 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/23/2023 |
420948425 |
02 |
A3 |
P APPROVED |
06/07/2023 |
|
SCHERER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 10/01/2018 |
421684332 |
01 |
A2 |
P APPROVED |
11/29/2018 |
0087018 PE |
CONNOLLY |
|
NOT APPLICABLE
|
|
INSTALLATION OF GAS BOOSTER PUMP AS PER PLANS. NO CHANGE TO OCCUPANCY, US
|
|
Work on Floor(s): ROF
|
| 04/10/2014 |
420948416 |
01 |
A2 |
R PERMIT-ENTIRE |
11/28/2016 |
0075376 PE |
SCHERER |
|
NOT APPLICABLE
|
|
INSTALLATION OF GAS FIRED GENERATOR ON ROOF. INSTALLATION OF RELATED GAS P
|
|
Work on Floor(s): BAS,001,ROF,OSP
|
| 03/13/2014 |
420948425 |
01 |
A3 |
X SIGNED OFF |
06/09/2023 |
0075376 PE |
SCHERER |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW EXTERIOR CABINETS ON STEEL PLATFORM ON ROOF. INSTALLAT
|
|
Work on Floor(s): ROF
|
| 07/14/1994 |
400474287 |
01 |
A2 |
X SIGNED OFF |
08/02/1994 |
0036071 PE |
WEINER |
|
NOT APPLICABLE
|
|
REPLACE BURNER.CHANGE GRADE OF OIL TO #2 INSTALL NEW GAS LINE TO DUAL
|
|
Work on Floor(s): CEL
|