Premises: 101 SOUTH 5 STREET BROOKLYN BIN: 3424573    Block: 2443    Lot: 7501

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
01/24/2023 321594725 05 A1 P APPROVED 01/30/2023 KAZALAS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001

08/03/2022 321594725 04 A1 P APPROVED 09/12/2022 KAZALAS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 FORMALLY FILING ALTERATION TYPE I FOR CHANG
 Work on Floor(s): 001

06/03/2021 321594725 03 A1 P APPROVED 06/04/2021 KAZALAS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001

06/19/2020 321594725 02 A1 P APPROVED 07/23/2020 KAZALAS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001

03/04/2020 320597378 16 NB P APPROVED 03/11/2020 WOELFLIN GRANTED 11/18/2015
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 011

12/09/2019 320597378 15 NB P APPROVED 12/16/2019 WOELFLIN GRANTED 11/18/2015
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 011

08/06/2019 321594725 01 A1 R PERMIT-ENTIRE 11/14/2019 0030561 RA KAZALAS NOT APPLICABLE
 FORMALLY FILING ALTERATION TYPE I FOR CHANGE OF OCCUPANCY AT FIRST FLOOR,
 Work on Floor(s): 001

04/16/2019 320597378 14 NB P APPROVED 04/26/2019 0602931 PE ETTINGER GRANTED 11/18/2015
 POST APPROVAL AMENDMENT FOR 04
 Work on Floor(s): CEL,ROF 001 thru 011

04/16/2019 320597378 13 NB P APPROVED 04/30/2019 0602931 PE ETTINGER GRANTED 11/18/2015
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL,ROF 001 thru 011

09/27/2018 320597378 12 NB P APPROVED 10/03/2018 WOELFLIN GRANTED 11/18/2015
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 011

09/10/2018 320597378 11 NB P APPROVED 09/12/2018 0602931 PE ETTINGER GRANTED 11/18/2015
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL,ROF 001 thru 011

09/05/2018 320597378 10 NB P APPROVED 09/12/2018 0602931 PE ETTINGER GRANTED 11/18/2015
 POST APPROVAL AMENDMENT FOR 04
 Work on Floor(s): CEL,ROF 001 thru 011

08/14/2018 321823773 01 A3 P APPROVED 02/25/2019 0025988 RA WOELFLIN NOT APPLICABLE
 FIRE PROTECTION PLAN APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING
 Work on Floor(s): CEL,ROF 001 thru 011

07/20/2018 321807238 01 SC U COMPLETED 07/23/2018 0025988 RA WOELFLIN NOT APPLICABLE
 SUBDIVIDE EXISTING TAX LOT INTO TWO (2) CONDO TAX LOTS. NO CHANGE TO ZONIN
09/15/2017 320597378 09 NB P APPROVED 10/12/2017 0602931 PE ETTINGER GRANTED 11/18/2015
 POST APPROVAL AMENDMENT FOR 03 CONSTRUCT NEW 11 STORY MIXED USE BUILDING.
 Work on Floor(s): CEL,ROF 001 thru 011

06/07/2017 340511342 01 A3 X SIGNED OFF 10/24/2018 0071719 PE UDDIN NOT APPLICABLE
 INSTALLATION OF A SINGLE 7000 LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING
 Work on Floor(s): OSP

04/24/2017 321064343 02 A2 P APPROVED 06/29/2017 ETTINGER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DET
 Work on Floor(s): CEL,ROF 001 thru 011

04/03/2017 321551968 01 A2 X SIGNED OFF 03/26/2019 0060293 PE ETTINGER NOT APPLICABLE
 INSTALL BOILERS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
 Work on Floor(s): ROF

03/31/2017 321550932 01 A3 X SIGNED OFF 10/26/2018 0071719 PE UDDIN NOT APPLICABLE
 PLYWOOD FENCE PROPOSED INSTALLATION OF PLYWOOD FENCE AS PER PLAN. NO CHAN
 Work on Floor(s): OSP

03/31/2017 321550923 01 A3 X SIGNED OFF 01/05/2019 0071719 PE UDDIN NOT APPLICABLE
 ROOF PROTECTION PROPOSED INSTALLATION OF ROOF PROTECTION AS PER PLAN. NO
 Work on Floor(s): OSP

03/31/2017 321550914 01 A3 X SIGNED OFF 08/22/2018 0071719 PE UDDIN NOT APPLICABLE
 SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHAN
 Work on Floor(s): OSP

03/21/2017 320597378 08 NB P APPROVED 09/12/2017 0602931 PE ETTINGER GRANTED 11/18/2015
 POST APPROVAL AMENDMENT FOR 03 MECHANICAL AND PLUMBING WORK AS PER PLANS F
 Work on Floor(s): CEL,ROF 001 thru 011

03/21/2017 320597378 07 NB P APPROVED 09/12/2017 0602931 PE ETTINGER GRANTED 11/18/2015
 POST APPROVAL AMENDMENT FOR 04 SPRINKLER/STANDPIPE WORK AS PER PLANS FILED
 Work on Floor(s): CEL,ROF 001 thru 011

03/21/2017 320597378 06 NB P APPROVED 07/10/2017 WOELFLIN GRANTED 11/18/2015
 POST APPROVAL AMENDMENT FOR 01 CONSTRUCT NEW 11 STORY MIXED USE BUILDING.
 Work on Floor(s): CEL,ROF 001 thru 011

02/02/2017 321520243 01 A3 R PERMIT-ENTIRE 03/05/2018 0093179 PE AHMED NOT APPLICABLE
 JOB WITHDRAWN 08/21/2019 INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIR
 Work on Floor(s): OSP

07/28/2016 340406616 01 A3 X SIGNED OFF 01/16/2019 0060597 PE SHAPIRO NOT APPLICABLE
 INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. FILED IN
 Work on Floor(s): GRD

10/16/2015 340315723 01 A2 X SIGNED OFF 04/01/2019 0602931 PE ETTINGER NOT APPLICABLE
 INSTALL TEMPORARY DRY STANDPIPE ALARM SYSTEM DURING CONSTRUCTION AS PER PL
 Work on Floor(s): CEL,ROF 001 thru 011

07/21/2015 340283357 01 A3 X SIGNED OFF 05/10/2019 0025988 RA WOELFLIN NOT APPLICABLE
 PROVIDE BUILDERS PAVEMENT PLAN FOR A TOTAL FRONTAGE OF 175 FEET. IN CONJUN
 Work on Floor(s): OSP

06/10/2015 320597378 05 NB X SIGNED OFF 03/11/2020 0068605 PE PILLORI GRANTED 11/18/2015
 SUPPORT OF EXCAVATION (SOE) AS PER PLANS FILED
 Work on Floor(s): OSP

12/30/2014 321064343 01 A2 X SIGNED OFF 08/19/2019 0602931 PE ETTINGER NOT APPLICABLE
 INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM
 Work on Floor(s): CEL,ROF 001 thru 011

12/16/2014 320597378 04 NB X SIGNED OFF 03/11/2020 0602931 PE ETTINGER GRANTED 11/18/2015
 SPRINKLER/STANDPIPE WORK AS PER PLANS FILED
 Work on Floor(s): CEL,ROF 001 thru 011

12/16/2014 320597378 03 NB X SIGNED OFF 03/11/2020 0602931 PE ETTINGER GRANTED 11/18/2015
 CONSTRUCT NEW 11 STORY MIXED USE BUILDING.
 Work on Floor(s): CEL,ROF 001 thru 011

12/16/2014 320597378 02 NB X SIGNED OFF 03/11/2020 0060272 PE DE NARDI GRANTED 11/18/2015
 STRUCTURAL WORK AS PER PLANS FILED
 Work on Floor(s): CEL,ROF 001 thru 011

12/15/2014 320597378 01 NB X SIGNED OFF 03/11/2020 0025988 RA WOELFLIN GRANTED 11/18/2015
 CONSTRUCT NEW 11 STORY MIXED USE BUILDING.
 Work on Floor(s): CEL,ROF 001 thru 011