 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/02/2025 |
440824510 |
01 |
A3 |
R PERMIT-ENTIRE |
09/18/2025 |
0026633 RA |
KATZ |
|
NOT APPLICABLE
|
|
BPP APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION #Q01242193-I1. TO
|
|
Work on Floor(s): OSP
|
| 04/25/2017 |
440400406 |
01 |
A3 |
R PERMIT-ENTIRE |
04/27/2017 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF.
|
|
Work on Floor(s): OSP
|
| 11/13/2015 |
421236932 |
03 |
NB |
J P/E DISAPPROVED |
04/20/2016 |
0085125 PE |
RUDITSER |
|
PENDING
|
|
PROPOSED: MECHANICAL & PLUMBING WORK FOR NEW BUILDING AS SHOWN ON DRAWING
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 11/13/2015 |
421236932 |
02 |
NB |
J P/E DISAPPROVED |
04/20/2016 |
0063244 PE |
GIBBLE |
|
PENDING
|
|
PROPOSED: STRUCTURAL WORK FOR THE NEW BUILDING AS SHOWN ON DRAWINGS FILED
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 11/13/2015 |
421236932 |
01 |
NB |
J P/E DISAPPROVED |
04/20/2016 |
0028361 RA |
RIPEL |
|
PENDING
|
|
FILING 5 STORY NEW BUILDING AS PER PLANS FILED HEREWITH.
|
|
Work on Floor(s): CEL,RF 001 thru 005
|
| 04/14/2014 |
420960455 |
01 |
DM |
R PERMIT-ENTIRE |
11/05/2018 |
0079067 PE |
SEMIOLI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/10/2025 BUILDING DEMOLITION. MECHANICAL DEMOLITION PLANS
|