| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/27/2020 |
440606667 |
02 |
A2 |
P APPROVED |
08/28/2020 |
|
ADDESSO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC 001 thru 010
|
| 07/15/2020 |
440606667 |
01 |
A2 |
X SIGNED OFF |
04/08/2021 |
0028869 RA |
ADDESSO |
|
NOT APPLICABLE
|
|
EXTERIOR RESTORATION TO INCLUDE CUTTING, POINTING AND BRICK REPLACEMENT AS
|
|
Work on Floor(s): FAC 001 thru 010
|
| 02/01/2019 |
421224259 |
03 |
A1 |
P APPROVED |
02/01/2019 |
|
COSTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 10/03/2017 |
440379975 |
02 |
A2 |
P APPROVED |
10/05/2017 |
|
COSTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/28/2017 |
420507071 |
02 |
A3 |
P APPROVED |
11/13/2017 |
0016907 RA |
COSTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 010
|
| 09/28/2017 |
420507062 |
02 |
A3 |
P APPROVED |
11/17/2017 |
0016907 RA |
COSTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 010
|
| 09/05/2017 |
421224259 |
02 |
A1 |
P APPROVED |
11/30/2017 |
0016907 RA |
COSTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 01/27/2017 |
440379975 |
01 |
A2 |
X SIGNED OFF |
12/19/2017 |
0016907 RA |
COSTA |
|
NOT APPLICABLE
|
|
HEREWITH FILING APPLICATIONS FOR COURTYARD LANDSCAPING IN THE REAR OF BUIL
|
|
Work on Floor(s): OSP
|
| 05/17/2016 |
421224259 |
01 |
A1 |
X SIGNED OFF |
02/13/2019 |
0016907 RA |
COSTA |
|
NOT APPLICABLE
|
|
HERE WITH FILING ALT 1 NO-WORK APPLICATION TO AMEND CURRENT CERTIFICATE
|
|
Work on Floor(s): CEL
|
| 07/09/2012 |
420591354 |
01 |
A3 |
X SIGNED OFF |
01/28/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHAN
|
|
Work on Floor(s): OSP
|
| 04/11/2012 |
420507062 |
01 |
A3 |
X SIGNED OFF |
12/08/2017 |
0016907 RA |
COSTA |
|
NOT APPLICABLE
|
|
PROPOSE TO ERECT A HANGING METAL MARQUEE
|
|
Work on Floor(s): CEL,ROF 001 thru 010
|
| 02/17/2012 |
420535200 |
01 |
A2 |
X SIGNED OFF |
03/21/2012 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
ADMINISTRATIVE FILING TO APPLY FOR FUEL BURNING AND FUEL STORAGE WORKTYPE
|
|
Work on Floor(s): CEL,ROF,PH 001 thru 010
|
| 01/17/2012 |
410147452 |
12 |
NB |
P APPROVED |
01/27/2012 |
|
ELIASON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,0RF,0PH 001 thru 010
|
| 01/13/2012 |
410159965 |
02 |
A3 |
P APPROVED |
02/03/2012 |
|
ELIASON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 APPLICATION FILED FOR NB APPLICATION 410147
|
|
Work on Floor(s): CEL,0RF,0PH 001 thru 010
|
| 11/21/2011 |
420507071 |
01 |
A3 |
X SIGNED OFF |
12/08/2017 |
0016907 RA |
COSTA |
|
NOT APPLICABLE
|
|
THIS FILING MADE TO IDENTIFY THE ENGINEER RESPONSIBLE FOR STRUCTURAL DESIG
|
|
Work on Floor(s): CEL,ROF 001 thru 010
|
| 09/06/2011 |
410147452 |
11 |
NB |
P APPROVED |
10/26/2011 |
|
ELIASON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,0RF,0PH 001 thru 010
|
| 07/26/2011 |
410147452 |
10 |
NB |
P APPROVED |
08/22/2011 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 010
|
| 07/06/2011 |
410147452 |
09 |
NB |
P APPROVED |
07/12/2011 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 010
|
| 07/01/2011 |
410147452 |
08 |
NB |
P APPROVED |
07/01/2011 |
|
ELIASON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,0RF,0PH 001 thru 010
|
| 10/28/2010 |
410147452 |
07 |
NB |
P APPROVED |
11/16/2010 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 010
|
| 10/27/2010 |
420279950 |
01 |
A2 |
P APPROVED |
11/03/2010 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/28/2012 HEREWITH FILING BOILER AND FUEL STORAGE APPLICATI
|
|
Work on Floor(s): ROF
|
| 10/21/2010 |
420277916 |
01 |
A2 |
X SIGNED OFF |
08/02/2011 |
0032382 RA |
ENSCHEDE |
|
NOT APPLICABLE
|
|
INSTALL SOLAR PANEL ARRAY SYSTEM ON THE ROOF. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): ROF
|
| 09/08/2010 |
420211942 |
02 |
A3 |
P APPROVED |
09/08/2010 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/28/2010 |
420080995 |
02 |
A2 |
P APPROVED |
09/28/2010 |
|
SIDERIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 010
|
| 07/07/2010 |
420211942 |
01 |
A3 |
X SIGNED OFF |
06/22/2011 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF NETTING AS PER DRAWINGS. NETTING SHALL COMPLY WITH CHAPTER
|
|
Work on Floor(s): OSP
|
| 06/03/2010 |
420196326 |
01 |
A3 |
X SIGNED OFF |
03/30/2011 |
0079601 PE |
MCERLEAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF A PERSONNEL/MATERIAL SINGLE CAR HOIST PECCO H5000-10 DURIN
|
|
Work on Floor(s): OSP
|
| 05/28/2010 |
420194854 |
01 |
A3 |
X SIGNED OFF |
03/07/2011 |
0032813 PE |
PARMET |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW HEAVY DUTY PIPE SCAFFOLD AROUND BUILDING AT 41-18 CRE
|
|
Work on Floor(s): OSP
|
| 04/15/2010 |
420175081 |
01 |
A3 |
X SIGNED OFF |
06/22/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF 140 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR NEW BLDG
|
|
Work on Floor(s): OSP
|
| 04/07/2010 |
410147452 |
06 |
NB |
P APPROVED |
04/28/2010 |
0060272 PE |
DENARDIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,0RF,0PH 001 thru 010
|
| 01/26/2010 |
410147452 |
05 |
NB |
P APPROVED |
01/26/2010 |
|
ELIASON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,0RF,0PH 001 thru 010
|
| 11/04/2009 |
410147452 |
04 |
NB |
X SIGNED OFF |
03/30/2012 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
SUBSEQUENT APPLICANT FOR BOILER (BL) WORK TYPE
|
|
Work on Floor(s): CEL,0RF,0PH 001 thru 010
|
| 10/08/2009 |
420093259 |
01 |
A2 |
X SIGNED OFF |
07/25/2011 |
0066710 PE |
KEFALAS |
|
NOT APPLICABLE
|
|
PROPOSE TO FILE AUTOMATIC AND SPRINKLER ALARM SYSTEM WITH CENTRAL OFFICE C
|
|
Work on Floor(s): CEL,EMR,ROF 001 thru 010
|
| 09/22/2009 |
420080995 |
01 |
A2 |
X SIGNED OFF |
12/02/2011 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM THROUGHOUT BUILDING. FIRE PUMP
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 010
|
| 04/14/2009 |
420005817 |
01 |
A2 |
X SIGNED OFF |
05/16/2012 |
0077015 PE |
BRONZINO |
|
NOT APPLICABLE
|
|
HEREWITH FILING PLANS TO INSTALL A TEMPORARY CONSTRUCTION FENCE AS SHOWN O
|
|
Work on Floor(s): OSP
|
| 11/20/2008 |
410195710 |
01 |
A2 |
X SIGNED OFF |
08/17/2011 |
0077015 PE |
BRONZINO |
|
NOT APPLICABLE
|
|
HEREWITH FILING PLANS FOR TEMPORARY SUPPORT OF EXCAVATION IN CONJUCTION WI
|
|
Work on Floor(s): OSP
|
| 10/14/2008 |
410178971 |
01 |
A3 |
X SIGNED OFF |
08/05/2011 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED 77' LONG X 8' HIGH X 14' WIDE DUR
|
|
Work on Floor(s): 001
|
| 09/16/2008 |
410165137 |
01 |
DM |
X SIGNED OFF |
01/28/2009 |
OT |
BROWN |
|
NOT APPLICABLE
|
|
DEMOLITION OF TWO STORY BUILDING PROPERTY OTHER ADDRESSES ARE 41-15 THRU
|
|
Work on Floor(s): 001,002
|
| 09/02/2008 |
410159965 |
01 |
A3 |
X SIGNED OFF |
02/23/2012 |
0012657 RA |
ELIASON |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR NB APPLICATION 410147452, 41-18 CRESCENT STREET FOR
|
|
Work on Floor(s): CEL,0RF,0PH 001 thru 010
|
| 08/26/2008 |
410147452 |
03 |
NB |
X SIGNED OFF |
03/30/2012 |
0060272 PE |
DENARDIS |
|
NOT APPLICABLE
|
|
THIS SUBSEQUENT FILING IDENTIFY'S THE ENGINEER RESPONSIBLE FOR STRUCTURAL
|
|
Work on Floor(s): CEL,0RF,0PH 001 thru 010
|
| 08/26/2008 |
410147452 |
02 |
NB |
X SIGNED OFF |
03/30/2012 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
I AM A SUBSEQUENT APPLICANT TAKING RESPONSIBILITY FOR PLUMBING AND MECHANI
|
|
Work on Floor(s): CEL,ROF 001 thru 010
|