| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/09/2020 |
340773586 |
01 |
A2 |
X SIGNED OFF |
02/17/2022 |
0036233 RA |
ANANTHAK |
|
NOT APPLICABLE
|
|
INSTALLING 10.075 KW DC SOLAR PV ON NYCHA BUILDING ROOF FOR CDG. NO CHANGE
|
|
Work on Floor(s): ROF
|
| 12/07/2014 |
340213398 |
01 |
A3 |
X SIGNED OFF |
06/09/2015 |
0084178 PE |
ALI |
|
NOT APPLICABLE
|
|
INSTALLATION OF 40'-0" LONG,5'-0" WIDTH & 57'-0" HIGH PIPE SCAFFOLD AS IND
|
|
Work on Floor(s): OSP
|
| 11/03/2014 |
340202863 |
01 |
A3 |
X SIGNED OFF |
06/09/2015 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 09/17/2014 |
320740472 |
02 |
A2 |
P APPROVED |
10/17/2014 |
|
OUNDJIAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC,ROF
|
| 09/13/2013 |
340084704 |
01 |
A3 |
X SIGNED OFF |
06/09/2015 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY CHAIN LINK FENCE TO PROTECT PUBLIC AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 09/13/2013 |
340084660 |
01 |
A3 |
X SIGNED OFF |
06/19/2015 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 04/13/2013 |
320740472 |
01 |
A2 |
X SIGNED OFF |
07/01/2015 |
0061376 PE |
OUNDJIAN |
|
NOT APPLICABLE
|
|
EXTERIOR REPAIRS TO INCLUDE ROOFING AND FACADE REPAIRS AT 408-420 KINGSBOR
|
|
Work on Floor(s): FAC,ROF
|
| 05/28/2010 |
320167289 |
01 |
A3 |
X SIGNED OFF |
12/12/2014 |
0082098 PE |
ABOUZID |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 416 LF OF SIDEALK SHED TO PERFORM REMEDIAL WORK.
|
|
Work on Floor(s): OSP
|
| 05/20/2010 |
320001403 |
02 |
A2 |
P APPROVED |
05/26/2010 |
|
NARAGHI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 04/07/2009 |
320001403 |
01 |
A2 |
X SIGNED OFF |
02/07/2011 |
0075800 PE |
NARAGHI |
|
NOT APPLICABLE
|
|
REMOVE 5 EXISTING BOILERS AND INSTALL 4 NEW BOILERS AND ALL ASSOCIATED WOR
|
|
Work on Floor(s): CEL
|
| 11/14/2007 |
310057498 |
01 |
A2 |
X SIGNED OFF |
12/22/2009 |
0046016 PE |
Castella |
|
NOT APPLICABLE
|
|
Installation of non-gas Instantaneous Domestic Hot Water Heater as per pla
|
|
Work on Floor(s): CEL
|
| 01/14/2004 |
301678708 |
01 |
A2 |
X SIGNED OFF |
07/11/2006 |
0020765 RA |
ARCARI |
|
NOT APPLICABLE
|
|
MODIFICATION OF APARTMENTS FOR HANDICAPPED ACCESSIBILITY.
|
|
Work on Floor(s): 001
|
| 12/27/2002 |
301484329 |
01 |
A2 |
P APPROVED |
03/04/2003 |
0043334 PE |
RUNSTADT |
|
NOT APPLICABLE
|
|
PLUMBING WORK AS PER PLANS FILED HEREWIT H. WORK TO BE DONE IN CELLAR ON
|
|
Work on Floor(s): 6
|
| 08/09/1994 |
300383387 |
01 |
A2 |
R PERMIT-ENTIRE |
10/19/1994 |
0009255 RA |
KROOP |
|
NOT APPLICABLE
|
|
PLUMBING AND PARTITION MODIFICATIONS AS SHOWN ON PLANS. NO CHANGE IN USE
|
|
Work on Floor(s): 001,003,005
|