 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/19/2022 |
440495402 |
04 |
A2 |
P APPROVED |
05/31/2022 |
|
CHANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF,OSP 001 thru 004
|
| 02/08/2022 |
421611223 |
06 |
A1 |
P APPROVED |
02/16/2022 |
|
KANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 004
|
| 12/09/2021 |
440495402 |
03 |
A2 |
P APPROVED |
01/21/2022 |
|
CHANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF,OSP 001 thru 004
|
| 11/23/2021 |
421611223 |
05 |
A1 |
P APPROVED |
11/24/2021 |
|
KANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 004
|
| 07/27/2020 |
440215447 |
02 |
A3 |
P APPROVED |
07/30/2020 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 07/27/2019 |
421611223 |
04 |
A1 |
P APPROVED |
02/04/2022 |
0074354 PE |
WANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): ROF 001 thru 004
|
| 03/16/2019 |
421611223 |
03 |
A1 |
P APPROVED |
03/26/2019 |
|
KANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 004
|
| 10/21/2018 |
440495402 |
02 |
A2 |
P APPROVED |
11/14/2018 |
|
CHANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF,OSP 001 thru 004
|
| 07/17/2018 |
440495402 |
01 |
A2 |
X SIGNED OFF |
10/07/2022 |
0073791 PE |
CHANG |
|
NOT APPLICABLE
|
|
INSTALL PLUMBING, SPRINKLER AND MECHANICAL SYSTEM IN CONJUNCTION WITH A1
|
|
Work on Floor(s): ROF,OSP 001 thru 004
|
| 05/03/2018 |
421611223 |
02 |
A1 |
X SIGNED OFF |
03/21/2023 |
0074354 PE |
WANG |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK
|
|
Work on Floor(s): ROF 001 thru 004
|
| 03/15/2018 |
421611223 |
01 |
A1 |
X SIGNED OFF |
03/21/2023 |
0024849 RA |
KANG |
|
NOT APPLICABLE
|
|
CONVERT EXISTING 4-STORY WAREHOUSE TO MULTIPLE DWELLING LAW ARTICLE 7B BUI
|
|
Work on Floor(s): ROF 001 thru 004
|
| 01/30/2018 |
421598293 |
01 |
A3 |
X SIGNED OFF |
03/10/2022 |
0024849 RA |
KANG |
|
NOT APPLICABLE
|
|
REPLACE EXISTING WINDOWS AND REPOINT EXTERIOR BRICK WALL. REMOVE EXTERIOR
|
|
Work on Floor(s): OSP 001 thru 004
|
| 09/21/2015 |
421152264 |
03 |
A1 |
J P/E DISAPPROVED |
10/07/2015 |
0077896 PE |
TAN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 08/13/2018 MECHANICAL PORTION OF WORK FOR ART 7B CONVERSION
|
|
Work on Floor(s): ROO 001 thru 004
|
| 09/21/2015 |
421152264 |
02 |
A1 |
J P/E DISAPPROVED |
10/07/2015 |
0077896 PE |
TAN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 08/13/2018 PLUMBING WORK FOR THE CONVERSION OF EXISITING FOU
|
|
Work on Floor(s): ROO 001 thru 004
|
| 09/21/2015 |
421152264 |
01 |
A1 |
J P/E DISAPPROVED |
10/07/2015 |
0018485 RA |
ZIRINSKY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/13/2018 ARTICLE 7B CONVERSION OF EXISTING MANUFACTURING B
|
|
Work on Floor(s): 001,002,003,004,ROO
|
| 06/26/2015 |
421178219 |
01 |
A2 |
X SIGNED OFF |
12/16/2015 |
0059461 PE |
GALLI |
|
NOT APPLICABLE
|
|
BRACING OF BUILDING FROM FLOOR TO FLOOR WITH EXTERIOR C-CHANNEL.
|
|
Work on Floor(s): 001 thru 004
|
| 04/27/2015 |
440215447 |
01 |
A3 |
X SIGNED OFF |
08/04/2020 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BU
|
|
Work on Floor(s): OSP
|
| 03/06/2009 |
410232608 |
01 |
A3 |
P APPROVED |
04/01/2009 |
0070466 PE |
DRABKIN |
Y |
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/09/2022 STRUCTURAL DESIGN IN CONJUNCTION WITH ALT 1 #4020
|
|
Work on Floor(s): ROF 001 thru 005
|
| 02/21/2007 |
402538465 |
01 |
A2 |
X SIGNED OFF |
11/22/2022 |
0017642 RA |
LEE |
|
NOT APPLICABLE
|
|
DISCONNECT TANK & INSTALL CAP ON FEED LINE TO TANK
|
|
Work on Floor(s): 001 thru 006
|
| 04/07/2005 |
402062879 |
01 |
A1 |
P APPROVED |
04/06/2009 |
0030801 RA |
MANCUSO |
Y |
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/09/2022 ADD 2 STORIES AND CONVERT BUILDING TO RE SIDENTIA
|
|
Work on Floor(s): 001 thru 006
|