 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/19/2014 |
440163662 |
01 |
A3 |
R PERMIT-ENTIRE |
08/20/2014 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 04/24/2014 |
420956022 |
01 |
DM |
X SIGNED OFF |
12/30/2014 |
0052024 PE |
TAUBERER |
|
NOT APPLICABLE
|
|
FULL DEMOLITION OF ONE STORY STRUCTURE, USING MECHANICAL MEANS.
|
|
Work on Floor(s): 001
|
| 06/13/2008 |
402681558 |
01 |
DM |
E AP-NPE |
06/13/2008 |
0015817 RA |
CHAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/29/2015 DEMOLICATION
|
|
Work on Floor(s): CEL,1
|
| 08/17/1993 |
400397094 |
01 |
A2 |
X SIGNED OFF |
09/29/1993 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
LEGALIZE EXISTING BOILER & OIL BURNER IS TALLED PRIOR TO JANUARY 1, 1989
|
|
Work on Floor(s): CEL
|