 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/08/2022 |
340689482 |
03 |
A2 |
G PAA FEE DUE |
06/08/2022 |
|
DUENOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 11/15/2021 |
322060808 |
02 |
A2 |
P APPROVED |
04/15/2022 |
|
VARSALON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 09/14/2021 |
340821659 |
01 |
A2 |
X SIGNED OFF |
02/16/2022 |
0021633 RA |
STOUT |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRE
|
|
Work on Floor(s): ROF
|
| 05/19/2021 |
321670713 |
06 |
A2 |
P APPROVED |
09/07/2021 |
|
ASOKAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 05/17/2021 |
340727887 |
02 |
A2 |
P APPROVED |
07/13/2021 |
|
KOENITZE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005 thru 006
|
| 04/06/2021 |
321670713 |
05 |
A2 |
P APPROVED |
04/16/2021 |
0039518 RA |
ASOKAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 07/29/2020 |
340749499 |
01 |
A2 |
X SIGNED OFF |
09/28/2021 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK IN CONJUNCTION WITH COMBINATION AND REAPPORTIONMENT OF EX
|
|
Work on Floor(s): 005 thru 006
|
| 07/24/2020 |
340749480 |
01 |
A2 |
D A/P ENTIRE |
07/24/2020 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/24/2020 STRUCTURAL WORK IN CONJUNCTION WITH COMBINATION
|
|
Work on Floor(s): 005 thru 006
|
| 07/22/2020 |
340746090 |
01 |
A2 |
X SIGNED OFF |
08/27/2021 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING APARTMENT B3H LOCATED ON THE 003 FLOOR. ARCHITECTUR
|
|
Work on Floor(s): 003
|
| 07/02/2020 |
321822881 |
03 |
A2 |
P APPROVED |
07/24/2020 |
|
VARSALON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 06/11/2020 |
321670713 |
04 |
A2 |
P APPROVED |
07/09/2020 |
|
RAVELO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 06/11/2020 |
340730524 |
01 |
A2 |
X SIGNED OFF |
06/16/2023 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
RENOVATION AND RECONFIGURATION OF UNITS B3G1 & B3F1 LOCATED ON THE 003 FLO
|
|
Work on Floor(s): 003
|
| 05/15/2020 |
340727887 |
01 |
A2 |
X SIGNED OFF |
09/28/2021 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
COMBINATION AND REAPPORTIONMENT OF EXISTING APARTMENTS D5G1 & D6F1 LOCATED
|
|
Work on Floor(s): 005 thru 006
|
| 02/13/2020 |
340716390 |
01 |
A2 |
R PERMIT-ENTIRE |
02/20/2020 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION IN CONJUNCTION WITH SLAB INFILL. NO CHANGE IN USE,
|
|
Work on Floor(s): 001,002
|
| 01/10/2020 |
340710993 |
01 |
A3 |
R PERMIT-ENTIRE |
01/15/2020 |
0026644 RA |
SARKAR |
|
NOT APPLICABLE
|
|
STORAGE OF EQUIPMENT, MATERIAL AND DEBRIS UP TO 50 PSF ON TOP OF HEAVY DUT
|
|
Work on Floor(s): OSP
|
| 01/10/2020 |
340710984 |
01 |
A3 |
R PERMIT-ENTIRE |
01/13/2020 |
0026644 RA |
SARKAR |
|
NOT APPLICABLE
|
|
STORAGE OF EQUIPMENT, MATERIAL AND DEBRIS UP TO 50 PSF ON TOP OF HEAVY DUT
|
|
Work on Floor(s): OSP
|
| 12/06/2019 |
340689482 |
02 |
A2 |
P APPROVED |
12/17/2019 |
|
DUENOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 11/18/2019 |
340706294 |
01 |
A3 |
H P/E IN PROCESS |
11/18/2019 |
0094567 PE |
HAIDER |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 01/17/2020 STORAGE OF EQUIPMENT, MATERIAL AND DEBRIS UP TO 50
|
|
Work on Floor(s): OSP
|
| 10/29/2019 |
321670713 |
03 |
A2 |
P APPROVED |
11/04/2019 |
|
RAVELO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 08/08/2019 |
340689482 |
01 |
A2 |
R PERMIT-ENTIRE |
10/11/2019 |
0020319 RA |
DUENOW |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING CORRIDORS AND LOBBY ON FLOORS 001 THU 006. ARCHITEC
|
|
Work on Floor(s): 001 thru 006
|
| 06/17/2019 |
322060808 |
01 |
A2 |
X SIGNED OFF |
05/25/2022 |
0076940 PE |
VARSALON |
|
NOT APPLICABLE
|
|
EXCAVATE EXISTING CONCRETE PIT, SLAB AND UNDERLYING SOIL IN ORDER TO PERFO
|
|
Work on Floor(s): CEL
|
| 05/22/2019 |
340669413 |
01 |
A2 |
X SIGNED OFF |
03/08/2021 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
FILING FOR INTERIOR RENOVATION OF APT C5J WITH ASSOCIATED PLUMBING WORK AS
|
|
Work on Floor(s): 005
|
| 03/22/2019 |
340667549 |
01 |
A2 |
H P/E IN PROCESS |
03/22/2019 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/13/2019 FILING FOR INTERIOR RENOVATION OF APT B3H WITH AS
|
|
Work on Floor(s): 003
|
| 03/20/2019 |
321822881 |
02 |
A2 |
P APPROVED |
03/27/2019 |
|
VARSALON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 03/11/2019 |
321670713 |
02 |
A2 |
P APPROVED |
03/22/2019 |
|
RAVELO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 02/19/2019 |
340662063 |
01 |
A2 |
H P/E IN PROCESS |
02/19/2019 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/22/2019 FILING FOR INTERIOR RENOVATION OF APT B3H WITH AS
|
|
Work on Floor(s): 003
|
| 12/06/2018 |
340648455 |
02 |
A2 |
P APPROVED |
12/10/2018 |
|
KOENITZE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 12/05/2018 |
340648437 |
01 |
A2 |
X SIGNED OFF |
03/19/2021 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
FILING FOR INTERIOR RENOVATION OF APT C4B WITH ASSOCIATED PLUMBING WORK AS
|
|
Work on Floor(s): 004
|
| 12/03/2018 |
340648455 |
01 |
A2 |
X SIGNED OFF |
09/26/2019 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
FILING FOR INTERIOR RENOVATION OF APT D2E WITH ASSOCIATED PLUMBING WORK AS
|
|
Work on Floor(s): 002
|
| 11/09/2018 |
340645680 |
01 |
A3 |
R PERMIT-ENTIRE |
11/16/2018 |
0049434 PE |
SUBEN |
|
NOT APPLICABLE
|
|
STORAGE OF EQUIPMENT, MATERIAL AND DEBRIS UP TO 50 PSF ON TOP OF HEAVY DU
|
|
Work on Floor(s): OSP
|
| 11/09/2018 |
340645662 |
01 |
A3 |
R PERMIT-ENTIRE |
11/16/2018 |
0049434 PE |
SUBEN |
|
NOT APPLICABLE
|
|
STORAGE OF EQUIPMENT, MATERIAL AND DEBRIS UP TO 50 PSF ON TOP OF HEAVY DU
|
|
Work on Floor(s): OSP
|
| 11/01/2018 |
340634601 |
01 |
A2 |
H P/E IN PROCESS |
11/01/2018 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 11/20/2018 FILING FOR INTERIOR RENOVATION OF APT D2E WITH ASS
|
|
Work on Floor(s): 002
|
| 10/31/2018 |
321822881 |
01 |
A2 |
X SIGNED OFF |
11/06/2020 |
0076940 PE |
VARSALON |
|
NOT APPLICABLE
|
|
LIMITED PIPING SYSTEM UPGRADE TO INCLUDE REMOVAL/REPLACEMENT OF STEAM AND
|
|
Work on Floor(s): CEL
|
| 10/02/2018 |
340631490 |
01 |
A2 |
R PERMIT-ENTIRE |
10/12/2018 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
FILING FOR INTERIOR RENOVATION OF APT C5D WITH ASSOCIATED PLUMBING WORKS A
|
|
Work on Floor(s): 005
|
| 09/21/2018 |
340631695 |
01 |
A2 |
X SIGNED OFF |
03/01/2019 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
FILING FOR INTERIOR RENOVATION OF APT B1A WITH ASSOCIATED PLUMBING WORKS A
|
|
Work on Floor(s): 001
|
| 09/06/2018 |
340630936 |
01 |
A2 |
H P/E IN PROCESS |
09/06/2018 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/10/2018 FILING FOR INTERIOR RENOVATION OF APT C5D WITH AS
|
|
Work on Floor(s): 005
|
| 08/03/2018 |
340623855 |
01 |
A2 |
X SIGNED OFF |
03/10/2019 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
FILING FOR INTERIOR RENOVATION OF APT B4C WITH ASSOCIATED PLUMBING WORKS A
|
|
Work on Floor(s): 004
|
| 07/25/2018 |
340618013 |
01 |
A2 |
X SIGNED OFF |
05/14/2019 |
0037557 RA |
KOENITZE |
|
NOT APPLICABLE
|
|
FILING FOR INTERIOR RENOVATION OF APT D4H WITH ASSOCIATED PLUMBING WORK AS
|
|
Work on Floor(s): 004
|
| 07/03/2018 |
340568923 |
02 |
A2 |
P APPROVED |
07/18/2018 |
|
KOENITZE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 06/26/2018 |
340602351 |
02 |
A2 |
P APPROVED |
07/13/2018 |
|
KOENITZE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|