 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/10/2018 |
340631640 |
01 |
A3 |
X SIGNED OFF |
10/19/2018 |
0035839 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
WINDOW LINTEL REPLACEMENT, BRICK REPLACEMENT AS PER PLAN AND TO SUPERCEED
|
|
Work on Floor(s): 001 thru 003
|
| 09/26/2012 |
320540198 |
01 |
A3 |
P APPROVED |
09/26/2012 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE LINTELS AND BRICKS AS PER PLAN. NO CHANGE IN USE OCCU
|
|
Work on Floor(s): 001 thru 003
|
| 09/14/2012 |
320585238 |
01 |
A3 |
X SIGNED OFF |
07/19/2017 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 05/28/2003 |
301534695 |
01 |
A2 |
X SIGNED OFF |
09/05/2003 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
LEGALIZE BOILER, BURNER AND 2-275 GALLON FUEL OIL TANKS. WORK DONE
|
|
Work on Floor(s): CEL
|
| 06/01/2000 |
301035305 |
01 |
A2 |
R PERMIT-ENTIRE |
07/26/2000 |
0067808 PE |
CHANNING |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW GAS FIRED CHILLER/ HEATER UNITS AND NEW AIR HANDLER
|
|
Work on Floor(s): CEL,001
|