 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/19/2019 |
440574656 |
01 |
A2 |
X SIGNED OFF |
05/12/2020 |
0018485 RA |
ZIRINSKY |
|
NOT APPLICABLE
|
|
REPOINTING THE BRICK AT THE SECOND BAY FROM THE CORNER OF 41 AVENUE AND 28
|
|
Work on Floor(s): OSP
|
| 11/05/2019 |
440573265 |
01 |
A2 |
D A/P ENTIRE |
11/05/2019 |
0018485 RA |
ZIRINSKY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/19/2019 REPOINT BRICK WORK AT FIRST AND SECOND FLOORS ON
|
|
Work on Floor(s): OSP
|
| 10/23/2019 |
440571329 |
01 |
A2 |
H P/E IN PROCESS |
10/23/2019 |
0018485 RA |
ZIRINSKY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/19/2019 REPOINT AN AREA OF 200 SF OF BRICK AT PART OF FIR
|
|
Work on Floor(s): OSP
|
| 10/15/2019 |
440570160 |
01 |
A2 |
H P/E IN PROCESS |
10/15/2019 |
0018485 RA |
ZIRINSKY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/19/2019 FACADE REPOINTING ON 28TH STREET
|
|
Work on Floor(s): 001 thru 002
|
| 02/17/2014 |
440128862 |
01 |
A3 |
X SIGNED OFF |
03/20/2026 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD ON SHED FOR REMEDIAL REPAIRS AS PER
|
|
Work on Floor(s): OSP
|
| 02/03/2014 |
420890566 |
02 |
A2 |
P APPROVED |
02/24/2014 |
|
ZIRINSKY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 10/28/2013 |
440112352 |
01 |
A3 |
X SIGNED OFF |
03/11/2026 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 09/04/2013 |
420890566 |
01 |
A2 |
X SIGNED OFF |
06/23/2014 |
0018485 RA |
ZIRINSKY |
|
NOT APPLICABLE
|
|
REPOINT AN AREA OF APPROXIMATE 225 SQ. FEET ON THE 41ST AVENUE FA?ADE OF T
|
|
Work on Floor(s): 002
|
| 08/31/2010 |
420245782 |
01 |
A2 |
X SIGNED OFF |
10/07/2010 |
0078495 PE |
MAK |
|
NOT APPLICABLE
|
|
REPOINT CRACKED WALL AND REPAIR THE LINTEL. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): 1ST
|