| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/29/2023 |
421086390 |
02 |
A2 |
P APPROVED |
10/04/2023 |
|
MEDEROS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 01/28/2020 |
421187995 |
02 |
A2 |
P APPROVED |
02/05/2020 |
|
MEDEROS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 01/28/2020 |
421489543 |
02 |
A2 |
P APPROVED |
02/05/2020 |
|
MEDEROS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,002
|
| 07/03/2017 |
421489543 |
01 |
A2 |
R PERMIT-ENTIRE |
09/15/2022 |
0034595 RA |
MEDEROS |
|
NOT APPLICABLE
|
|
WE RESPECTFULLY WISH TO RENOVATE AND COMBINE APARTMENTS A-12 & B 12 ON THE
|
|
Work on Floor(s): 001,002
|
| 04/18/2016 |
440304680 |
01 |
A2 |
Q PERMIT-PARTIAL |
04/21/2016 |
0054060 PE |
CAGAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AS PER PLANS FILED
|
|
Work on Floor(s): 005
|
| 11/04/2015 |
421188342 |
01 |
A2 |
Q PERMIT-PARTIAL |
11/04/2015 |
0034595 RA |
MEDEROS |
|
NOT APPLICABLE
|
|
WE RESPECTFULLY WISH TO RENOVATED APARTMENT D5 ON THE 4TH FLOOR AS PER PLA
|
|
Work on Floor(s): 004
|
| 10/26/2015 |
421187995 |
01 |
A2 |
R PERMIT-ENTIRE |
02/07/2020 |
0034595 RA |
MEDEROS |
|
NOT APPLICABLE
|
|
WE RESPECTFULLY WISH TO RENOVATE APARTMENT C6 ON THE THIRD FLOOR AS PER
|
|
Work on Floor(s): 003
|
| 09/11/2015 |
421213779 |
01 |
A2 |
Q PERMIT-PARTIAL |
09/15/2015 |
0034595 RA |
MEDEROS |
|
NOT APPLICABLE
|
|
WE RESPECTFULLY WISH TO RENOVATE APARTMENT B7 AS PER PLANS.NEW PARTITION
|
|
Work on Floor(s): 002
|
| 04/17/2015 |
421086390 |
01 |
A2 |
X SIGNED OFF |
10/05/2023 |
0034595 RA |
MEDEROS |
|
NOT APPLICABLE
|
|
WE RESPECTFULLY WISH TO RENOVATE APARTMENT E 8 ON THE FIFTH FLOOR AS PER P
|
|
Work on Floor(s): 005
|
| 08/05/2014 |
421014262 |
01 |
A2 |
X SIGNED OFF |
10/08/2024 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
RENOVATION OF APT.F5 ON THE 6TH FLOOR AND APT.D10 ON THE 4TH FLOOR. PLUMBI
|
|
Work on Floor(s): 004,006
|
| 06/28/2013 |
420863925 |
01 |
A2 |
X SIGNED OFF |
04/19/2022 |
0086946 PE |
DONLY |
|
NOT APPLICABLE
|
|
WE RESPECTFULLY WISH TO FILE RETAINING WALL ON THE FIRST FLOOR AS PER PLAN
|
|
Work on Floor(s): 001
|
| 06/10/2013 |
420856041 |
01 |
A2 |
X SIGNED OFF |
04/10/2017 |
0034595 RA |
MEDEROS |
|
NOT APPLICABLE
|
|
WE RESPECTFULLY WISH TO RENOVATE APT F11 AS PER PLANS. NEW PARTITION WORK
|
| 06/10/2013 |
420856032 |
01 |
A2 |
X SIGNED OFF |
04/04/2017 |
0034595 RA |
MEDEROS |
|
NOT APPLICABLE
|
|
WE REPECTFULLY WISH TO RENOVATE APT D9 AS PER PLANS.NEW PARTITION WORK. A
|
| 09/05/2012 |
420620082 |
01 |
A2 |
X SIGNED OFF |
01/26/2017 |
0034595 RA |
MEDEROS |
|
NOT APPLICABLE
|
|
WE RESPECTFULLY WISH TO RENOVATE APARTMENT C11 ON THE THIRD FLOOR AS PER P
|
|
Work on Floor(s): 003
|
| 07/09/2012 |
420253674 |
02 |
A2 |
P APPROVED |
08/31/2012 |
|
KAYE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003,004,005,006
|
| 09/20/2011 |
420484318 |
01 |
A3 |
X SIGNED OFF |
05/03/2012 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF 210 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDIN
|
|
Work on Floor(s): OSP
|
| 06/24/2011 |
420371564 |
01 |
A3 |
P APPROVED |
08/02/2011 |
0014318 RA |
WEISS |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIR
|
|
Work on Floor(s): 001,006
|
| 05/24/2011 |
420359720 |
01 |
A2 |
R PERMIT-ENTIRE |
10/26/2011 |
0014318 RA |
WEISS |
|
NOT APPLICABLE
|
|
REFURBISHING OF FACADE: REPLACE DAMAGED STONE SILL; ON PARAPET, REPLACE
|
|
Work on Floor(s): 001 thru 006
|
| 10/18/2010 |
420276686 |
01 |
A2 |
R PERMIT-ENTIRE |
02/14/2011 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD4198-01) WITH BOILER AND G
|
|
Work on Floor(s): CEL
|
| 09/17/2010 |
420253674 |
01 |
A2 |
R PERMIT-ENTIRE |
07/20/2012 |
0021910 RA |
KAYE |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF KITCHENS AND BATHROOMS. NO CHANGE OF USE, EGRESS OR
|
|
Work on Floor(s): 002,003,004,005,006
|
| 03/20/2009 |
410237961 |
01 |
A2 |
R PERMIT-ENTIRE |
04/07/2009 |
0029258 RA |
GRAZIOSI |
|
NOT APPLICABLE
|
|
LEGALIZATION OF GENERAL CONSTRUCTION AND PLUMBING WORK AS PER PLANS FILED
|
|
Work on Floor(s): 004
|
| 12/07/2007 |
410044571 |
01 |
A3 |
X SIGNED OFF |
02/01/2021 |
0079601 PE |
MC ERLEA |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY
|
|
Work on Floor(s): OSP
|
| 11/07/2007 |
410027117 |
01 |
A2 |
X SIGNED OFF |
12/29/2008 |
0020904 RA |
Lane |
|
NOT APPLICABLE
|
|
Filing herewith for facade restoration. No change in use, egress or occupa
|
|
Work on Floor(s): 002,003,004,005,006 001 thru 006
|
| 09/19/2007 |
410004980 |
01 |
A3 |
X SIGNED OFF |
01/28/2021 |
OT |
DEL MAST |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 155 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 10/10/1991 |
400219143 |
01 |
A2 |
X SIGNED OFF |
02/20/1992 |
0007310 RA |
WESTPHAL |
|
NOT APPLICABLE
|
|
INSTALL TWO REFUSE COMPACTORS IN EXISTING INCINERATOR ROOMS .NO
|
|
Work on Floor(s): 1ST
|