Electrical Application Details for App #: Z154175
NO JOBS FOUND WITH YOUR CRITERIA
Premises: 208 CENTRAL PARK SOUTH MANHATTAN BIN: 1024919     Block: 1030   Lot: 39
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 210 CENTRAL PARK S Census Tract:   137 Health Area:  4700
PIT Admin Area:   Z - UPPER MANHATTAN Inspection Area:   F
NEW YORK, NY 10019 Community Board:   105
Special Place Name:   ROOF/MOTOR ROOM
DOB Cross Street(s):   CENTRAL PARK EXIT 7 AVENUE,    COLUMBUS CIRCLE
Status:   C - JOB IS SIGNED OFF 07/06/2022
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  03/21/2016 1:18 PM
Application Entered:   03/21/2016 Job Start Date:   06/06/2016
Last Change:   07/06/2022 Job End Date:   07/11/2016
Appointment Status:   
Last Inspection By:   SAMIR BASILLI       On     07/05/2022      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 011706 Licensee Name: BRIAN FAERBER
Firm: 003598 Firm Name: CENTURY ELECTRIC LLC
Firm Phone: 718-937-6200  Firm Address: 25-25 49TH STREET LONG ISLAND CITY NY 11103 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT
Total Fee:  $476.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: ADAM ZERKA
Owner Business Name: CENTURY MANAGEMENT
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  2  250.00
B. Each Additional 10 Floors Or Less  2  166.00
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
ROF              40      50 
Buildings Total              40          50 
Total Units : 90 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice: 1 - FIRST NOTICE 04/28/2022
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

*NO JOBS FOUND WITH YOUR CRITERIA
INSPECTION FOR APPLICATION #: Z154175
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 08/09/2021 08/09/2021 SWR N (20) (0) Y
INSPECTION COMMENTS: INSPECTION INCOMPLETE. CALLED CONTRACTOR AND PUT ON HOLD. NO SHOW, OK TO PROCEED AS PER OFFICE DIRECTION.
 
(2) 04/27/2022 04/28/2022 HBU V (45) (6)
INSPECTION COMMENTS: FAIL. INSPECTION COMPLETED. OBJECTIONS ISSUED. ATOI KURT.
 
(3) 07/05/2022 07/06/2022 SXB C R (44) (0)
INSPECTION COMMENTS: PASS. OBJECTIONS RESOLVED.

OBJECTION FOR APPLICATION #: Z154175
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (176) INSTALLATION DOES NOT MEET CODE REQUIREMENTS
(BASEMENT)ART.620.24, NOT PROVIDED GFCI RECEPTACLES IN THE PIT OF ELEVATORST-OUT.
RSLV 04/27/2022 04/27/2022 07/05/2022
 
002 (125) PROTECTION OF CONDUCTORS NOT INSTALLED AS PER CODE
(ROOF) ART.240.4 ,ELEVATOR TRANSFORMERS SECONDARY SIDE OVERCURRENTPROTECTION ARE NOT PROVIDED T-OUT. CAPACITY OF TRANSFORMER IS 50KVA. SECONDARY SIDE CONDUCTOR #2 AWG.TWO TRANSFORMERS,EACH CAPACITY50 KVA,SECONDARY SIDE CONDUCTOR #2AWG,FUSE RATING 150A AT THE MAINDISC.SW.
RSLV 04/27/2022 04/27/2022 07/05/2022
 
003 (132) EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED
(ROOF)ART. 250.148, MAIN DISC.SW. IS NOT GROUNDED OF ELEVATOR IP 28179.SIZE OF FUSE IS 150ATWO TRANSFORMERS,EACH CAPACITY 50 KVA,SECONDARYSIDE CONDUCTOR #2AWG,FUSE RATING 150A AT THE MAIN DISC.SW..
RSLV 04/27/2022 04/27/2022 07/05/2022
 
004 (176) INSTALLATION DOES NOT MEET CODE REQUIREMENTS
(ROOF)ART. 620.53, NOT PROVIDED DISC. SW. FOR CAR LIGHT OF ELEVATORST-OUT.
RSLV 04/27/2022 04/27/2022 07/05/2022
 
005 (176) INSTALLATION DOES NOT MEET CODE REQUIREMENTS
(ROOF)ART. 620.53, NOT PROVIDED SIGN TO IDENTIFY THE LOCATION OF THESUPPLY SIDE OCPD FOR MAIN DISC.SW. OF ELEVATOR T-OUT.
RSLV 04/27/2022 04/27/2022 07/05/2022
 
006 (308) CONDUCTORS ARE NOT PROPERLY INSTALLED/TERMINATED
(ROOF) ART. 110.14 DOUBLE LUGGING IN THE X0 OF TRANSFORMERS FORGROUNDED/BONDED T-OUT.
RSLV 04/27/2022 04/27/2022 07/05/2022