| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 09/27/2018 |
320598340 |
PR |
E LAA FILED |
10/09/2018 |
FSC 000736 |
CENTA |
|
JOB CLOSED 08 27 2020
|
|
Work on Floor(s): MEZ
|
| 07/10/2018 |
321842048 |
PR |
E LAA FILED |
03/08/2019 |
OBI 005087 |
BONELLI |
|
EWN16675_INSTALL A TEMPORARY MOBILE BOILER FOR PROCESSING STEAM. DOB BOILE
|
|
Work on Floor(s): OSP
|
| 12/04/2017 |
321348458 |
PR |
J LAA DISAPPROVED |
01/05/2018 |
MP 001913 |
LATTY |
|
TO TEST 3" GAS PIPING FROM EXIST. ROTARY METER TO EX'G HYDRO THERM BOILER_
|
|
Work on Floor(s): OSP
|
| 10/10/2017 |
321342604 |
PR |
J LAA DISAPPROVED |
10/30/2017 |
MP 001316 |
VALERA |
|
INSTALL A NEW SINK ON EXISTING ROUGHING IN OFFICE SPACE FOR UNIT 403 IN 00
|
|
Work on Floor(s): 004
|
| 04/21/2017 |
321333874 |
PR |
I LAA SIGNED OFF |
10/02/2017 |
MP 001316 |
VALERA |
|
INSTALL A NEW SINK ON EXISTING ROUGHING IN OFFICE SPACE FOR UNIT 906 IN 00
|
|
Work on Floor(s): 009
|
| 09/09/2016 |
320807052 |
PR |
I LAA SIGNED OFF |
02/26/2018 |
FSC 001063 |
LEVINE |
|
INSTALL 1 NEW SPRINKLER HEAD AND REARRANGE 19 SPRINKLER HEADS WITH APPROXI
|
|
Work on Floor(s): 010
|
| 07/25/2012 |
320629502 |
PR |
J LAA DISAPPROVED |
09/07/2012 |
FSC 000328 |
PESANTE |
|
CONTRACTOR TO REARRANGE SPRINKLER HEADS ON THE 2ND FLOOR TO ACCOMMODATE NE
|
|
Work on Floor(s): 002
|
| 03/23/2011 |
310418116 |
PR |
E LAA FILED |
03/25/2011 |
FSC 000328 |
PESANTE |
|
CONTRACTOR TO REARRANGE SPRINKLER HEADS ON THE FIRST FLOOR TO ACCOMMODATE
|
|
Work on Floor(s): 002
|