 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/02/2016 |
340419032 |
01 |
A3 |
X SIGNED OFF |
06/27/2017 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHAN
|
|
Work on Floor(s): OSP
|
| 09/02/2016 |
340419023 |
01 |
A3 |
X SIGNED OFF |
07/11/2017 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHAN
|
|
Work on Floor(s): OSP
|
| 05/20/2016 |
321376818 |
01 |
A2 |
R PERMIT-ENTIRE |
07/14/2016 |
0088575 PE |
SULLIVAN |
|
NOT APPLICABLE
|
|
FACADE RESTORATION AND ROOF REPLACEMENT AS INDICATED ON PLANS FILED HERWIT
|
|
Work on Floor(s): FAC,ROF 001 thru 004
|
| 09/12/2012 |
320583551 |
01 |
A2 |
X SIGNED OFF |
02/10/2014 |
0032305 RA |
METZ |
|
NOT APPLICABLE
|
|
INTERIOR PARTITIONS AT BASEMENT LEVEL AS PER PLANS FILED HEREWITH.NO CHANG
|
|
Work on Floor(s): BAS
|
| 05/19/2010 |
320162569 |
01 |
A2 |
R PERMIT-ENTIRE |
05/19/2010 |
0068464 PE |
RINI |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW BOILER
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 03/02/2010 |
310155293 |
02 |
A2 |
P APPROVED |
03/24/2010 |
|
RINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): UNG,CEL,BAS,ROF 1 thru 4
|
| 03/02/2010 |
310155300 |
02 |
A2 |
P APPROVED |
03/24/2010 |
|
RINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 1 thru 4
|
| 06/19/2008 |
310155300 |
01 |
A2 |
X SIGNED OFF |
06/15/2010 |
0068464 PE |
RINI |
|
NOT APPLICABLE
|
|
NEW 8 FAMILY,DWELLING,CELLAR,BASEMENT,1-5 ROOF
|
|
Work on Floor(s): CEL,BAS 1 thru 4
|
| 06/17/2008 |
310155293 |
01 |
A2 |
X SIGNED OFF |
09/27/2010 |
0068464 PE |
RINI |
|
NOT APPLICABLE
|
|
COMPLETE NEW GAS DISTRIBUTION SYSTEM INCLUDING METERS,RISERS AND DISTRIBUT
|
|
Work on Floor(s): UNG,CEL,BAS,ROF 1 thru 4
|
| 06/03/2008 |
310003901 |
02 |
NB |
P APPROVED |
06/18/2008 |
|
Goldner |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 08/17/2007 |
310003901 |
01 |
NB |
X SIGNED OFF |
09/29/2010 |
0012486 RA |
Goldner |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 06/06/2007 |
302373045 |
01 |
A3 |
X SIGNED OFF |
09/14/2010 |
0069956 PE |
Flynn |
|
NOT APPLICABLE
|
|
Installation of light duty sidewalk shed for 46 ft tall building. No chan
|
|
Work on Floor(s): 001
|
| 10/19/2005 |
301865337 |
03 |
NB |
R PERMIT-ENTIRE |
12/21/2005 |
0021546 RA |
Mangus |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 02/01/2008
|
|
Work on Floor(s): CEL,001,002,003,004,005
|
| 10/17/2005 |
302028035 |
01 |
A3 |
X SIGNED OFF |
04/15/2010 |
0069956 PE |
Flynn |
|
NOT APPLICABLE
|
|
Underpinning of adjacent foundations at 326 St Marks Ave and 105 Underhill
|
|
Work on Floor(s): 001
|
| 08/16/2005 |
301991156 |
01 |
A2 |
P APPROVED |
12/05/2005 |
0074124 PE |
GURBALL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/02/2009 INSTALL SPRINKLER SYSTEM, HVAC AND BOILER FOR NEW
|
|
Work on Floor(s): CEL 001 thru 005
|
| 07/26/2005 |
301982665 |
01 |
DM |
X SIGNED OFF |
07/10/2006 |
|
HERTZ |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001
|
| 06/07/2005 |
301939614 |
01 |
A3 |
X SIGNED OFF |
09/29/2010 |
0012486 RA |
GOLDNER |
|
NOT APPLICABLE
|
|
BPP FILING TOTAL LOT FRONTAGE 82'-3" BNP 05-486
|
|
Work on Floor(s): OSP
|
| 04/28/2005 |
301865337 |
02 |
NB |
R PERMIT-ENTIRE |
12/21/2005 |
0070916 PE |
Gulino |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 02/01/2008
|
|
Work on Floor(s): CEL,001,002,003,004,005
|
| 11/22/2004 |
301865337 |
01 |
NB |
Q PERMIT-PARTIAL |
12/26/2007 |
0012486 RA |
GOLDNER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/01/2008
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|