 ALTERATION TYPE 1 APPLICATION TO CONSTRUCT AN ACC
|
|
Work on Floor(s): BAS
|
| 09/20/2011 |
420484158 |
01 |
A2 |
X SIGNED OFF |
07/31/2012 |
0030321 RA |
GIANNOPO |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PANELS ON THE ROOF OF BUILDING. NO CHANGE IN USE, EG
|
|
Work on Floor(s): ROF
|
| 08/06/2010 |
420202284 |
01 |
A3 |
X SIGNED OFF |
04/05/2013 |
0010059 RA |
GOLDBERG |
|
NOT APPLICABLE
|
|
SAW CUTTING,POINTING AND BRICK REPLACEMENT AT SOUTH FACADE APPRX.1050SF. S
|
|
Work on Floor(s): 001 thru 016
|
| 03/31/2010 |
420168491 |
01 |
A3 |
X SIGNED OFF |
04/09/2013 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL OF 160 LINEAR FEET BY 8 FEET APPROXIMATE HIGH HEAVY DUTY SID
|
|
Work on Floor(s): OSP
|
| 06/05/2009 |
420014004 |
02 |
A3 |
P APPROVED |
06/09/2009 |
|
WALSH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 ERECT A TOTAL OF 205 LINEAR FEET BY 14 FEET
|
|
Work on Floor(s): 001
|