| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/18/2023 |
320550015 |
04 |
A3 |
P APPROVED |
10/24/2023 |
|
KIM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 02/09/2023 |
320550015 |
03 |
A3 |
P APPROVED |
10/11/2023 |
0033611 RA |
KIM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/31/2022 |
321005728 |
04 |
A3 |
P APPROVED |
09/15/2022 |
|
AHEAD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 07/29/2022 |
321005737 |
05 |
A3 |
P APPROVED |
08/04/2022 |
|
AHEAD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 07/21/2022 |
321005737 |
04 |
A3 |
P APPROVED |
07/22/2022 |
0104414 PE |
AHEAD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/04/2021 |
321005728 |
03 |
A3 |
P APPROVED |
08/10/2021 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/04/2021 |
321005737 |
03 |
A3 |
P APPROVED |
08/10/2021 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/09/2020 |
340720642 |
01 |
A2 |
X SIGNED OFF |
08/01/2022 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 12/07/2016 |
321491845 |
01 |
A2 |
X SIGNED OFF |
12/22/2016 |
0065106 PE |
SHARON |
|
NOT APPLICABLE
|
|
MECHANICAL APPLICATION FILED TO OBTAIN EQUIPMENT USE PERMITS.
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 08/19/2014 |
321005737 |
02 |
A3 |
P APPROVED |
08/19/2014 |
|
STILES |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/19/2014 |
321005728 |
02 |
A3 |
P APPROVED |
08/19/2014 |
|
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/03/2014 |
321005728 |
01 |
A3 |
X SIGNED OFF |
09/19/2022 |
0104414 PE |
AHEAD |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. ALL WORK SHALL BE ACCORDING TO
|
|
Work on Floor(s): OSP
|
| 06/02/2014 |
321005737 |
01 |
A3 |
X SIGNED OFF |
08/05/2022 |
0104414 PE |
AHEAD |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. LIVE LOAD 3
|
|
Work on Floor(s): OSP
|
| 11/21/2013 |
310169974 |
07 |
A2 |
P APPROVED |
11/22/2013 |
|
SHARON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ 01 thru 10
|
| 11/01/2013 |
310169974 |
06 |
A2 |
P APPROVED |
11/19/2013 |
|
SHARON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ 01 thru 10
|
| 10/29/2013 |
310169974 |
05 |
A2 |
P APPROVED |
10/31/2013 |
|
SHARON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ 01 thru 10
|
| 09/04/2013 |
320550015 |
02 |
A3 |
P APPROVED |
09/30/2013 |
|
SCHNEIDE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 BNP 12-254, TOTAL FRONTAGE 228' NB# 3023517
|
|
Work on Floor(s): OSP
|
| 06/18/2013 |
310169974 |
04 |
A2 |
P APPROVED |
07/01/2013 |
|
SHARON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ 01 thru 10
|
| 05/14/2013 |
310169974 |
03 |
A2 |
P APPROVED |
06/06/2013 |
|
SHARON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ 01 thru 10
|
| 09/06/2012 |
320550015 |
01 |
A3 |
X SIGNED OFF |
12/13/2023 |
0033611 RA |
KIM |
|
NOT APPLICABLE
|
|
BNP 12-254, TOTAL FRONTAGE 228' NB# 302351773
|
|
Work on Floor(s): OSP
|
| 08/03/2012 |
310169974 |
02 |
A2 |
P APPROVED |
08/06/2012 |
0065106 PE |
SHARON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ 01 thru 10
|
| 04/09/2012 |
302351773 |
02 |
NB |
P APPROVED |
08/17/2012 |
0027477 RA |
DONSKOY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 --
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 06/23/2008 |
310169974 |
01 |
A2 |
X SIGNED OFF |
07/31/2021 |
0065106 PE |
SHARON |
|
NOT APPLICABLE
|
|
MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS DRAWINGS IN CONJUNCTION WITH NB
|
|
Work on Floor(s): SUB,CEL,MZ 01 thru 10
|
| 12/03/2007 |
310067192 |
01 |
A2 |
X SIGNED OFF |
08/30/2022 |
0027477 RA |
DONSKOY |
|
NOT APPLICABLE
|
|
CLEANUP OF THE SITE, INSTALLATION OF TEMPERARY CONSTRUCTION FENCE, EXCAVAT
|
|
Work on Floor(s): OSP
|
| 10/12/2007 |
302391971 |
01 |
DM |
X SIGNED OFF |
01/06/2021 |
OT |
NEIMAN |
|
NOT APPLICABLE
|
| 08/08/2007 |
310004713 |
01 |
A3 |
X SIGNED OFF |
08/08/2022 |
0027477 RA |
DONSKOY |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPERARY CONSTRUCTION FENCE ALONG LOT LINES TO SAFE GUARD
|
|
Work on Floor(s): OSP
|
| 06/04/2007 |
302351773 |
01 |
NB |
X SIGNED OFF |
07/03/2014 |
0027477 RA |
DONSKOY |
|
NOT APPLICABLE
|
|
--
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 02/02/2007 |
302278531 |
01 |
A2 |
R PERMIT-ENTIRE |
01/03/2008 |
0027477 RA |
DONSKOY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/31/2022 PROPOSED REMOVAL OF EXISTING FURRING PARTITIONS T
|
|
Work on Floor(s): 001,002, 004
|