 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/06/2018 |
421664755 |
01 |
A2 |
P APPROVED |
09/13/2018 |
0020241 RA |
CALIENDO |
|
NOT APPLICABLE
|
|
HEREWITH FILE ALTERATION TYPE 2 TO DO A BOILER & PLUMBING WORK TYPE IN AN
|
|
Work on Floor(s): 001,004
|
| 01/07/2013 |
420329371 |
04 |
A2 |
D A/P ENTIRE |
01/07/2013 |
|
WEIGOLD |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 08/03/2013
|
|
Work on Floor(s): 001 thru 004
|
| 01/30/2012 |
420329371 |
03 |
A2 |
P APPROVED |
02/21/2012 |
|
WEIGOLD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 07/13/2011 |
420329371 |
02 |
A2 |
P APPROVED |
12/05/2011 |
0007226 RA |
WEIGOLD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 NEW SCOPE OF WORK " RENOVATE EXISTING EIGHT
|
|
Work on Floor(s): 001 thru 004
|
| 03/15/2011 |
420331331 |
01 |
A2 |
R PERMIT-ENTIRE |
07/17/2013 |
0007226 RA |
WEIGOLD |
|
NOT APPLICABLE
|
|
INSTALLATION OF 8 BOILERS
|
|
Work on Floor(s): 001 thru 004
|
| 03/07/2011 |
420329371 |
01 |
A2 |
R PERMIT-ENTIRE |
12/28/2011 |
0007226 RA |
WEIGOLD |
|
NOT APPLICABLE
|
|
NEW SCOPE OF WORK " RENOVATE EXISTING EIGHT (8) APARTMENTS ON THE FIRST, S
|
|
Work on Floor(s): 001 thru 004
|