 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 07/16/2018 |
340619067 |
PR |
I LAA SIGNED OFF |
12/07/2018 |
MP 000411 |
HELD |
|
REPLACE BATHTUB FOR STALL SHOWER ON THE 4TH FLOOR APARTMENT #4D. INSTALL O
|
|
Work on Floor(s): 004
|
| 07/16/2018 |
340619058 |
PR |
I LAA SIGNED OFF |
12/07/2018 |
MP 000411 |
HELD |
|
PROPOSED WORK SUMMARY: REPLACE BATHTUB FOR STALL SHOWER ON THE 6TH FLOO
|
|
Work on Floor(s): 006
|
| 02/01/2017 |
340468327 |
PR |
I LAA SIGNED OFF |
08/01/2017 |
MP 000411 |
HELD |
|
REPLACE BATHTUB WITH STALL SHOWER IN APARTMENT #15B ON THE 15TH FLOOR. I
|
|
Work on Floor(s): 015
|
| 10/12/2016 |
340432721 |
PR |
I LAA SIGNED OFF |
07/26/2018 |
MP 000411 |
HELD |
|
REPLACE BATHTUB WITH STALL SHOWER IN APARTMENT #14B ON THE 14TH FL._REPLA
|
|
Work on Floor(s): 014
|
| 01/15/2016 |
340344461 |
PR |
I LAA SIGNED OFF |
09/19/2016 |
MP 002352 |
FISHER |
|
REPLACE BATHTUB WITH STALL SHOWER IN APARTMENT 6C ON THE 6TH FLOOR. REPLAC
|
|
Work on Floor(s): 006
|
| 12/15/2015 |
340335890 |
PR |
I LAA SIGNED OFF |
10/24/2016 |
MP 000411 |
HELD |
|
REPLACE BATHUB FOR STALL SHOWER ON THE 11TH FLOOR APARTMENT #11L. INSTALL
|
|
Work on Floor(s): 011
|
| 10/14/2015 |
340314323 |
PR |
I LAA SIGNED OFF |
12/03/2015 |
MP 000411 |
HELD |
|
REPLACE BATHUB FOR STALL SHOWER ON THE 10TH FLOOR APARTMENT #10B. INSTALL
|
|
Work on Floor(s): 010
|
| 08/11/2015 |
340291026 |
PR |
I LAA SIGNED OFF |
10/26/2015 |
MP 000411 |
HELD |
|
REPLACE BATHUB FOR STALL SHOWER ON THE 16TH FLOOR APARTMENT #16E. INSTALL
|
|
Work on Floor(s): 016
|
| 05/20/2015 |
340262655 |
PR |
E LAA FILED |
05/20/2015 |
MP 002113 |
VINOGRAD |
|
IN APT #2D ON THE 2ND FL REPLACE TO EXISTING ROUGHING (1) TUB, (1) TOILET,
|
|
Work on Floor(s): 002
|
| 05/01/2015 |
340255798 |
PR |
I LAA SIGNED OFF |
09/23/2015 |
MP 002229 |
PATSKEVI |
|
DIRECT REPLACEMENT OF (1) BATH TUB WITH SHOWER AND (1) WATER CLOSET, (1)
|
|
Work on Floor(s): 008
|
| 07/15/2014 |
320636834 |
PR |
I LAA SIGNED OFF |
12/09/2014 |
MP 001785 |
KHASIS |
|
LAA IS FILED FOR DIRECT PLUMBING FIXTURES REPLACEMENT ON EXISTING LOCATION
|
|
Work on Floor(s): 005
|
| 06/24/2014 |
320635988 |
PR |
I LAA SIGNED OFF |
09/15/2014 |
MP 000957 |
ABRAMO |
|
APT #8H REPLACE PLUMBING FIXTURES ON EXISTING ROUGHING: ONE (1) WATER CLOS
|
|
Work on Floor(s): 008
|
| 04/18/2014 |
320685184 |
PR |
I LAA SIGNED OFF |
06/02/2014 |
MP 000411 |
HELD |
|
THE PURPOSE OF THIS LAA IS TO ISOLATE & TEST ENTUIRE GAS HEADER ON GROUND
|
|
Work on Floor(s): GND
|
| 04/18/2014 |
320685175 |
PR |
I LAA SIGNED OFF |
07/09/2014 |
MP 000411 |
HELD |
|
THE PURPOSE OF THE LAA IS TO ISOLATE AND TEST ENTIRE GAS HEADER ON GROUND
|
|
Work on Floor(s): GND 001 thru 017
|
| 10/26/2012 |
320658061 |
PR |
J LAA DISAPPROVED |
11/14/2012 |
MP 000411 |
HELD |
|
JOB WITHDRAWN 01 24 2013
|
|
Work on Floor(s): 010
|
| 10/23/2012 |
320634970 |
PR |
I LAA SIGNED OFF |
11/23/2012 |
MP 000411 |
HELD |
|
REPLACE BATHUB FOR STALL SHOWER ON THE 10TH FLOOR APARTMENT #10L
|
|
Work on Floor(s): 010
|
| 07/15/2009 |
310281263 |
PR |
I LAA SIGNED OFF |
08/14/2009 |
MP 001660 |
BROFSKY |
|
REPLACE 11-YARD DRAINS & RUN APPROX 200 FT OF 3/4" & 50 FT OF 3" PIPING.
|
|
Work on Floor(s): OSP
|
| 09/23/1999 |
300878619 |
PR |
I LAA SIGNED OFF |
11/29/1999 |
MP 001524 |
CRITELLI |
|
REPLACEMENT: INSTALL A WEIL MCLAIN BOILER, 175,000 BTU'S, MEA 159-75 IN
|
|
Work on Floor(s): CEL
|