Electrical Application Details for App #: B402578
NO JOBS FOUND WITH YOUR CRITERIA
Premises: 4821 6 AVENUE BROOKLYN BIN: 3337241     Block: 776   Lot: 1
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 4821 6 AV Census Tract:   98 Health Area:  6500
CEL. 004.PEN Admin Area:   B - BROOKLYN Inspection Area:   J
BROOKLYN, NY 11220 Community Board:   307
Related Job Number:    321200874
DOB Cross Street(s):    48 STREET,    49 STREET
Status:   C - JOB IS SIGNED OFF 12/09/2016
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  10/23/2015 9:03 AM
Application Entered:   10/23/2015 Job Start Date:   10/23/2015
Last Change:   12/09/2016 Job End Date:   04/20/2016
Appointment Status:   
Last Inspection By:   TREJO, JORGE       On     12/09/2016      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 010902 Licensee Name: KWOK WAH TANG
Firm: 004115 Firm Name: E D ELECTRICAL INC
Firm Phone: 718-331-3887  Firm Address: 6614 14TH AVENUE BROOKLYN NY 11219 

Work Started or Filed by Others: YES
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
8 - BOILER/BURNER WIRING
Total Fee:  $177.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   B - Two Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: GUI XING ZHU
Owner Business Name: N/A
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  2  #8 AND #6 FDR
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  2  MLO
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
CEL    10  20    10             
004    15  20  15         
PEN    10               
Buildings Total 31  50  16  31              
Total Units : 140 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice: 1 - FIRST NOTICE 11/10/2016
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

*NO JOBS FOUND WITH YOUR CRITERIA
INSPECTION FOR APPLICATION #: B402578
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/07/2016 06/09/2016 CJH N (35) (0) Y
INSPECTION COMMENTS: NO SHOW
 
(2) 08/10/2016 08/10/2016 EBA N (30) (0) Y
INSPECTION COMMENTS: NO SHOW
 
(3) 09/27/2016 09/28/2016 JTE V (50) (9)
INSPECTION COMMENTS: INSPECTION FAILED, SEE OBJECTION DETAILS.
 
(4) 11/10/2016 11/10/2016 DAH V Y (60) (1)
INSPECTION COMMENTS: DEFECTIVE WIRING IN USE
 
(5) 12/09/2016 12/09/2016 JTE C R (45) (0)
INSPECTION COMMENTS: INSPECTION PASSED, OBJECTIONS REMOVED.

OBJECTION FOR APPLICATION #: B402578
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (315) CONDUCTORS NOT PROPERLY IDENTIFIED
(FLOOR: 004) USING WHITE #12 CONDUCTOR AS EGC FOR AC UNITS
RSLV 09/27/2016 09/27/2016 11/10/2016
 
002 ( 59) AFCI PROTECTION HAS NOT BEEN PROVIDED
(FLOOR: 004)NO ARC FAULT PROTECTION PROVIDED FOR SPIRAL STAIR CASE LIGHTING ONBOTH FLOORS
RSLV 09/27/2016 09/27/2016 11/10/2016
 
003 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(FLOOR: 004)3RD AND 4TH FLOOR ON SAME SERVICE SWITCH SHOULD HAVE MEANS OF EGRESSFROM EACH APT
RSLV 09/27/2016 09/27/2016 11/10/2016
 
004 (999) OTHER
(FLOOR: 004)ALL OUTSIDE GFCI THROUGHOUT NOT WR/TR LISTED ART 406.8 A&B
RSLV 09/27/2016 09/27/2016 11/10/2016
 
005 (999) OTHER
(FLOOR: 004) TWIN BREAKERS NOT LISTED FOR PANEL BUS BAR
RSLV 09/27/2016 09/27/2016 11/10/2016
 
006 (999) OTHER
(FLOOR: 004)ALL BALCONIES WITH INTERIOR ACCESS REQUIRED GFCI RECEPATCLE ART210.52E3
RSLV 09/27/2016 09/27/2016 11/10/2016
 
007 (210) NO MEASURING OF ENERGY CONSUMPTION BY INDIVIDUAL DWELLING UNIT
(ALL FLOORS)LOAD CALCULATION ITS REQUIRED FOR 3RD , 4TH AND 5TH FLOOR ON SAME 60AMP DISC/SW
RSLV 09/27/2016 09/27/2016 12/09/2016
 
008 (109) SUFFICIENT WORK SPACE IS NOT PROVIDED/MAINTAINED
(OPEN SPACE) FOR AC DISC/SW
RSLV 09/27/2016 09/27/2016 11/10/2016
 
009 (999) OTHER
(OPEN SPACE)NO DEDICATED CIRCUIT PROVIDE FOR AC CONDENSER USING ONE HOT LEG OF220V TO FEED GFCI ART 440.4
RSLV 09/27/2016 09/27/2016 11/10/2016
 
010 ( 56) ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED
(ROOF)FIBER OPTIC RACEWAY IS USED AS ELECTRICAL BRANCH CKT. RACEWAY TO &FROM SPLIT UNITTO SVC. DS AT WALL MOUNT UNIT
RSLV 11/10/2016 11/10/2016 12/09/2016