| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/09/2020 |
340773149 |
01 |
A2 |
X SIGNED OFF |
02/04/2022 |
0036233 RA |
ANANTHAK |
|
NOT APPLICABLE
|
|
INSTALLING 23.4 KW DC SOLAR PV ON NYCHA BUILDING ROOF FOR CDG. NO CHANGE O
|
|
Work on Floor(s): ROF
|
| 02/06/2018 |
340582140 |
01 |
A2 |
J P/E DISAPPROVED |
05/24/2018 |
0023685 RA |
KIM |
|
NOT APPLICABLE
|
|
RENOVATION OF APARTMENTS A,B,C,D,E,F, ON THE FIRST FLOOR. NO CHANGE IN USE
|
|
Work on Floor(s): 001
|
| 09/17/2014 |
320739037 |
02 |
A2 |
P APPROVED |
10/21/2014 |
|
OUNDJIAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC,ROF
|
| 01/31/2014 |
340116993 |
01 |
A3 |
X SIGNED OFF |
10/22/2014 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 01/31/2014 |
340116911 |
01 |
A3 |
X SIGNED OFF |
10/22/2014 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. NO CHANGE IN USE,
|
|
Work on Floor(s): OSP
|
| 01/31/2014 |
340116760 |
01 |
A3 |
H P/E IN PROCESS |
01/31/2014 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/31/2014 INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER
|
|
Work on Floor(s): OSP
|
| 01/31/2014 |
340116733 |
01 |
A3 |
H P/E IN PROCESS |
01/31/2014 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/31/2014 INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHE
|
|
Work on Floor(s): OSP
|
| 01/30/2014 |
340116537 |
01 |
A3 |
H P/E IN PROCESS |
01/30/2014 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/31/2014 INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHE
|
|
Work on Floor(s): OSP
|
| 04/15/2013 |
320739037 |
01 |
A2 |
X SIGNED OFF |
03/10/2015 |
0061376 PE |
OUNDJIAN |
|
NOT APPLICABLE
|
|
EXTERIOR REPAIRS TO INCLUDE ROOFING AND FACADE REPAIRS AT 342-354 KINGSBOR
|
|
Work on Floor(s): FAC,ROF
|
| 07/22/2010 |
320191243 |
01 |
A3 |
X SIGNED OFF |
05/13/2014 |
0083149 PE |
ALAUDDIN |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 280 LF OF SIDEALK SHED TO PERFORM REMEDIAL WORK.
|
|
Work on Floor(s): OSP
|
| 11/14/2007 |
310048873 |
01 |
A2 |
X SIGNED OFF |
12/22/2009 |
0046016 PE |
Castella |
|
NOT APPLICABLE
|
|
Installation of non-gas Instantaneous Domestic Hot Water Heater as per pla
|
|
Work on Floor(s): CEL
|
| 01/14/2004 |
301678682 |
01 |
A2 |
X SIGNED OFF |
07/11/2006 |
0020765 RA |
ARCARI |
|
NOT APPLICABLE
|
|
MODIFICATION OF APARTMENTS FOR HANDICAPPED ACCESSIBILITY. NO
|
|
Work on Floor(s): 001
|
| 12/26/2002 |
301484276 |
01 |
A2 |
P APPROVED |
03/04/2003 |
0043334 PE |
KUNSTADT |
|
NOT APPLICABLE
|
|
PLUMBING WORK AS PER PLANS FILED HEREWITH. THERE WILL BE NO
|
|
Work on Floor(s): 6
|