| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/08/2022 |
421164073 |
03 |
A3 |
P APPROVED |
04/20/2022 |
|
TARDY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 11/23/2020 |
421164073 |
02 |
A3 |
P APPROVED |
02/16/2021 |
|
TARDY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 04/22/2019 |
440310030 |
03 |
A2 |
P APPROVED |
04/29/2019 |
|
MARDAREW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP
|
| 03/05/2019 |
440310030 |
02 |
A2 |
P APPROVED |
03/07/2019 |
|
MARDAREW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP
|
| 06/08/2018 |
421644563 |
01 |
A2 |
X SIGNED OFF |
05/06/2019 |
0079067 PE |
SEMIOLI |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND BURNER. CONNECT TO EXG GAS LINE AND METER. NO CHANGE IN
|
|
Work on Floor(s): CEL
|
| 05/06/2016 |
440310030 |
01 |
A2 |
X SIGNED OFF |
05/09/2019 |
0014996 RA |
MARDAREW |
|
NOT APPLICABLE
|
|
HEREBY FILING TO PROPOSE A NEW LAUNDRY ROOM LOCATED IN THE CELLAR AS PER P
|
|
Work on Floor(s): CEL,OSP
|
| 05/13/2015 |
421164073 |
01 |
A3 |
X SIGNED OFF |
05/25/2022 |
0079612 PE |
TARDY |
|
NOT APPLICABLE
|
|
INSTALLATION OF RRH UNITS ON ROOF. ALL WORK IN COMPLIANCE WITH TPPN 5/98.
|
|
Work on Floor(s): ROF
|
| 06/12/2013 |
440087040 |
01 |
A3 |
R PERMIT-ENTIRE |
06/12/2013 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
PROPOSED REPLACEMENT OF PARAPET WALL AS PER PLANS. SIDEWALK SHED FILED UND
|
|
Work on Floor(s): ROF
|
| 05/17/2013 |
440082562 |
01 |
A3 |
R PERMIT-ENTIRE |
07/11/2013 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 03/06/2013 |
420814471 |
01 |
A2 |
X SIGNED OFF |
04/24/2013 |
0056831 PE |
MOTWANI |
|
NOT APPLICABLE
|
|
REPAIRWORK OF 12 BALCONIES AS PER PLAN FILED WITH THIS APPLICATION. NO CH
|
|
Work on Floor(s): 001 thru 006
|
| 11/15/2010 |
420287040 |
01 |
A3 |
R PERMIT-ENTIRE |
11/15/2010 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 08/14/2002 |
401511253 |
01 |
A2 |
X SIGNED OFF |
12/05/2002 |
0068973 PE |
SOBIECH |
|
NOT APPLICABLE
|
|
INSTALLING TELECOMMUNI8CATION CABINETS A ND ANTENNAS WITH RELATED DUNNAG
|
|
Work on Floor(s): ROF
|
| 09/26/1997 |
400786627 |
01 |
A2 |
R PERMIT-ENTIRE |
10/15/1997 |
0069428 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
CONVERSION FROM #6 OIL @3 OIL AND NATURAL GAS. NO CHANGE IN USE
|
|
Work on Floor(s): CEL
|
| 12/10/1990 |
400146891 |
01 |
A2 |
X SIGNED OFF |
04/09/1991 |
0039958 PE |
KATZ |
|
NOT APPLICABLE
|
|
INSTAL TWO REFUSE COMPACTORS IN EXISTING INCINERATOR__ROOMS.NO CHANGE IN
|
|
Work on Floor(s): CEL
|