 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/20/2017 |
421469495 |
01 |
A2 |
X SIGNED OFF |
10/18/2022 |
0067343 PE |
AMADIO |
|
NOT APPLICABLE
|
|
NEW MANUAL AND AUTOMATIC SMOKE/CO DETECTION/ SPRINKLER ALARM SYSTEM AT 1ST
|
|
Work on Floor(s): CEL,001
|
| 04/13/2017 |
440398035 |
01 |
A3 |
X SIGNED OFF |
11/14/2017 |
0034068 RA |
JUDGE |
|
NOT APPLICABLE
|
|
REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS & DOORS AT 1ST FLOOR & CEL
|
|
Work on Floor(s): 001,CEL
|
| 04/13/2017 |
440397802 |
01 |
A2 |
X SIGNED OFF |
05/16/2022 |
0067343 PE |
AMADIO |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM ON 1ST FL
|
|
Work on Floor(s): CEL,001
|
| 04/07/2017 |
421468003 |
01 |
A1 |
X SIGNED OFF |
11/02/2023 |
0034068 RA |
JUDGE |
|
NOT APPLICABLE
|
|
RENO 1ST FL CHANGE USE FROM OCC GROUP M/USE GROUP 6 GALLERY/RETAIL TO OCC
|
|
Work on Floor(s): CEL,001
|
| 04/01/2015 |
440210497 |
01 |
A2 |
X SIGNED OFF |
07/01/2015 |
0035724 RA |
JACOBY |
|
NOT APPLICABLE
|
|
MINOR PARTITION IN 3RD FLOOR APARTMENT. NO CHANGE TO USE, OCCUPANCY OR EGR
|
|
Work on Floor(s): 003
|
| 05/15/2013 |
420205316 |
14 |
A1 |
P APPROVED |
05/16/2013 |
0081532 PE |
MAKARA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03 CONVERSION AND RENOVATION OF EXISTING CELLA
|
|
Work on Floor(s): CEL 1ST thru 3RD
|
| 01/04/2013 |
420789908 |
01 |
A2 |
X SIGNED OFF |
05/07/2013 |
0020571 RA |
PETERSON |
|
NOT APPLICABLE
|
|
THE LEGALIZATION OF AN EXISTING HOT WATER HEATER AND TWO BOILERS ON THE CE
|
|
Work on Floor(s): CEL
|
| 12/31/2012 |
420205316 |
12 |
A1 |
P APPROVED |
03/07/2013 |
0081532 PE |
MAKARA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL 1ST thru 3RD
|
| 07/18/2012 |
400929019 |
04 |
A2 |
P APPROVED |
08/14/2012 |
0020571 RA |
PETERSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003
|
| 02/08/2012 |
420205316 |
11 |
A1 |
P APPROVED |
03/12/2012 |
0081532 PE |
MAKARA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL 1ST thru 3RD
|
| 12/21/2011 |
420205316 |
10 |
A1 |
P APPROVED |
02/09/2012 |
0069355 PE |
GOLD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL 001 thru 003
|
| 12/02/2011 |
420205316 |
09 |
A1 |
P APPROVED |
01/11/2012 |
|
MCKEAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003
|
| 10/21/2011 |
420205316 |
08 |
A1 |
P APPROVED |
11/21/2011 |
|
MCKEAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003
|
| 09/07/2011 |
420205316 |
07 |
A1 |
P APPROVED |
09/30/2011 |
0081532 PE |
MAKARA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL 1ST thru 3RD
|
| 05/18/2011 |
420205316 |
06 |
A1 |
P APPROVED |
05/25/2011 |
|
MCKEAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003
|
| 03/08/2011 |
420205316 |
05 |
A1 |
X SIGNED OFF |
05/23/2013 |
0081532 PE |
MAKARA |
|
NOT APPLICABLE
|
|
SPRINKLER WORK IN CONJUNCTION WITH CONVERSION AND RENOVATION OF EXISTING C
|
|
Work on Floor(s): CEL 001 thru 003
|
| 12/15/2010 |
420205316 |
04 |
A1 |
X SIGNED OFF |
05/23/2013 |
0069355 PE |
GOLD |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK IN CONJUNTION WITH CONVERSION AND RENOVATION OF EXISTING C
|
|
Work on Floor(s): CEL 001 thru 003
|
| 11/03/2010 |
420205316 |
03 |
A1 |
X SIGNED OFF |
05/23/2013 |
0081532 PE |
MAKARA |
|
NOT APPLICABLE
|
|
CONVERSION AND RENOVATION OF EXISTING CELLAR AND 1ST FLOOR SPACE TO
|
|
Work on Floor(s): CEL 1ST thru 3RD
|
| 11/03/2010 |
420205316 |
02 |
A1 |
X SIGNED OFF |
05/23/2013 |
0081532 PE |
MAKARA |
|
NOT APPLICABLE
|
|
MECHANICAL WORK IN CONJUNCTION WITH THE CONVERSION AND RENOVATION OF THE
|
|
Work on Floor(s): CEL 001 thru 003
|
| 06/24/2010 |
420205316 |
01 |
A1 |
X SIGNED OFF |
05/23/2013 |
0027247 RA |
MCKEAN |
|
NOT APPLICABLE
|
|
CONVERSION AND RENOVATION OF EXISTING CELLAR AND 1ST FLOOR SPACE TO
|
|
Work on Floor(s): CEL,001,002,003
|
| 08/04/2005 |
402185452 |
01 |
A2 |
Q PERMIT-PARTIAL |
10/26/2005 |
0011069 RA |
PETIT |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/04/2013 REMOVE BATHTUB FROM CELLAR OFFICE POWDER ROOM
|
|
Work on Floor(s): CEL
|
| 05/31/2005 |
402145460 |
01 |
A3 |
X SIGNED OFF |
09/25/2012 |
0011089 RA |
PETTIT |
|
NOT APPLICABLE
|
|
REPAIR & REPLACE CORNICE, POINT BRICKWOR K, SEAL WINDOWS, & REPAIR BRICK
|
|
Work on Floor(s): NA
|
| 05/23/2005 |
402140241 |
01 |
A3 |
X SIGNED OFF |
11/15/2006 |
OT |
ZAHARIA |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 25 LINEAR FEET OF PIPE SCAFFOLD X 25 FEET HIGH FO
|
|
Work on Floor(s): OSP
|
| 05/23/2005 |
402140232 |
01 |
A3 |
X SIGNED OFF |
10/03/2006 |
OT |
ZAHARIA |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 25 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 09/07/1999 |
400929019 |
03 |
A2 |
P APPROVED |
09/07/1999 |
0011089 RA |
PETTIT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003
|
| 07/01/1999 |
400929019 |
02 |
A2 |
P APPROVED |
07/01/1999 |
0011089 RA |
PETTIT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REFURBISH TWO APARTMENTS AND RECONFIGURE L
|
|
Work on Floor(s): CEL,001,002,003
|
| 02/11/1999 |
400929019 |
01 |
A2 |
X SIGNED OFF |
01/22/2013 |
0020571 RA |
PETERSON |
|
NOT APPLICABLE
|
|
REFURBISH TWO APARTMENTS AND RECONFIGURE LAYOUTS OF BOTH APARTMENTS
|
|
Work on Floor(s): CEL,001,002,003
|
| 07/01/1997 |
400749008 |
02 |
A2 |
P APPROVED |
08/07/1997 |
0011089 RA |
PETTIT |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/09/2010 FILING HEREWITH ADDITIONAL WORK TYPE OTH ER (OT)
|
|
Work on Floor(s): CEL,1, 2, 3
|
| 06/04/1997 |
400749008 |
01 |
A2 |
P APPROVED |
08/07/1997 |
0011089 RA |
PETTIT |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/09/2010 REPLACE GFAS FIRED HOT WATER HEATER & GA S FIRED
|
|
Work on Floor(s): CEL,1, 2, 3
|
|
420205316 |
13 |
A1 |
A PRE-FILED |
05/10/2013 |
0081532 PE |
MAKARA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/13/2013 CONVERSION AND RENOVATION OF EXISTING CELLAR AND
|
|
Work on Floor(s): CEL 1ST thru 3RD
|