| 10/21/2024 |
421101765 |
07 |
A1 |
P APPROVED |
10/21/2024 |
|
SALIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,001,ROF
|
| 04/03/2023 |
421101765 |
06 |
A1 |
P APPROVED |
04/03/2023 |
|
SALIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,001,ROF
|
| 02/10/2023 |
421101765 |
05 |
A1 |
P APPROVED |
02/10/2023 |
|
SALIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,001,ROF
|
| 05/22/2019 |
421101970 |
01 |
A2 |
X SIGNED OFF |
05/03/2024 |
0075087 PE |
KATS |
|
NOT APPLICABLE
|
|
FIRE ALARM MODIFICATIONS ON SECOND FLOOR
|
|
Work on Floor(s): 002
|
| 05/16/2019 |
421101765 |
04 |
A1 |
R PERMIT-ENTIRE |
09/20/2021 |
0075087 PE |
KATS |
|
NOT APPLICABLE
|
|
SPRINKLER MODIFICATIONS
|
|
Work on Floor(s): 002
|
| 05/14/2019 |
421101765 |
01 |
A1 |
R PERMIT-ENTIRE |
04/17/2023 |
0032590 RA |
SALIB |
|
NOT APPLICABLE
|
|
REMOVE SECOND FLOOR ROOF PLAY YARD. ENCLOSE A PORTION OF SECOND FLOOR ROOF
|
|
Work on Floor(s): 002,001,ROF
|
| 05/14/2019 |
421101765 |
03 |
A1 |
R PERMIT-ENTIRE |
09/20/2021 |
0075087 PE |
KATS |
|
NOT APPLICABLE
|
|
CONSTRUCT NEW TOILET RM & INSTALL NEW SINK & DRINKING FOUNTAIN INSIDE NEW
|
|
Work on Floor(s): 002,001,003
|
| 05/14/2019 |
421101765 |
02 |
A1 |
R PERMIT-ENTIRE |
09/20/2021 |
0063672 PE |
BACAS |
|
NOT APPLICABLE
|
|
STRUCTURAL MODIFICATIONS TO SECOND FLOOR ROOF
|
|
Work on Floor(s): 002
|
| 04/18/2018 |
440477360 |
01 |
A2 |
R PERMIT-ENTIRE |
04/23/2018 |
0072981 PE |
STRACAR |
|
NOT APPLICABLE
|
|
MODIFY/REPAIR GAS PIPING LEAKS AS PER PLAN
|
|
Work on Floor(s): CEL
|
| 10/28/2005 |
401361744 |
20 |
NB |
P APPROVED |
10/28/2005 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PH 001 thru 004
|
| 10/28/2005 |
401361744 |
19 |
NB |
P APPROVED |
10/28/2005 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PH 001 thru 004
|
| 06/07/2004 |
401361744 |
18 |
NB |
P APPROVED |
06/07/2004 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 03/05/2004 |
401361744 |
17 |
NB |
P APPROVED |
03/05/2004 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 04/09/2003 |
401361744 |
16 |
NB |
P APPROVED |
04/09/2003 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 06
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 02/28/2003 |
401361744 |
15 |
NB |
P APPROVED |
02/28/2003 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 02/28/2003 |
401361744 |
14 |
NB |
P APPROVED |
02/28/2003 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 02/28/2003 |
401361744 |
13 |
NB |
P APPROVED |
02/28/2003 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 02/28/2003 |
401361744 |
12 |
NB |
P APPROVED |
02/28/2003 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 06
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 02/26/2003 |
401361744 |
11 |
NB |
P APPROVED |
02/26/2003 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 10/25/2002 |
401361744 |
10 |
NB |
P APPROVED |
10/25/2002 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 06/28/2002 |
401323046 |
01 |
A3 |
X SIGNED OFF |
09/27/2005 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
PS222 BUILDERS PAVEMENT PLAN IN CONJUNCT ION WITH NB 401361744
|
|
Work on Floor(s): OSP
|
| 04/12/2002 |
401416543 |
01 |
A2 |
R PERMIT-ENTIRE |
04/12/2002 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/12/2002 PS222 NEW FIRE ALARM IN CONJUNCTION WITH NEW BUI
|
|
Work on Floor(s): ENT,IRE
|
| 04/08/2002 |
401437165 |
01 |
A2 |
X SIGNED OFF |
10/29/2003 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
PS222NEW FIRE ALARM IN CONJUNCTION WITH NEW BUILDING, MASTER CODED, ADDR
|
|
Work on Floor(s): ENT,IRE
|
| 12/28/2001 |
401361744 |
09 |
NB |
P APPROVED |
12/28/2001 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 11/27/2001 |
401323233 |
01 |
PA |
R PERMIT-ENTIRE |
03/10/2006 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
Work on Floor(s): 1
|
| 10/31/2001 |
401317981 |
01 |
A3 |
X SIGNED OFF |
11/12/2002 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
PS222 SIDEWALK SHED IN CONJUNCTION WITH 401361744
|
|
Work on Floor(s): OSP
|
| 10/26/2001 |
401379502 |
01 |
A3 |
X SIGNED OFF |
11/21/2002 |
0058308 PE |
Guidice |
|
NOT APPLICABLE
|
|
Installation of a BEAVER 3000A hoist during building construction. LLW #21
|
|
Work on Floor(s): 001,008
|
| 07/31/2001 |
401328817 |
01 |
A2 |
X SIGNED OFF |
11/19/2002 |
0053541 PE |
HAHN |
|
NOT APPLICABLE
|
|
PS222 FIRE SUPPRESSION IN CONJUNCTION W / JOB 401328817
|
|
Work on Floor(s): OSP
|
| 05/30/2001 |
401336283 |
01 |
A3 |
X SIGNED OFF |
11/12/2002 |
0654301 PE |
HICKEY |
|
NOT APPLICABLE
|
|
PS222 SHED DURING NB CONSTRUCTION
|
|
Work on Floor(s): OSP
|
| 05/04/2001 |
401361744 |
08 |
NB |
X SIGNED OFF |
11/22/2005 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
P.S. 222Q; FILING DOC. 8 FOR FIRE PROTECTION PLAN.
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 05/04/2001 |
401361744 |
07 |
NB |
X SIGNED OFF |
11/22/2005 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
P.S. 222Q; FILING DOC. 7 FOR FUEL BURNING, FUEL STORAGE, EMERGENCY
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 05/04/2001 |
401361744 |
06 |
NB |
X SIGNED OFF |
11/22/2005 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
P.S. 222Q; FILING DOC. 6 FOR SPRINKLER STANDPIPE AND WATER MAIN.
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 05/04/2001 |
401361744 |
05 |
NB |
X SIGNED OFF |
11/22/2005 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
P.S.222Q; FILING FOR PLUMBING & MECHANIC AL FOR ENTIRE BUILDING.
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 05/04/2001 |
401361744 |
04 |
NB |
X SIGNED OFF |
11/22/2005 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
P.S. 222Q; FILING DOC. 4 FOR ENTIRE STRUCTURAL
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 05/04/2001 |
401361744 |
03 |
NB |
X SIGNED OFF |
11/22/2005 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
P.S. 222Q; FILING DOC 3 FOR UNDERGROUND PLUMBING ONLY.
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 05/04/2001 |
401361744 |
02 |
NB |
X SIGNED OFF |
11/22/2005 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
P.S. 222Q; DOC. 2 FOR THE ENTIRE NEW BUILDING.
|
|
Work on Floor(s): CEL,PH 001 thru 003
|
| 05/04/2001 |
401361744 |
01 |
NB |
X SIGNED OFF |
11/22/2005 |
0051123 PE |
LABIB |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL,PH 001 thru 004
|
| 04/23/2001 |
401334677 |
01 |
DM |
X SIGNED OFF |
11/12/2002 |
0070769 PE |
SA |
|
NOT APPLICABLE
|
|
Work on Floor(s): 1
|
| 03/26/1998 |
400841247 |
01 |
A3 |
J P/E DISAPPROVED |
04/13/1998 |
0059264 PE |
DRAPER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/17/2005 TEMPORARY PLACEMENT OF TWO TRAILERS ON THE TOP OF
|
|
Work on Floor(s): 001
|
| 02/19/1998 |
400774765 |
03 |
NB |
D A/P ENTIRE |
02/19/1998 |
0019966 RA |
BLUME |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/17/2005 NA
|
|
Work on Floor(s): CEL,PEN 001 thru 003 004 thru 005
|