| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/20/2003 |
301558561 |
01 |
SC |
U COMPLETED |
07/01/2003 |
0010529 RA |
Radusky |
|
NOT APPLICABLE
|
| 02/03/2003 |
301194222 |
04 |
NB |
P APPROVED |
02/06/2003 |
0015029 RA |
Radusky |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 005
|
| 10/18/2002 |
301194222 |
03 |
NB |
P APPROVED |
11/15/2002 |
0015029 RA |
Radusky |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 005
|
| 10/10/2002 |
301417786 |
01 |
A3 |
X SIGNED OFF |
06/15/2004 |
0015029 RA |
Radusky |
|
NOT APPLICABLE
|
|
Submit builder's pavement plan checklist for total lot frontage of 80.04 l
|
|
Work on Floor(s): OSP
|
| 08/13/2002 |
301194222 |
02 |
NB |
P APPROVED |
09/03/2002 |
0015029 RA |
Radusky |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 005
|
| 03/20/2002 |
301318857 |
01 |
A2 |
X SIGNED OFF |
11/21/2003 |
0038991 PE |
Joselow |
|
NOT APPLICABLE
|
|
Install HVAC ductwork and mechanical equipment all as shown on drawings fi
|
|
Work on Floor(s): CEL 001 thru 005
|
| 03/05/2002 |
301304005 |
01 |
A2 |
X SIGNED OFF |
10/20/2003 |
0029007 PE |
Hertzber |
|
NOT APPLICABLE
|
|
Structural drawings filed in conjunction with NB: 301194222. No change t
|
|
Work on Floor(s): CEL 001 thru 005
|
| 10/31/2001 |
301241957 |
01 |
A2 |
X SIGNED OFF |
10/27/2003 |
0038991 PE |
Joselow |
|
NOT APPLICABLE
|
|
Install new sprinkler heads and related piping all as shown on drawings fi
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 07/16/2001 |
301194222 |
01 |
NB |
X SIGNED OFF |
07/06/2004 |
0015029 RA |
Radusky |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL 001 thru 005
|