| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/31/2025 |
320375232 |
22 |
NB |
P APPROVED |
04/16/2025 |
0035121 RA |
RO |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 054
|
| 02/19/2021 |
320375232 |
21 |
NB |
P APPROVED |
03/19/2021 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 054
|
| 10/29/2020 |
321929437 |
02 |
A2 |
P APPROVED |
07/12/2021 |
|
REDMOND |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 003
|
| 08/11/2020 |
321929446 |
04 |
A2 |
P APPROVED |
08/28/2020 |
|
AMATO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 003
|
| 02/29/2020 |
321929446 |
03 |
A2 |
P APPROVED |
03/03/2020 |
|
REDMOND |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001 thru 003
|
| 03/06/2019 |
321929446 |
01 |
A2 |
X SIGNED OFF |
09/14/2020 |
0034014 RA |
AMATO |
|
NOT APPLICABLE
|
|
(COMPASS) FILING HEREWITH FOR GENERAL CONSTRUCTION; WORK TYPES TO INCLUDE
|
|
Work on Floor(s): 001 thru 003
|
| 03/06/2019 |
321929428 |
01 |
A2 |
X SIGNED OFF |
03/07/2020 |
0091519 PE |
REDMOND |
|
NOT APPLICABLE
|
|
(COMPASS) ADDITION/MODIFICATION TO AN EXISTING SPRINKLER SYSTEM. NO CHANGE
|
|
Work on Floor(s): 001 thru 003
|
| 03/06/2019 |
321929437 |
01 |
A2 |
X SIGNED OFF |
10/29/2021 |
0091519 PE |
REDMOND |
|
NOT APPLICABLE
|
|
(COMPASS)FILING HEREWITH FOR THE INSTALLATION OF A NEW NEW MANUAL & AUTOM
|
|
Work on Floor(s): ROF 001 thru 003
|
| 03/06/2019 |
321929446 |
02 |
A2 |
X SIGNED OFF |
09/14/2020 |
0091519 PE |
REDMOND |
|
NOT APPLICABLE
|
|
(COMPASS) MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH INITIAL FILING
|
|
Work on Floor(s): 001 thru 003
|
| 02/19/2019 |
320375232 |
20 |
NB |
P APPROVED |
02/01/2021 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 054
|
| 01/29/2019 |
320375232 |
19 |
NB |
P APPROVED |
01/30/2019 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 054
|
| 11/28/2018 |
321384970 |
03 |
A2 |
X SIGNED OFF |
11/25/2019 |
0074933 PE |
DESIMONE |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK ASSOCIATED WITH INFILL ON 2ND & 3RD FLOORS.
|
|
Work on Floor(s): 002,003
|
| 11/28/2018 |
321384970 |
02 |
A2 |
X SIGNED OFF |
11/25/2019 |
0091697 PE |
NAGORNY |
|
NOT APPLICABLE
|
|
INSTALL NEW MECHANICAL EQUIPMENT AS PER PLANS. MINOR SPRINKLER WORK
|
|
Work on Floor(s): ROF 001 thru 003
|
| 11/20/2018 |
321384970 |
01 |
A2 |
X SIGNED OFF |
11/25/2019 |
0014686 RA |
STEIN |
|
NOT APPLICABLE
|
|
INFILL PORTION OF 2ND & 3RD FLOORS AS PER PLANS. INCREASE IN FLOOR AREA AP
|
|
Work on Floor(s): ROF 001 thru 003
|
| 11/05/2018 |
320375232 |
18 |
NB |
P APPROVED |
01/03/2019 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 054
|
| 11/02/2018 |
340644119 |
01 |
A2 |
D A/P ENTIRE |
11/02/2018 |
0014686 RA |
STEIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/02/2018 INFILL PORTION OF 2ND & 3RD FLOORS AS PER PLANS.
|
|
Work on Floor(s): ROF 001 thru 003
|
| 09/11/2018 |
320375232 |
17 |
NB |
P APPROVED |
09/26/2018 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 054
|
| 08/29/2018 |
320375232 |
16 |
NB |
P APPROVED |
09/26/2018 |
0058375 PE |
MASS |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL,MEZ,UDG 001 thru 054
|
| 04/20/2018 |
320375232 |
15 |
NB |
P APPROVED |
05/04/2018 |
0058375 PE |
MASS |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL,MEZ,UDG 001 thru 054
|
| 04/20/2018 |
320375232 |
14 |
NB |
P APPROVED |
04/27/2018 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 054
|
| 09/01/2017 |
321649383 |
01 |
A2 |
X SIGNED OFF |
05/02/2018 |
0065403 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
INSTALL (1) NEW GAS FIRED DIRECT VENT FIREPLACE ON THE 2ND FLOOR IN CONJUN
|
|
Work on Floor(s): 2ND
|
| 07/19/2017 |
321526229 |
01 |
A2 |
X SIGNED OFF |
12/08/2017 |
0022382 RA |
TARTAGLI |
|
NOT APPLICABLE
|
|
INSTALLATION OF MANUAL, AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM
|
|
Work on Floor(s): 001,CEL
|
| 07/13/2017 |
320375232 |
13 |
NB |
P APPROVED |
07/26/2017 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 054
|
| 06/06/2017 |
320375232 |
12 |
NB |
P APPROVED |
06/16/2017 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 054
|
| 05/12/2017 |
321573338 |
01 |
A3 |
X SIGNED OFF |
06/06/2018 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPT
|
|
Work on Floor(s): ROF
|
| 02/28/2017 |
320515144 |
03 |
A2 |
P APPROVED |
03/07/2017 |
|
MASS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,MEZ 001 thru 054
|
| 01/18/2017 |
320375232 |
11 |
NB |
P APPROVED |
02/17/2017 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 054
|
| 12/21/2016 |
320375232 |
10 |
NB |
P APPROVED |
12/28/2016 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 054
|
| 11/06/2016 |
340441365 |
01 |
A3 |
P APPROVED |
11/06/2016 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/14/2019 TENANT PROTECTION PLAN
|
|
Work on Floor(s): CEL,MEX,001,THR,054
|
| 11/01/2016 |
320375232 |
09 |
NB |
P APPROVED |
11/04/2016 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,MEZ 001 thru 054
|
| 10/17/2016 |
320515144 |
02 |
A2 |
P APPROVED |
11/16/2016 |
|
MASS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,MEZ 001 thru 054
|
| 09/29/2016 |
320375232 |
08 |
NB |
P APPROVED |
10/31/2016 |
|
STEIN |
|
AMENDED 01/03/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,MEZ 001 thru 054
|
| 09/09/2016 |
321447127 |
01 |
A3 |
X SIGNED OFF |
06/06/2018 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF CANTILEVERED PLATFORM AS PER DRAWINGS, DURING NEW BUILDING
|
|
Work on Floor(s): 049,OSP
|
| 08/26/2016 |
321145355 |
01 |
A3 |
X SIGNED OFF |
06/30/2017 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PLATFORM OVER SWIMMING POOL AS PER DRAWINGS DURI
|
|
Work on Floor(s): 002
|
| 08/19/2016 |
321312076 |
02 |
A3 |
P APPROVED |
08/22/2016 |
|
BLINN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 052
|
| 08/11/2016 |
321433472 |
01 |
A3 |
X SIGNED OFF |
06/30/2017 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD INSIDE ELEVATOR SHAFT AS PER DRAWINGS DURING
|
|
Work on Floor(s): CEL,TRU,BHD
|
| 08/09/2016 |
321145346 |
01 |
A3 |
X SIGNED OFF |
06/30/2017 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AT WATER TANKS AS PER DRAWINGS DURING NEW BUILDIN
|
|
Work on Floor(s): ROF
|
| 07/27/2016 |
340406402 |
01 |
A3 |
X SIGNED OFF |
06/12/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 07/21/2016 |
321412379 |
01 |
A3 |
X SIGNED OFF |
06/06/2018 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF OVERHEAD PROTECTION AS PER DRAWINGS DURING NEW BUILDING
|
|
Work on Floor(s): 003
|
| 05/10/2016 |
321380368 |
01 |
PA |
U COMPLETED |
07/18/2017 |
0014686 RA |
STEIN |
|
NOT APPLICABLE
|
|
Work on Floor(s): 002
|