| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/13/2015 |
421165660 |
02 |
A2 |
P APPROVED |
10/19/2015 |
|
GUTHARTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 05/20/2015 |
421165660 |
01 |
A2 |
R PERMIT-ENTIRE |
12/05/2017 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
REPLACE PLBG FIXTURES ON EXSTG ROUGHING THROUGHOUT BLDG
|
|
Work on Floor(s): 001 thru 004
|
| 04/25/2013 |
440074330 |
01 |
A3 |
X SIGNED OFF |
09/25/2013 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
PROPOSED FACADE WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): ROF
|
| 04/04/2013 |
440066367 |
01 |
A3 |
X SIGNED OFF |
10/09/2013 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 04/03/2013 |
440066376 |
01 |
A3 |
X SIGNED OFF |
09/20/2013 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD 38'HIGH ORIGINATING OFF SHED AS PE
|
|
Work on Floor(s): 002 thru 004
|
| 07/20/2012 |
420596402 |
01 |
A2 |
X SIGNED OFF |
04/17/2015 |
0069428 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
BURNER REPLACEMENT AND CONVERSION TO #2 OIL AND NATURAL GAS
|
|
Work on Floor(s): CEL
|
| 01/17/2003 |
401571367 |
01 |
A3 |
P APPROVED |
02/26/2003 |
OT |
SINGH |
|
NOT APPLICABLE
|
|
ERECT SIDE WALK SHED.COMPLY WITH LL 33/91 AND TPPN 9/99.
|
|
Work on Floor(s): 001
|