Premises: 185 NORTH 8 STREET BROOKLYN BIN: 3426626    Block: 2312    Lot: 7501

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
11/18/2024 320912857 21 NB G PAA FEE DUE 11/18/2024 BROWN GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

10/03/2024 320912857 20 NB P APPROVED 10/07/2024 BROWN GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

12/08/2023 320912857 19 NB P APPROVED 12/12/2023 BROWN GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

10/26/2023 320912857 18 NB P APPROVED 10/26/2023 BROWN GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

10/12/2023 320912857 17 NB P APPROVED 10/24/2023 BROWN GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

10/04/2023 320912857 16 NB P APPROVED 10/10/2023 BROWN GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

02/01/2023 320912857 15 NB P APPROVED 02/01/2023 BROWN GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

09/30/2022 320912857 14 NB P APPROVED 10/03/2022 0085187 PE WONG GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

09/23/2022 340612901 03 A2 P APPROVED 10/03/2022 WONG NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

09/22/2022 320912857 13 NB P APPROVED 09/26/2022 0085187 PE WONG GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

08/25/2022 340612901 02 A2 P APPROVED 09/06/2022 WONG NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

08/15/2022 320912857 12 NB P APPROVED 08/19/2022 BROWN GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

08/05/2022 320912857 11 NB P APPROVED 08/12/2022 0085187 PE WONG GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

12/10/2021 321600889 01 SC U COMPLETED 12/22/2021 0035812 RA BROWN NOT APPLICABLE
 SUBDIVIDE EXISTING TAX LOT INTO (73) CONDO TAX LOTS. NO CHANGE TO ZONING U
05/06/2021 340811599 01 A3 J P/E DISAPPROVED 05/18/2021 0086757 PE PERDEK NOT APPLICABLE
 JOB WITHDRAWN 08/16/2021 INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLAN
 Work on Floor(s): 004 thru 006

04/02/2021 340803768 02 A3 P APPROVED 04/07/2021 BAKHTARW NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

02/19/2021 320912857 10 NB P APPROVED 02/24/2021 0085187 PE WONG GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

01/27/2021 340803768 01 A3 X SIGNED OFF 03/21/2022 0101129 PE BAKHTARW NOT APPLICABLE
 INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE
 Work on Floor(s): OSP

01/27/2021 340803759 01 A3 H P/E IN PROCESS 01/27/2021 0101129 PE BAKHTARW NOT APPLICABLE
 JOB WITHDRAWN 01/27/2021 INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIS
 Work on Floor(s): OSP

01/26/2021 340803660 01 A3 X SIGNED OFF 01/12/2023 0086757 PE PERDEK NOT APPLICABLE
 INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN U
 Work on Floor(s): OSP,ROF

01/25/2021 340803508 01 A2 X SIGNED OFF 01/10/2023 0090287 PE LOMBARDO NOT APPLICABLE
 INSTALLATION AND USE OF TEMPORARY MATERIAL PLATFORM AS PER PLANS FILED HER
 Work on Floor(s): ROF 001 thru 006

06/02/2020 320912857 09 NB P APPROVED 07/02/2020 0035812 RA BROWN GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

05/14/2020 320912857 08 NB P APPROVED 06/25/2020 0101015 PE ABDELMOH GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 06
 Work on Floor(s): OSP

01/22/2020 320912857 07 NB P APPROVED 01/28/2020 SINGER GRANTED 02/07/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

10/09/2018 320912857 06 NB R PERMIT-ENTIRE 01/30/2020 0101015 PE ABDELMOH GRANTED 02/07/2019
 PROVIDE SUPPORT OF EXCAVATION (SOE) AS PER PLANS FILED.
 Work on Floor(s): OSP

07/17/2018 340619343 01 A3 X SIGNED OFF 07/18/2023 0064477 PE MCCOY NOT APPLICABLE
 PROVIDE BUILDERS PAVEMENT PLAN (BPP) FOR TOTAL FRONTAGE 300 FT. AS PER PLA
 Work on Floor(s): OSP

06/22/2018 321776011 01 A2 X SIGNED OFF 03/14/2023 0085187 PE WONG NOT APPLICABLE
 INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

06/19/2018 340612901 01 A2 X SIGNED OFF 12/30/2022 0085187 PE WONG NOT APPLICABLE
 INSTALL SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. NO CHANGE TO USE, E
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

06/15/2018 321775717 01 A2 R PERMIT-ENTIRE 12/23/2019 0048329 PE PATEL NOT APPLICABLE
 SOIL REMEDIATION AND SUPPORTING OF EXCAVATION AT EXISTING SITE AS PER PLAN
 Work on Floor(s): OSP

06/07/2018 320912857 05 NB J P/E DISAPPROVED 06/14/2018 0048329 PE PATEL GRANTED 02/07/2019
 DOC WITHDRAWN 08/22/2018 PROVIDE SUPPORT OF EXCAVATION (SOE) AS PER PLANS
 Work on Floor(s): OSP

06/06/2018 320912857 04 NB R PERMIT-ENTIRE 01/30/2020 0092770 PE SEIJAS GRANTED 02/07/2019
 INSTALL FOUNDATION AS PER PLANS FILED.
 Work on Floor(s): OSP

06/06/2018 320912857 03 NB R PERMIT-ENTIRE 05/26/2020 0085187 PE WONG GRANTED 02/07/2019
 PLUMBING AND MECHANICAL WORK AS PER PLANS FILED.
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

06/06/2018 320912857 02 NB R PERMIT-ENTIRE 01/30/2020 0092770 PE SEIJAS GRANTED 02/07/2019
 STRUCTURAL WORK AS PER PLANS FILED.
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

06/01/2018 320912857 01 NB R PERMIT-ENTIRE 01/03/2023 0035812 RA BROWN GRANTED 02/07/2019
 CONSTRUCT NEW SIX (6) STORY MIXED-USE BUILDING AS PER PLANS FILED.
 Work on Floor(s): CEL,ROF,SUB 001 thru 006

07/08/2009 320045205 01 A2 R PERMIT-ENTIRE 07/08/2009 0026548 RA TORRES NOT APPLICABLE
 JOB WITHDRAWN 12/03/2012 CONTROL FILL TO LEVEL SITE GRADE LEVEL, IN CONJUN
 Work on Floor(s): OSP

12/02/2007 302171860 06 NB P APPROVED 12/20/2007 0650351 PE ENG NOT APPLICABLE
 DOC WITHDRAWN 03/23/2011
 Work on Floor(s): CEL 001 thru 006

03/19/2007 302171860 04 NB D A/P ENTIRE 03/28/2007 0009723 RA JACOBS NOT APPLICABLE
 DOC WITHDRAWN 03/23/2011
 Work on Floor(s): CEL 001 thru 006

03/19/2007 302171860 05 NB P APPROVED 12/20/2007 0063244 PE GIBBLE NOT APPLICABLE
 DOC WITHDRAWN 03/23/2011
 Work on Floor(s): CEL 001 thru 006

12/13/2006 302273956 01 A3 J P/E DISAPPROVED 12/20/2006 0009733 RA JACOBS NOT APPLICABLE
 JOB WITHDRAWN 03/22/2011 WE ARE FILIG A FIRE PROTECTION PLANFOR A SIX STOR
 Work on Floor(s): CEL 001 thru 006

07/19/2006 302171860 03 NB Q PERMIT-PARTIAL 10/10/2006 0650351 PE ENG NOT APPLICABLE
 DOC WITHDRAWN 03/23/2011 WE ARE FILING PLUMBING SPRINKLER BOILERSTANDPIPE
 Work on Floor(s): CEL 001 thru 006