09/07/2023 |
421310290 |
02 |
A3 |
P APPROVED |
12/19/2024 |
0105810 PE |
HU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC,ROF
|
09/07/2023 |
421391924 |
02 |
A3 |
L P/E PAA $ PENDIN |
12/19/2024 |
0105810 PE |
HU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMOVE THE TEMPORARY PIPE SCAFFOLD AT EXIST
|
|
Work on Floor(s): OSP
|
10/27/2016 |
421391924 |
01 |
A3 |
R PERMIT-ENTIRE |
10/31/2016 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|
04/25/2016 |
421310290 |
01 |
A3 |
R PERMIT-ENTIRE |
04/25/2016 |
0105810 PE |
HU |
|
NOT APPLICABLE
|
|
RENOVATION OF FACADE WITH STTUCO FINISH AND NEW ROOF WORK FOR WATER PROOF.
|
|
Work on Floor(s): FAC,ROF
|