 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/11/2020 |
440079834 |
03 |
A3 |
P APPROVED |
09/29/2020 |
|
KAMBANIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/11/2020 |
440230028 |
03 |
A3 |
P APPROVED |
09/29/2020 |
|
KAMBANIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/30/2020 |
420862007 |
02 |
A2 |
P APPROVED |
09/23/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 5TH
|
| 08/20/2020 |
420503306 |
02 |
A3 |
P APPROVED |
09/01/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/20/2020 |
420493111 |
02 |
A3 |
P APPROVED |
08/24/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/20/2020 |
440230028 |
02 |
A3 |
P APPROVED |
08/24/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/20/2020 |
440079834 |
02 |
A3 |
P APPROVED |
08/24/2020 |
0028318 RA |
AMBANIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/20/2020 |
420786028 |
02 |
A2 |
P APPROVED |
12/07/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 07/21/2015 |
440235611 |
01 |
A3 |
X SIGNED OFF |
06/17/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
FACADE REPAIR, POINTING, THRU WALL FLASHING AT PARAPET, AND RE-CAULK WINDO
|
|
Work on Floor(s): 001 thru 004
|
| 07/02/2015 |
440230028 |
01 |
A3 |
X SIGNED OFF |
09/30/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 06/24/2015 |
440230019 |
01 |
A3 |
H P/E IN PROCESS |
06/24/2015 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/24/2015 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED
|
|
Work on Floor(s): OSP
|
| 07/13/2013 |
420844910 |
02 |
A3 |
P APPROVED |
08/21/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 06/25/2013 |
420862007 |
01 |
A2 |
X SIGNED OFF |
11/06/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION REPLACEING SHEET ROCK AND PLUMBING FIXTURES IN APT 5F
|
|
Work on Floor(s): 5TH
|
| 06/24/2013 |
420861204 |
01 |
A2 |
B A/P UNPAID |
06/24/2013 |
0029894 RA |
CIMINO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/13/2020 INTERIOR RENOVATION REPLACING SHEETROCK AND PLUMB
|
|
Work on Floor(s): 5TH
|
| 05/13/2013 |
420844910 |
01 |
A3 |
X SIGNED OFF |
08/24/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
SPOT POINTING AND CRACK FILL AS PER PLAN.NO CHANGE IN USE OCCUPANCY OR EGR
|
|
Work on Floor(s): 001 thru 006
|
| 05/07/2013 |
440079834 |
01 |
A3 |
X SIGNED OFF |
09/30/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 11/13/2012 |
420786028 |
01 |
A2 |
R PERMIT-ENTIRE |
02/03/2021 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
REMOVED PLASTER WALL TO BE LAMINATED WITH ONE LAYER GYP.BD. ON EXISTING ST
|
|
Work on Floor(s): 005
|
| 12/29/2011 |
420519139 |
01 |
A3 |
R PERMIT-ENTIRE |
12/29/2011 |
0033652 RA |
STILES |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/14/2020 FACADE REPAIR AS PER PLANS. NO CHANGE IN USE OCC
|
|
Work on Floor(s): OSP
|
| 12/13/2011 |
420513689 |
01 |
A2 |
X SIGNED OFF |
01/07/2013 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND BURNER. CONNECT TO EXISTING GAS LINE AND METER. NO CH
|
|
Work on Floor(s): CEL
|
| 11/10/2011 |
420503306 |
01 |
A3 |
X SIGNED OFF |
10/20/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
REPLACE PARAPET WALL APPROX. 140 L.F. ON 36 STREET AS PER PLAN. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 10/13/2011 |
420493111 |
01 |
A3 |
X SIGNED OFF |
08/26/2020 |
0028318 RA |
KAMBANIS |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 05/04/2010 |
420183161 |
01 |
A3 |
X SIGNED OFF |
12/28/2011 |
0052024 PE |
TAUBERER |
|
NOT APPLICABLE
|
|
INSTALLATION OF 220 LINEAR FT OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 09/28/1994 |
400493248 |
01 |
A2 |
R PERMIT-ENTIRE |
10/04/1994 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND REINSTALL EXISTING OIL/GAS BURNER
|
|
Work on Floor(s): CEL
|