 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/15/2014 |
320860868 |
02 |
A2 |
P APPROVED |
10/28/2014 |
|
RAZZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 HEREWITH FILING FOR PARTIAL DEMOLITION OF A
|
|
Work on Floor(s): ROO 001 thru 002
|
| 04/15/2014 |
320941086 |
01 |
DM |
X SIGNED OFF |
02/12/2015 |
0087797 PE |
HELMAN |
|
NOT APPLICABLE
|
|
FULL DEMOLITION OF REAR STRUCTURE, USING HAND AND MECHANICAL MEANS.
|
|
Work on Floor(s): 001 thru 002
|
| 01/21/2014 |
320860868 |
01 |
A2 |
X SIGNED OFF |
11/07/2014 |
0090955 PE |
RAZZAK |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR PARTIAL DEMOLITION OF A SECONDARY BUILDING ON THE LOT.
|
|
Work on Floor(s): ROO 001 thru 002
|