 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 09/08/2017 |
321341099 |
PR |
I LAA SIGNED OFF |
11/16/2017 |
FSC 000930 |
MISA |
|
INSTALL (2) SPRINKLER HEADS ON THE 1ST FLOOR AND RUN APPROX 15' OF 1" SPRI
|
|
Work on Floor(s): 001
|
| 08/24/2017 |
340537609 |
PR |
E LAA FILED |
08/24/2017 |
FSC 000930 |
MISA |
|
JOB CLOSED 07 30 2018
|
|
Work on Floor(s): 001
|
| 12/27/2011 |
310454647 |
PR |
I LAA SIGNED OFF |
09/12/2012 |
MP 001932 |
MARTINO |
|
INSTALLING 3 SPRINKLER HEADS IN BOILER ROOM FOR TEMP HEAT. IN CELLAR.
|
|
Work on Floor(s): CEL
|
| 12/27/2011 |
310454656 |
PR |
I LAA SIGNED OFF |
08/06/2012 |
MP 001932 |
MARTINO |
|
TEMPORARY HEAT USING BOILER UNILUX MEA#175-99E MDL#W 1600 - 16,000,000 INP
|
|
Work on Floor(s): CEL
|
| 08/09/2010 |
310397308 |
PR |
E LAA FILED |
08/09/2010 |
FSC 000148 |
LANCELLO |
|
JOB CLOSED 12 22 2020 THE CUTTING/CAPPING & REMOVING OF SPRINKLERS & STAND
|
|
Work on Floor(s): 009,ROF
|
| 08/06/2010 |
310399976 |
PR |
E LAA FILED |
08/09/2010 |
FSC 000148 |
LANCELLO |
|
JOB CLOSED 12 23 2020 CUTTING, CAPPING & REMOVING OF SPRINKLERS IS BEING P
|
|
Work on Floor(s): CEL 001 thru 004
|
| 04/24/2003 |
301458036 |
PR |
E LAA FILED |
04/24/2003 |
MP 000331 |
WACHTEL |
|
JOB CLOSED 12 21 2020 IN THE CELLAR, REPLACE EXISITNG BOILER WITH A BURNHA
|
|
Work on Floor(s): CEL
|