| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/07/2007 |
310003251 |
01 |
A3 |
R PERMIT-ENTIRE |
09/04/2007 |
0046665 PE |
FRIEDLAN |
|
NOT APPLICABLE
|
|
INSTALL PREFABRICATED STORAGE CAGE INSIDE YARD AREA. NO CHANGE TO
|
|
Work on Floor(s): OSP
|
| 07/25/2006 |
302199804 |
01 |
A2 |
P APPROVED |
07/25/2006 |
0079049 PE |
Rosenzwe |
|
NOT APPLICABLE
|
|
Proposed to raise roof in two areas and install steel framework for suppor
|
|
Work on Floor(s): 001 thru 001
|
| 04/15/2003 |
301524456 |
01 |
A2 |
R PERMIT-ENTIRE |
05/29/2003 |
0068615 PE |
Botta |
|
NOT APPLICABLE
|
|
Installation of seven modular natural gas engine generators. No change in
|
|
Work on Floor(s): 001
|
| 03/08/1995 |
300418894 |
01 |
A2 |
R PERMIT-ENTIRE |
03/22/1995 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
INSTALL (5) AIR HANDLING UNITS AND NEW GAS METER AND PIPING CONNECTED
|
|
Work on Floor(s): OSP,ROF
|
| 11/09/1994 |
300402197 |
01 |
A2 |
X SIGNED OFF |
12/21/1994 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
.NSTALL (3) PACKAGED HERMETIC RECIPROCAT ING LIQUID CHILLERS AND (1) WAT
|
|
Work on Floor(s): 001,ROF
|
| 07/21/1994 |
300356843 |
01 |
A2 |
X SIGNED OFF |
10/19/1994 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
INSTALL (3) A/C UNITS AND REPLACE (1) A/C UNIT PER PLANS. NO CHANGE IN
|
|
Work on Floor(s): ROF
|
| 10/30/1992 |
300210457 |
01 |
A2 |
X SIGNED OFF |
02/19/1993 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
INSTALL WATER COOLING SYSTEM FOR EXISTIN G PROCESS EQUIPMENT.NO CHANGE I
|
|
Work on Floor(s): 1, ROF
|
| 05/12/1992 |
300171828 |
01 |
A2 |
X SIGNED OFF |
06/10/1992 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE (2)OIL BURNER.NO CHANGE IN EGRES S,OCCUPANCY,OR USE UNDER THIS A
|
|
Work on Floor(s): 1
|