| 11/05/2018 |
440520465 |
01 |
A2 |
X SIGNED OFF |
12/17/2019 |
0091829 PE |
GARCIA |
|
NOT APPLICABLE
|
|
FACADE REPAIRS PROJECT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRE
|
|
Work on Floor(s): FAC
|
| 09/17/2018 |
440506418 |
01 |
A2 |
P APPROVED |
09/17/2018 |
0091829 PE |
GARCIA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/25/2019 FACADE REPAIRS PROJECT AS PER PLANS FILED HEREWIT
|
|
Work on Floor(s): FAC
|
| 06/27/2013 |
420856773 |
01 |
A2 |
X SIGNED OFF |
01/25/2016 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE OIL BURNER WITH GAS BURNER ON NYC BOILER NO. MD5625-01 AND INSTALL
|
|
Work on Floor(s): CEL
|
| 06/15/2009 |
402466345 |
03 |
A2 |
P APPROVED |
06/15/2009 |
|
Hero |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005,006
|
| 11/16/2007 |
410031503 |
01 |
A2 |
R PERMIT-ENTIRE |
11/27/2007 |
0025906 RA |
Mucciolo |
Y |
NOT APPLICABLE
|
|
Installation of Sidewalk shed. Scope of work consists of replacement of br
|
|
Work on Floor(s): OSP
|
| 03/09/2007 |
402466345 |
02 |
A2 |
P APPROVED |
03/16/2007 |
0015376 RA |
Hero |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005,006
|
| 10/02/2006 |
402466345 |
01 |
A2 |
X SIGNED OFF |
10/20/2009 |
0015376 RA |
Hero |
|
NOT APPLICABLE
|
|
Repair plaster wall framings, test & repair gas line as required, replace
|
|
Work on Floor(s): 005,006
|
| 02/20/2004 |
401824843 |
01 |
A2 |
R PERMIT-ENTIRE |
06/10/2004 |
0076805 PE |
CHRYSLER |
|
NOT APPLICABLE
|
|
INSTALL NEW 3000 GALOON OIL TANK. BUILD 3 HOUR FIRE RATED TANK VAULT. NO
|
|
Work on Floor(s): CEL
|
| 05/17/1993 |
400378328 |
01 |
A2 |
X SIGNED OFF |
09/17/1993 |
0049248 PE |
LIANG |
|
NOT APPLICABLE
|
|
INSTALL REFUSE COMPACTOR IN EXISTING INC INERATOR ROOM IN CELLAR.
|
|
Work on Floor(s): CEL
|