| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/02/2020 |
321825646 |
04 |
A2 |
P APPROVED |
10/05/2020 |
|
MULIAWAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): RF 001 thru 009
|
| 09/01/2020 |
320910289 |
07 |
NB |
P APPROVED |
10/02/2020 |
0066144 PE |
MULIAWAN |
|
GRANTED 05/17/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 001 thru 005 006 thru 009
|
| 03/18/2020 |
321825646 |
03 |
A2 |
P APPROVED |
06/03/2020 |
|
MULIAWAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): RF 001 thru 009
|
| 01/31/2020 |
322038567 |
01 |
A3 |
X SIGNED OFF |
11/25/2020 |
0079385 PE |
ALGENDE |
|
NOT APPLICABLE
|
|
OPP- OCCUPANT PROTECTION PLAN FILE IN CONJUNCTION WITH APPLICATION #320910
|
|
Work on Floor(s): 001 thru 009
|
| 12/04/2019 |
321940263 |
03 |
A2 |
P APPROVED |
12/11/2019 |
|
CARAVELL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,UDG
|
| 10/23/2019 |
340702163 |
01 |
A3 |
X SIGNED OFF |
09/04/2020 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRES
|
|
Work on Floor(s): OSP
|
| 10/01/2019 |
340699300 |
01 |
A3 |
X SIGNED OFF |
04/10/2020 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF MONORAIL WITH HANGING PLATFORM AS PER PLANS. NO CHANGE IN
|
|
Work on Floor(s): OSP,ROF
|
| 09/23/2019 |
321825646 |
02 |
A2 |
P APPROVED |
10/01/2019 |
|
MULIAWAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): RF 001 thru 009
|
| 08/02/2019 |
320910289 |
06 |
NB |
P APPROVED |
11/14/2019 |
0066144 PE |
MULIAWAN |
|
GRANTED 05/17/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 001 thru 005 006 thru 009
|
| 07/10/2019 |
320910289 |
05 |
NB |
P APPROVED |
07/29/2019 |
|
STEIN |
|
GRANTED 05/17/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,009
|
| 05/01/2019 |
321940263 |
02 |
A2 |
X SIGNED OFF |
02/11/2021 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
SUBSEQUENT FILING FOR UNDERGROUND UTILITIES.
|
|
Work on Floor(s): UDG
|
| 04/02/2019 |
321940263 |
01 |
A2 |
X SIGNED OFF |
02/11/2021 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
CONSTRUCTION OF UNDERGROUND UTILITIES ASSOCIATED WITH NEW BUILDING #320910
|
|
Work on Floor(s): OSP,UDG
|
| 03/19/2019 |
340666577 |
01 |
A3 |
X SIGNED OFF |
05/18/2020 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST(PM2) FOR WORKER ACCESS
|
|
Work on Floor(s): OSP
|
| 02/05/2019 |
321923120 |
01 |
A2 |
X SIGNED OFF |
12/09/2020 |
0066144 PE |
MULIAWAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF MANUAL, AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE
|
|
Work on Floor(s): ROF,GND 002 thru 009
|
| 12/11/2018 |
340649515 |
01 |
A3 |
X SIGNED OFF |
10/31/2019 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PERSONAL/MATERIAL HOIST FOR WORKER ACCESS DURING
|
|
Work on Floor(s): OSP
|
| 10/25/2018 |
321825655 |
01 |
A2 |
X SIGNED OFF |
08/28/2020 |
0066144 PE |
MULIAWAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING EMERGENCY GENERATOR IN CONJUNCTION WITH NEW BUILDING APPLI
|
|
Work on Floor(s): OSP
|
| 10/24/2018 |
321825637 |
01 |
A2 |
X SIGNED OFF |
02/05/2021 |
0066144 PE |
MULIAWAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING STANDPIPE IN CONJUNCT WITH NEW BUILDING # 320910289
|
|
Work on Floor(s): 001 thru 009
|
| 10/24/2018 |
321825664 |
01 |
A2 |
X SIGNED OFF |
03/05/2021 |
0066144 PE |
MULIAWAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF A REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PAS
|
|
Work on Floor(s): GRD,ROF 002 thru 009
|
| 10/24/2018 |
321825646 |
01 |
A2 |
X SIGNED OFF |
12/04/2020 |
0066144 PE |
MULIAWAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING SPRINKLER IN CONJUNCTION WITH NEW BUILDING # 320910289.
|
|
Work on Floor(s): RF 001 thru 009
|
| 10/24/2018 |
321846295 |
01 |
A2 |
X SIGNED OFF |
08/28/2020 |
0066144 PE |
MULIAWAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING BOILER IN CONJUNCTION WITH NB # 320910289
|
|
Work on Floor(s): ROF
|
| 10/16/2018 |
340640499 |
01 |
A3 |
H P/E IN PROCESS |
10/16/2018 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/26/2018 INSTALLATION OF TEMPORARY PERSONAL/MATERIAL HOIST
|
|
Work on Floor(s): OSP
|
| 05/22/2018 |
321713954 |
01 |
A2 |
P APPROVED |
05/22/2018 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/27/2021 HEREWITH FILING FOR UNDERGROUND PLUMBING WORK. I
|
|
Work on Floor(s): UNG,OSP
|
| 05/17/2018 |
321713945 |
01 |
A2 |
X SIGNED OFF |
02/18/2021 |
0066144 PE |
MULIAWAN |
|
NOT APPLICABLE
|
|
FILING TEMPORARY STANDPIPE IN CONJUNCTION WITH NEW BUILDING APPLICATION
|
|
Work on Floor(s): ROF 001 thru 009
|
| 05/02/2018 |
320910289 |
04 |
NB |
X SIGNED OFF |
06/08/2021 |
0088192 PE |
CIAMPI |
|
GRANTED 05/17/2018
|
|
HEREWITH FILING THE SOE
|
|
Work on Floor(s): 001
|
| 05/02/2018 |
340600004 |
01 |
A3 |
R PERMIT-ENTIRE |
01/22/2019 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/01/2020 E-Z BUILDER'S PAVEMENT PLAN AS PER PLANS FILED HE
|
|
Work on Floor(s): OSP
|
| 03/29/2018 |
321730347 |
01 |
A2 |
X SIGNED OFF |
09/28/2020 |
0088192 PE |
CIAMPI |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR TEST PILES INCLUDING GRADING AND BACK FILLING. IN
|
|
Work on Floor(s): 001
|
| 12/29/2017 |
320910289 |
03 |
NB |
X SIGNED OFF |
06/08/2021 |
0066144 PE |
MULIAWAN |
|
GRANTED 05/17/2018
|
|
HEREWITH FILING THE PLUMBING AND MECHANICAL AS PER PLANS
|
|
Work on Floor(s): 001 thru 005 006 thru 009
|
| 12/29/2017 |
320910289 |
02 |
NB |
X SIGNED OFF |
06/08/2021 |
0083416 PE |
BHATTACH |
|
GRANTED 05/17/2018
|
|
HEREWITH FILING FOUNDATION AND STRUCTURAL DRAWINGS.
|
|
Work on Floor(s): 001 thru 009
|
| 12/20/2017 |
320910289 |
01 |
NB |
X SIGNED OFF |
06/08/2021 |
0014686 RA |
STEIN |
|
GRANTED 05/17/2018
|
|
HEREWITH FILING NEW PARKING GARAGE AND LIGHT INDUSTRIAL/OFFICE BUILDING.
|
|
Work on Floor(s): 001,009
|