| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/14/2020 |
440618039 |
01 |
A2 |
X SIGNED OFF |
08/11/2021 |
0095364 PE |
ROMAN |
|
NOT APPLICABLE
|
|
FACADE RESTORATION AND REPAIR AS PER PLAN.
|
|
Work on Floor(s): FAC
|
| 01/29/2020 |
440159276 |
02 |
A3 |
P APPROVED |
02/05/2020 |
0071962 PE |
ABDALLA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 006
|
| 12/17/2019 |
440097976 |
02 |
A2 |
P APPROVED |
12/20/2019 |
0071962 PE |
ABDALLA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 12/17/2019 |
440100221 |
02 |
A3 |
P APPROVED |
12/20/2019 |
0071962 PE |
ABDALLA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 10/11/2017 |
440441452 |
01 |
A3 |
X SIGNED OFF |
10/09/2019 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
REPAIRE CRACKS BRICKS REPLACEMENT AS SHOWN IN PLANS AS PER PLAN. NO CHANG
|
|
Work on Floor(s): 001,002
|
| 10/11/2017 |
440441434 |
01 |
A3 |
H P/E IN PROCESS |
10/11/2017 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/11/2017 REPAIRE CRACKS BRICKS REPLACEMENT AS SHOWN IN PL
|
|
Work on Floor(s): 001,002
|
| 03/17/2016 |
421020451 |
02 |
A2 |
P APPROVED |
05/05/2016 |
|
PERUMALA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 006
|
| 08/20/2014 |
421020451 |
01 |
A2 |
X SIGNED OFF |
08/17/2016 |
0073225 PE |
PERUMALA |
|
NOT APPLICABLE
|
|
REPAIR ALL BALCONIES, PEMOVE AND REPLACE EXISTING RAILINGS ON BALCONIES ON
|
|
Work on Floor(s): ROF 001 thru 006
|
| 07/30/2014 |
440159276 |
01 |
A3 |
X SIGNED OFF |
02/11/2020 |
0071962 PE |
ABDALLA |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD 65'HIGH ORIGINATING OFF SHED, AS P
|
|
Work on Floor(s): ROF 001 thru 006
|
| 08/25/2013 |
440097976 |
01 |
A2 |
X SIGNED OFF |
01/02/2020 |
0071962 PE |
ABDALLA |
|
NOT APPLICABLE
|
|
EXTERIOR FACADE RESTORATION WORK. NO CHANGE IN USE EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): 001 thru 006
|
| 08/14/2013 |
440100221 |
01 |
A3 |
X SIGNED OFF |
01/02/2020 |
0071962 PE |
ABDALLA |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY LIGHT DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 05/08/2001 |
401237942 |
01 |
A3 |
R PERMIT-ENTIRE |
05/17/2001 |
0065430 PE |
Hickey |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 100' DURING FACADE REPAIR.
|
|
Work on Floor(s): 001
|
| 05/08/2001 |
401237933 |
01 |
A3 |
R PERMIT-ENTIRE |
05/14/2001 |
0065430 PE |
Hickey |
|
NOT APPLICABLE
|
|
INSTALLATION OFA HEAVY DUTY SCAFFOLD 80' LONG X 40' HIGH DURING FACADE REP
|
|
Work on Floor(s): 001
|
| 07/23/1996 |
400655439 |
01 |
A2 |
R PERMIT-ENTIRE |
08/19/1996 |
0047135 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
INSTALL NEW 3000 GL FUEL OIL TK WITH 4" CONCRETE BL WRAP.LEGALLY ABANDON
|
|
Work on Floor(s): CEL
|