 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/24/2024 |
421905175 |
02 |
A3 |
P APPROVED |
05/21/2024 |
0036866 RA |
SARKOR-C |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 12/06/2023 |
421692029 |
03 |
A1 |
P APPROVED |
01/23/2024 |
|
HEIM |
|
GRANTED 08/14/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|
| 01/14/2020 |
421692029 |
02 |
A1 |
X SIGNED OFF |
03/10/2025 |
0084716 PE |
KREMMIDA |
|
GRANTED 08/14/2020
|
|
FILING FOUNDATION WORK IN CONJUNCTION WITH ALT1 APPLICATION FOR THE RENOVA
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|
| 11/04/2019 |
421905175 |
01 |
A3 |
X SIGNED OFF |
02/19/2025 |
0036866 RA |
SARKOR-C |
|
NOT APPLICABLE
|
|
BPP FILED IN CONJUNCTION WITH ALT1 APPLICATION 421692029
|
|
Work on Floor(s): OSP
|
| 10/23/2018 |
421692029 |
01 |
A1 |
X SIGNED OFF |
03/10/2025 |
0019109 RA |
HEIM |
|
GRANTED 08/14/2020
|
|
RENOVATION OF 1ST FLOOR AND CELLAR WITH 2 STORY VERTICAL EXTENSION AND REA
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|