 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/22/2006 |
302213619 |
01 |
A2 |
X SIGNED OFF |
09/12/2006 |
0068615 PE |
Botta |
|
NOT APPLICABLE
|
|
Installation of 6 spilt system electric air conditioners/gas air furnaces
|
|
Work on Floor(s): 001 thru 005
|
| 03/08/2006 |
301898686 |
02 |
A2 |
P APPROVED |
03/27/2006 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004,ROF
|
| 02/24/2006 |
301693246 |
03 |
NB |
P APPROVED |
03/14/2006 |
0015029 RA |
Radusky |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PEN 001 thru 004
|
| 02/14/2005 |
301898686 |
01 |
A2 |
X SIGNED OFF |
08/15/2006 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT THE BUILDING FILED IN CONJUCTI
|
|
Work on Floor(s): CEL,001,002,003,004,ROF
|
| 01/13/2005 |
301885869 |
01 |
DM |
X SIGNED OFF |
02/04/2005 |
|
WILLIAMS |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001
|
| 08/06/2004 |
301803314 |
01 |
A2 |
X SIGNED OFF |
08/11/2006 |
0046307 PE |
Sanchez |
|
NOT APPLICABLE
|
|
Underpinning plans filed in conjunction with New Building construction. N
|
|
Work on Floor(s): CEL,PEN 001 thru 004
|
| 04/26/2004 |
301744860 |
01 |
A3 |
X SIGNED OFF |
09/19/2006 |
0010529 RA |
Radusky |
|
NOT APPLICABLE
|
|
Builder's pavement plan checklist submitted herewith for total lot frontag
|
|
Work on Floor(s): OSP
|
| 01/27/2004 |
301693246 |
02 |
NB |
X SIGNED OFF |
09/22/2006 |
0015029 RA |
Radusky |
|
NOT APPLICABLE
|
|
Work on Floor(s): OSP
|
| 01/27/2004 |
301693246 |
01 |
NB |
X SIGNED OFF |
09/22/2006 |
0015029 RA |
Radusky |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL,PEN 001 thru 004
|
| 06/28/1995 |
300453435 |
01 |
A2 |
R PERMIT-ENTIRE |
04/01/1997 |
0016631 RA |
HATHEWAY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/14/2006 REPAIR LOT LINE MASONRY WALLS REPAIR EXI STING RO
|
|
Work on Floor(s): 1
|