 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/28/2020 |
340726628 |
01 |
A2 |
R PERMIT-ENTIRE |
07/13/2020 |
0035743 RA |
CRONIN |
|
NOT APPLICABLE
|
|
FACADE RESTORATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): ROO 001 thru 012
|
| 01/06/2020 |
321075493 |
02 |
A2 |
P APPROVED |
01/13/2020 |
|
MCDONALD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 06/13/2019 |
321945151 |
01 |
A2 |
X SIGNED OFF |
06/06/2023 |
0025896 RA |
MISRA |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING BATHROOM AND REPLACE BATHROOM FIXTURES. NO CHANGE OF US
|
|
Work on Floor(s): 005
|
| 04/18/2019 |
340673097 |
01 |
A2 |
X SIGNED OFF |
07/10/2019 |
0077136 PE |
SCORRANO |
|
NOT APPLICABLE
|
|
FILING APPLICATION FOR THE DIRECT REPLACEMENT OF (1) COOLING TOWER AT ROOF
|
|
Work on Floor(s): ROF
|
| 03/15/2019 |
321518700 |
02 |
A2 |
P APPROVED |
03/29/2019 |
|
MENAGE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 11/08/2018 |
321075493 |
01 |
A2 |
X SIGNED OFF |
03/09/2020 |
0038763 RA |
MCDONALD |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT 8H. MINOR REMOVAL OF PARTITIONS AND MI
|
|
Work on Floor(s): 008
|
| 09/14/2018 |
340632872 |
01 |
A2 |
D A/P ENTIRE |
09/14/2018 |
0040670 RA |
DEVIN |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 11/13/2018 ALTERATION TYPE 2. SUPERFICIAL RENOVATION OF EXIST
|
|
Work on Floor(s): 008
|
| 07/20/2018 |
321807522 |
01 |
A2 |
X SIGNED OFF |
11/02/2021 |
0030549 RA |
KUNDIG |
|
NOT APPLICABLE
|
|
PROVIDE INTERIOR NON BEARING PARTITIONS, FINISHES, AND RELOCATE BATHROOM
|
|
Work on Floor(s): 009
|
| 06/14/2018 |
321518700 |
01 |
A2 |
R PERMIT-ENTIRE |
03/07/2019 |
0040470 RA |
MENAGE |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION AND PLUMBING WORK AS PER PLAN. THERE IS NO CHANGE TO
|
|
Work on Floor(s): 004
|
| 06/22/2015 |
321130806 |
02 |
A2 |
X SIGNED OFF |
07/22/2016 |
0052834 PE |
SZAKAL |
|
NOT APPLICABLE
|
|
JOB FILED TO INTERIOR RENOVATION INCLUDING RELOCATE HVAC DUCT AND SPRINKLE
|
|
Work on Floor(s): 004
|
| 06/22/2015 |
321130806 |
01 |
A2 |
X SIGNED OFF |
07/22/2016 |
0049458 PE |
TUNG |
|
NOT APPLICABLE
|
|
JOB FILED TO INTERIOR RENOVATION INCLUDING REPLACE CLOSET DOOR, RADIATORS
|
|
Work on Floor(s): 004
|
| 02/14/2014 |
320532991 |
02 |
A2 |
P APPROVED |
03/27/2014 |
|
PEKTAS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 012
|
| 11/12/2013 |
320722937 |
02 |
A2 |
P APPROVED |
11/21/2013 |
|
VARSALON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 07/12/2013 |
320783700 |
01 |
A2 |
J P/E DISAPPROVED |
05/30/2014 |
0076940 PE |
VARSALON |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/01/2015 HURRICANE DAMAGE REPAIR PROGRAM; REPLACE AFFECTED
|
|
Work on Floor(s): CEL
|
| 02/21/2013 |
320722937 |
01 |
A2 |
X SIGNED OFF |
06/23/2015 |
0076940 PE |
VARSALON |
|
NOT APPLICABLE
|
|
HURRICANE DAMAGE REPAIR PROGRAM; INSTALL NEW PIPING FOR DOMESTIC WATER SE
|
|
Work on Floor(s): CEL
|
| 02/19/2013 |
320713313 |
01 |
A2 |
X SIGNED OFF |
02/07/2015 |
0027632 RA |
STOLTZ |
|
NOT APPLICABLE
|
|
RENOVATION OF APARTMENT 9A AT 9TH FLOOR, PLUMBING WORK AS PER PLANS FILED
|
|
Work on Floor(s): 009
|
| 11/09/2012 |
320446807 |
02 |
A3 |
P APPROVED |
11/09/2012 |
|
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/07/2012 |
320532991 |
01 |
A2 |
X SIGNED OFF |
04/22/2014 |
0035158 RA |
PEKTAS |
|
NOT APPLICABLE
|
|
7TH CYCLE FACADE INSPECTION & SAFETY PROGRAM (FISP) REPAIR
|
|
Work on Floor(s): ROF 001 thru 012
|
| 06/15/2012 |
320494390 |
02 |
A2 |
P APPROVED |
06/22/2012 |
0059427 PE |
COLLINS |
|
NOT APPLICABLE
|
|
MECHANICAL, PLUMBING AND SPRINKLER MODIFICATIONS IN CONJUNCTION WITH COMBI
|
|
Work on Floor(s): 012
|
| 06/15/2012 |
320494390 |
01 |
A2 |
P APPROVED |
06/22/2012 |
0030214 RA |
CHIN |
|
NOT APPLICABLE
|
|
COMBINE APARTMENTS 12G AND 12H AS PER TPPN 3/97. MODIFICATIONS TO INTERIM
|
|
Work on Floor(s): 012
|
| 03/09/2012 |
320446807 |
01 |
A3 |
X SIGNED OFF |
05/21/2014 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF 293 LINEAR FT OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 12/01/2011 |
320406930 |
01 |
A2 |
X SIGNED OFF |
10/11/2014 |
0024214 RA |
BALOCCO |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING APARTMENT 7H IN EXISTING MULTIPLE DWELLING. PARTITIONS A
|
|
Work on Floor(s): 007
|
| 05/03/2011 |
320302793 |
02 |
A2 |
X SIGNED OFF |
02/05/2013 |
0057779 PE |
ATHWAL |
|
NOT APPLICABLE
|
|
MECHANICAL,PLUMBING AND SPRINKLER WORK AS SHOWN ON PLANS FILED HEREWITH.
|
|
Work on Floor(s): 007
|
| 05/03/2011 |
320302793 |
01 |
A2 |
X SIGNED OFF |
02/05/2013 |
0020005 RA |
ADJMI |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR RENOVATION AND COMBINATION OF EXISTING APARTMENTS AS
|
|
Work on Floor(s): 007
|
| 02/03/2011 |
320268125 |
01 |
A2 |
X SIGNED OFF |
06/06/2012 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE TWO (2) GAS BOILERS (NYC BOILER NO. 66624-01,-02).
|
|
Work on Floor(s): ROF
|
| 03/16/2010 |
320133057 |
02 |
A2 |
P APPROVED |
08/02/2010 |
0068464 PE |
RINI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 06/09/2011 MECHANICAL, PLUMBING AND SPRINKLER MODIFICATIONS
|
|
Work on Floor(s): 011
|
| 03/16/2010 |
320133057 |
01 |
A2 |
P APPROVED |
08/02/2010 |
0030214 RA |
CHIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/09/2011 COMBINE APARTMENTS 11F AND 11G AS PER TPPN 3/97.
|
|
Work on Floor(s): 011
|
| 06/17/2009 |
310248960 |
02 |
A2 |
P APPROVED |
06/18/2009 |
|
BALOCCO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 02/03/2009 |
310248960 |
01 |
A2 |
X SIGNED OFF |
06/25/2010 |
0024214 RA |
BALOCCO |
|
NOT APPLICABLE
|
|
COMBINE APARTMENT 11B AND 11C. PLUMBING AND PARTITIONS AS PER PLANS. NO CH
|
| 07/25/2008 |
310171514 |
01 |
A2 |
X SIGNED OFF |
07/21/2009 |
0029214 RA |
POVERO |
|
NOT APPLICABLE
|
|
COMBINE APTS. 3 APTS BEING SPLIT INTO 2 APTS, NO CHANGE OF USE OCCUPANCY O
|
|
Work on Floor(s): 010
|
| 09/15/2005 |
301984477 |
02 |
A2 |
D A/P ENTIRE |
09/15/2005 |
0027632 RA |
Stoltz |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/13/2006 Legalize "as-built" conditions of West side eleva
|
|
Work on Floor(s): 006
|
| 08/11/2005 |
301984477 |
01 |
A2 |
X SIGNED OFF |
04/17/2006 |
0027632 RA |
Stoltz |
|
NOT APPLICABLE
|
|
Renovate Apt. 6F. Work to include general construction . No change to use,
|
|
Work on Floor(s): 006
|
| 07/28/2004 |
301796215 |
01 |
A2 |
P APPROVED |
07/28/2004 |
0060293 PE |
Ettinger |
|
NOT APPLICABLE
|
|
Install new gas fired Hot Water Boilers with associated piping as indicate
|
|
Work on Floor(s): ROF
|
| 07/23/2004 |
301795494 |
01 |
A2 |
P APPROVED |
07/23/2004 |
0012475 RA |
DIDONNO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/28/2004 RENOVATE APT. 9G. NO CHANGE TO EGRESS, OCCUPANCY
|
|
Work on Floor(s): 009
|
| 08/25/2003 |
301631848 |
01 |
A2 |
Q PERMIT-PARTIAL |
10/27/2003 |
0022634 RA |
ARIANNA |
|
NOT APPLICABLE
|
|
RENOVATION OF BATHROOM IN RESIDENCE. WOR K TO INCLUDE PARTITION AND PLUM
|
|
Work on Floor(s): 008
|
| 05/30/2003 |
301365573 |
07 |
A1 |
P APPROVED |
05/30/2003 |
0016383 RA |
Fifield |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 012
|
| 04/30/2003 |
301365573 |
06 |
A1 |
P APPROVED |
05/02/2003 |
0016383 RA |
Fifield |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 012
|
| 02/21/2003 |
301514145 |
01 |
A2 |
X SIGNED OFF |
04/21/2003 |
0016383 RA |
Fifield |
|
NOT APPLICABLE
|
|
Facade Rehabilitation as shown on plans filed herewith. No change in use,
|
|
Work on Floor(s): 001,012
|
| 01/21/2003 |
301365582 |
07 |
A2 |
P APPROVED |
01/22/2003 |
0602931 PE |
Ettinger |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
| 01/17/2003 |
301374028 |
03 |
A2 |
P APPROVED |
01/24/2003 |
0602931 PE |
Ettinger |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|