 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/02/2025 |
320909371 |
06 |
NB |
P APPROVED |
09/02/2025 |
|
SPECTOR |
|
AMENDED 11/16/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,OSP,ROF 001 thru 011
|
| 03/05/2024 |
320909371 |
05 |
NB |
P APPROVED |
06/18/2025 |
0032338 RA |
SPECTOR |
|
AMENDED 11/16/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,OSP,ROF 001 thru 011
|
| 09/14/2023 |
320909371 |
04 |
NB |
P APPROVED |
09/28/2023 |
|
SPECTOR |
|
AMENDED 11/16/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,OSP,ROF 001 thru 011
|
| 07/07/2022 |
340750930 |
02 |
A3 |
P APPROVED |
08/02/2022 |
|
KRUPNUK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 07/31/2020 |
340750930 |
01 |
A3 |
R PERMIT-ENTIRE |
10/24/2022 |
0065639 PE |
KRUPNUK |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY OVERHEAD AND ROOF PROTECTION OFF 3RD FLOOR FOR N
|
|
Work on Floor(s): 003
|
| 01/15/2019 |
320909371 |
03 |
NB |
P APPROVED |
01/29/2019 |
|
SPECTOR |
|
AMENDED 11/16/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 011
|
| 07/06/2018 |
321771702 |
01 |
A2 |
P APPROVED |
07/11/2018 |
0079743 PE |
SHEYKMAN |
|
NOT APPLICABLE
|
|
INSTALL PLUMBING AND MECHANICAL SYSTEM IN CONJUNCTION WITH NB APPLICATION.
|
|
Work on Floor(s): ROO 001 thru 012
|
| 07/06/2018 |
321799327 |
01 |
A2 |
P APPROVED |
07/11/2018 |
0079743 PE |
SHEYKMAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF AUTOMATIC SPRINKLER AND STANDPIPE SYSTEM FILED IN CONJUNCT
|
|
Work on Floor(s): BAS 001 thru 012
|
| 02/26/2018 |
321785298 |
01 |
A3 |
J P/E DISAPPROVED |
02/28/2018 |
0035362 RA |
KINDO |
|
NOT APPLICABLE
|
|
FILING BPP, FRONTAGE 80', IN CONJUNCTION WITH NB #320909371
|
|
Work on Floor(s): BAS 001 thru 012
|
| 01/24/2018 |
321666185 |
01 |
A2 |
D A/P ENTIRE |
01/24/2018 |
0035362 RA |
KINDO |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYS
|
|
Work on Floor(s): BAS 001 thru 012
|
| 01/23/2018 |
340579065 |
01 |
A2 |
H P/E IN PROCESS |
01/23/2018 |
0035362 RA |
KINDO |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 03/24/2018 PLUMBING AND MECHANICAL WORK IN CONJUNCTION WITH N
|
|
Work on Floor(s): BAS 001 thru 012
|
| 01/23/2018 |
340579056 |
01 |
A2 |
H P/E IN PROCESS |
01/23/2018 |
0035362 RA |
KINDO |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 03/24/2018 INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM IN CONJ
|
|
Work on Floor(s): BAS 001 thru 012
|
| 01/23/2018 |
340579047 |
01 |
A2 |
D A/P ENTIRE |
01/23/2018 |
0035362 RA |
KINDO |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 03/24/2018 INSTALLATION OF STAND PIPE SYSTEM IN CONJUNCTION W
|
|
Work on Floor(s): BAS 001 thru 012
|
| 01/23/2018 |
340579038 |
01 |
A3 |
D A/P ENTIRE |
01/23/2018 |
0035362 RA |
ROSS |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 03/24/2018 FILE THE CONSTRUCTION FENCE IN CONJUNCTION WITH FU
|
|
Work on Floor(s): GRO
|
| 05/09/2017 |
340502192 |
01 |
A2 |
H P/E IN PROCESS |
05/09/2017 |
0035362 RA |
KINDO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/09/2017 INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM IN CON
|
|
Work on Floor(s): BAS 001 thru 012
|
| 09/26/2015 |
320909371 |
02 |
NB |
R PERMIT-ENTIRE |
07/31/2019 |
0065639 PE |
KRUPNIK |
|
AMENDED 11/16/2018
|
|
HEREWITH SUBMIT STRUCTURAL DRAWINGS IN CONJUNCTION WITH NEW BUILDING
|
|
Work on Floor(s): 001,012
|
| 09/17/2015 |
320909371 |
01 |
NB |
R PERMIT-ENTIRE |
10/07/2022 |
0032338 RA |
SPECTOR |
|
AMENDED 11/16/2018
|
|
NEW TWELVE STORY RESIDENTIAL BUILDING.
|
|
Work on Floor(s): BAS,OSP,ROF 001 thru 011
|
| 08/11/2015 |
340291115 |
01 |
A3 |
R PERMIT-ENTIRE |
03/11/2021 |
0035362 RA |
ROSS |
|
NOT APPLICABLE
|
|
FILE THE CONSTRUCTION FENCE IN CONJUNCTION WITH FULL DEMOLITION OF ONE FAM
|
|
Work on Floor(s): GRO
|
| 02/05/2014 |
320892183 |
01 |
A3 |
R PERMIT-ENTIRE |
08/13/2014 |
0070127 PE |
GUREVICH |
|
NOT APPLICABLE
|
|
INSTALLATION OF CONSTRUCTION FENCE IN CONJUNCTION WITH DEMOLITION OF EXIST
|
|
Work on Floor(s): GRO
|