FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
11/18/2024 |
320912857 |
21 |
NB |
G PAA FEE DUE |
11/18/2024 |
|
BROWN |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
10/03/2024 |
320912857 |
20 |
NB |
P APPROVED |
10/07/2024 |
|
BROWN |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
12/08/2023 |
320912857 |
19 |
NB |
P APPROVED |
12/12/2023 |
|
BROWN |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
10/26/2023 |
320912857 |
18 |
NB |
P APPROVED |
10/26/2023 |
|
BROWN |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
10/12/2023 |
320912857 |
17 |
NB |
P APPROVED |
10/24/2023 |
|
BROWN |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
10/04/2023 |
320912857 |
16 |
NB |
P APPROVED |
10/10/2023 |
|
BROWN |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
02/01/2023 |
320912857 |
15 |
NB |
P APPROVED |
02/01/2023 |
|
BROWN |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
09/30/2022 |
320912857 |
14 |
NB |
P APPROVED |
10/03/2022 |
0085187 PE |
WONG |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
09/23/2022 |
340612901 |
03 |
A2 |
P APPROVED |
10/03/2022 |
|
WONG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
09/22/2022 |
320912857 |
13 |
NB |
P APPROVED |
09/26/2022 |
0085187 PE |
WONG |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
08/25/2022 |
340612901 |
02 |
A2 |
P APPROVED |
09/06/2022 |
|
WONG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
08/15/2022 |
320912857 |
12 |
NB |
P APPROVED |
08/19/2022 |
|
BROWN |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
08/05/2022 |
320912857 |
11 |
NB |
P APPROVED |
08/12/2022 |
0085187 PE |
WONG |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
12/10/2021 |
321600889 |
01 |
SC |
U COMPLETED |
12/22/2021 |
0035812 RA |
BROWN |
|
NOT APPLICABLE
|
|
SUBDIVIDE EXISTING TAX LOT INTO (73) CONDO TAX LOTS. NO CHANGE TO ZONING U
|
05/06/2021 |
340811599 |
01 |
A3 |
J P/E DISAPPROVED |
05/18/2021 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/16/2021 INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLAN
|
|
Work on Floor(s): 004 thru 006
|
04/02/2021 |
340803768 |
02 |
A3 |
P APPROVED |
04/07/2021 |
|
BAKHTARW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
02/19/2021 |
320912857 |
10 |
NB |
P APPROVED |
02/24/2021 |
0085187 PE |
WONG |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
01/27/2021 |
340803768 |
01 |
A3 |
X SIGNED OFF |
03/21/2022 |
0101129 PE |
BAKHTARW |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
01/27/2021 |
340803759 |
01 |
A3 |
H P/E IN PROCESS |
01/27/2021 |
0101129 PE |
BAKHTARW |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/27/2021 INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIS
|
|
Work on Floor(s): OSP
|
01/26/2021 |
340803660 |
01 |
A3 |
X SIGNED OFF |
01/12/2023 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN U
|
|
Work on Floor(s): OSP,ROF
|
01/25/2021 |
340803508 |
01 |
A2 |
X SIGNED OFF |
01/10/2023 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
INSTALLATION AND USE OF TEMPORARY MATERIAL PLATFORM AS PER PLANS FILED HER
|
|
Work on Floor(s): ROF 001 thru 006
|
06/02/2020 |
320912857 |
09 |
NB |
P APPROVED |
07/02/2020 |
0035812 RA |
BROWN |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
05/14/2020 |
320912857 |
08 |
NB |
P APPROVED |
06/25/2020 |
0101015 PE |
ABDELMOH |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 06
|
|
Work on Floor(s): OSP
|
01/22/2020 |
320912857 |
07 |
NB |
P APPROVED |
01/28/2020 |
|
SINGER |
|
GRANTED 02/07/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
10/09/2018 |
320912857 |
06 |
NB |
R PERMIT-ENTIRE |
01/30/2020 |
0101015 PE |
ABDELMOH |
|
GRANTED 02/07/2019
|
|
PROVIDE SUPPORT OF EXCAVATION (SOE) AS PER PLANS FILED.
|
|
Work on Floor(s): OSP
|
07/17/2018 |
340619343 |
01 |
A3 |
X SIGNED OFF |
07/18/2023 |
0064477 PE |
MCCOY |
|
NOT APPLICABLE
|
|
PROVIDE BUILDERS PAVEMENT PLAN (BPP) FOR TOTAL FRONTAGE 300 FT. AS PER PLA
|
|
Work on Floor(s): OSP
|
06/22/2018 |
321776011 |
01 |
A2 |
X SIGNED OFF |
03/14/2023 |
0085187 PE |
WONG |
|
NOT APPLICABLE
|
|
INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
06/19/2018 |
340612901 |
01 |
A2 |
X SIGNED OFF |
12/30/2022 |
0085187 PE |
WONG |
|
NOT APPLICABLE
|
|
INSTALL SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. NO CHANGE TO USE, E
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
06/15/2018 |
321775717 |
01 |
A2 |
R PERMIT-ENTIRE |
12/23/2019 |
0048329 PE |
PATEL |
|
NOT APPLICABLE
|
|
SOIL REMEDIATION AND SUPPORTING OF EXCAVATION AT EXISTING SITE AS PER PLAN
|
|
Work on Floor(s): OSP
|
06/07/2018 |
320912857 |
05 |
NB |
J P/E DISAPPROVED |
06/14/2018 |
0048329 PE |
PATEL |
|
GRANTED 02/07/2019
|
|
DOC WITHDRAWN 08/22/2018 PROVIDE SUPPORT OF EXCAVATION (SOE) AS PER PLANS
|
|
Work on Floor(s): OSP
|
06/06/2018 |
320912857 |
04 |
NB |
R PERMIT-ENTIRE |
01/30/2020 |
0092770 PE |
SEIJAS |
|
GRANTED 02/07/2019
|
|
INSTALL FOUNDATION AS PER PLANS FILED.
|
|
Work on Floor(s): OSP
|
06/06/2018 |
320912857 |
03 |
NB |
R PERMIT-ENTIRE |
05/26/2020 |
0085187 PE |
WONG |
|
GRANTED 02/07/2019
|
|
PLUMBING AND MECHANICAL WORK AS PER PLANS FILED.
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
06/06/2018 |
320912857 |
02 |
NB |
R PERMIT-ENTIRE |
01/30/2020 |
0092770 PE |
SEIJAS |
|
GRANTED 02/07/2019
|
|
STRUCTURAL WORK AS PER PLANS FILED.
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
06/01/2018 |
320912857 |
01 |
NB |
R PERMIT-ENTIRE |
01/03/2023 |
0035812 RA |
BROWN |
|
GRANTED 02/07/2019
|
|
CONSTRUCT NEW SIX (6) STORY MIXED-USE BUILDING AS PER PLANS FILED.
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 006
|
07/08/2009 |
320045205 |
01 |
A2 |
R PERMIT-ENTIRE |
07/08/2009 |
0026548 RA |
TORRES |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/03/2012 CONTROL FILL TO LEVEL SITE GRADE LEVEL, IN CONJUN
|
|
Work on Floor(s): OSP
|
12/02/2007 |
302171860 |
06 |
NB |
P APPROVED |
12/20/2007 |
0650351 PE |
ENG |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/23/2011
|
|
Work on Floor(s): CEL 001 thru 006
|
03/19/2007 |
302171860 |
04 |
NB |
D A/P ENTIRE |
03/28/2007 |
0009723 RA |
JACOBS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/23/2011
|
|
Work on Floor(s): CEL 001 thru 006
|
03/19/2007 |
302171860 |
05 |
NB |
P APPROVED |
12/20/2007 |
0063244 PE |
GIBBLE |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/23/2011
|
|
Work on Floor(s): CEL 001 thru 006
|
12/13/2006 |
302273956 |
01 |
A3 |
J P/E DISAPPROVED |
12/20/2006 |
0009733 RA |
JACOBS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/22/2011 WE ARE FILIG A FIRE PROTECTION PLANFOR A SIX STOR
|
|
Work on Floor(s): CEL 001 thru 006
|
07/19/2006 |
302171860 |
03 |
NB |
Q PERMIT-PARTIAL |
10/10/2006 |
0650351 PE |
ENG |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/23/2011 WE ARE FILING PLUMBING SPRINKLER BOILERSTANDPIPE
|
|
Work on Floor(s): CEL 001 thru 006
|