| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/11/2019 |
321192632 |
09 |
A1 |
P APPROVED |
10/11/2019 |
0020553 RA |
O'BYRNE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 10/03/2019 |
321192632 |
08 |
A1 |
P APPROVED |
10/04/2019 |
|
O'BYRNE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 06/28/2019 |
321192632 |
07 |
A1 |
P APPROVED |
06/28/2019 |
0205331 RA |
O'BYRNE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,ROF,OSP
|
| 06/21/2019 |
321192632 |
06 |
A1 |
P APPROVED |
06/21/2019 |
0205331 RA |
O'BYRNE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,ROF,OSP
|
| 05/21/2019 |
321192632 |
05 |
A1 |
P APPROVED |
05/31/2019 |
0205331 RA |
O'BYRNE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,ROF,OSP
|
| 12/10/2018 |
322052620 |
01 |
A2 |
X SIGNED OFF |
09/20/2019 |
0028869 RA |
ADDESSO |
|
NOT APPLICABLE
|
|
EXTERIOR REPAIRS TO INCLUDE FLASHING, WATERPROOFING & PATCHING AS PER PLAN
|
|
Work on Floor(s): FAC,ROF 001 thru 004
|
| 11/16/2018 |
321192632 |
04 |
A1 |
P APPROVED |
12/12/2018 |
0205331 RA |
O'BYRNE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,002,004,ROF
|
| 10/05/2018 |
340637788 |
01 |
A2 |
X SIGNED OFF |
09/30/2019 |
0034625 RA |
CHEN |
|
NOT APPLICABLE
|
|
BUILD IT BACK PROGRAM (APP# 017009): FILING FOR THE INSTALLATION OF A TEMP
|
|
Work on Floor(s): ROF,CEL 001 thru 004
|
| 08/02/2018 |
340622972 |
01 |
A2 |
J P/E DISAPPROVED |
08/03/2018 |
0034625 RA |
CHEN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/26/2018 BUILD IT BACK PROGRAM (APP# 017009): FILING FOR T
|
|
Work on Floor(s): ROF,CEL 001 thru 004
|
| 07/27/2018 |
321752493 |
01 |
A2 |
F ASSIGNED TO P/E |
07/31/2018 |
0034625 RA |
CHEN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/28/2018 BUILD IT BACK PROGRAM: FILING FOR THE INSTALLATIO
|
|
Work on Floor(s): ROF 001 thru 004
|
| 03/28/2017 |
321192632 |
03 |
A1 |
X SIGNED OFF |
11/07/2019 |
0205331 RA |
O'BYRNE |
|
NOT APPLICABLE
|
|
BUILD IT BACK PROGRAM -FILING TO SUBMIT STRUCTURAL PLANS FOR APPLICATION
|
|
Work on Floor(s): CEL,001,ROF
|
| 01/23/2017 |
321192632 |
02 |
A1 |
X SIGNED OFF |
11/07/2019 |
0205331 RA |
O'BYRNE |
|
NOT APPLICABLE
|
|
CONSTRUCT NEW BOILER ENCLOSURE ON TOP OF EXISTING STAIR BULKHEAD ON LOWER
|
|
Work on Floor(s): CEL,001,ROF,OSP
|
| 07/29/2016 |
321192632 |
01 |
A1 |
X SIGNED OFF |
11/07/2019 |
0020553 RA |
O'BYRNE |
|
NOT APPLICABLE
|
|
BUILD IT BACK PROGRAM. RELOCATE BOILER AND ELECTRICAL ROOM ABOVE FRCE. INS
|
|
Work on Floor(s): CEL,001,ROF
|
| 07/22/2016 |
340404360 |
01 |
A2 |
J P/E DISAPPROVED |
07/26/2016 |
0036848 RA |
SKORNECK |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/11/2019 CONSTRUCT NEW BOILER ENCLOSURE ON TOP OF EXISTING
|
|
Work on Floor(s): CEL,001,004,ROF
|
| 01/19/2011 |
301500481 |
09 |
NB |
P APPROVED |
04/12/2011 |
|
VAN ARNA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 02/26/2010 |
301500481 |
08 |
NB |
P APPROVED |
03/09/2010 |
|
VAN ARNA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 09/22/2009 |
320079302 |
01 |
A3 |
X SIGNED OFF |
01/19/2010 |
0011323 RA |
VAN ARNA |
|
NOT APPLICABLE
|
|
C/C FILED IN CONJUNCTION WITH NB APP 301500481 C/C # 1 WITH A LINEAR FEET
|
|
Work on Floor(s): OSP
|
| 07/27/2009 |
301500481 |
07 |
NB |
P APPROVED |
08/03/2009 |
|
VAN ARNA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 03/24/2009 |
301500481 |
06 |
NB |
J P/E DISAPPROVED |
04/02/2009 |
|
VAN ARNA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 04/23/2009
|
|
Work on Floor(s): CEL 001 thru 004
|
| 03/18/2009 |
301500481 |
05 |
NB |
D A/P ENTIRE |
04/03/2009 |
|
VAN ARNA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 04/23/2009
|
|
Work on Floor(s): CEL 001 thru 004
|
| 09/05/2008 |
301500481 |
04 |
NB |
P APPROVED |
09/19/2008 |
|
VAN ARNA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 09/02/2008 |
301893869 |
03 |
A2 |
P APPROVED |
09/15/2008 |
|
VAN ARNA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 07/02/2007 |
301500481 |
03 |
NB |
P APPROVED |
11/09/2007 |
0011323 RA |
VAN ARNA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL 001 thru 004
|
| 03/27/2007 |
301893869 |
02 |
A2 |
P APPROVED |
08/09/2007 |
0011323 RA |
VAN ARNA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 06/08/2006 |
302176749 |
01 |
A3 |
P APPROVED |
06/20/2006 |
0011323 RA |
VAN ARNA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/24/2009
|
|
Work on Floor(s): CEL 001 thru 004
|
| 05/03/2005 |
301944671 |
01 |
A3 |
X SIGNED OFF |
05/31/2011 |
0011323 RA |
VAN ARNA |
|
NOT APPLICABLE
|
|
TEMPORARY CONSTRUCTION FENCE IN CONJUNCT ION WITH AND REQUIRED BY NEW BU
|
|
Work on Floor(s): C 001 thru 004
|
| 01/27/2005 |
301890657 |
01 |
A3 |
X SIGNED OFF |
12/23/2010 |
0011323 RA |
VAN ARNA |
|
NOT APPLICABLE
|
|
BPP IN CONJUCTION WITH NB APPLICATION #3 01500481 WITH STREET FRONTAGE
|
|
Work on Floor(s): CEL 001 thru 004
|
| 01/13/2005 |
301893869 |
01 |
A2 |
X SIGNED OFF |
06/23/2010 |
0011323 RA |
VAN ARNA |
|
NOT APPLICABLE
|
|
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH NB APPLICATION #301500481
|
|
Work on Floor(s): CEL 001 thru 004
|
| 09/30/2004 |
301500481 |
02 |
NB |
X SIGNED OFF |
04/19/2011 |
0011323 RA |
VAN ARNA |
|
NOT APPLICABLE
|
|
NEW FOUR-STORY BUILDING AND CELLAR WITH A TOTAL OF 20-J2
|
|
Work on Floor(s): CEL 001 thru 004
|
| 02/07/2003 |
301500481 |
01 |
NB |
X SIGNED OFF |
04/19/2011 |
0011323 RA |
VAN ARNA |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL 001 thru 004
|